Solar panels and EV chargers in Placer County
Ground solar side/rear setback: 7.5 feet minimum for 6 feet tall or less (zone may allow less); taller needs 10 to 15 feet.
Key points
- Ground solar: Ground solar side/rear setback: 7.5 feet minimum for 6 feet tall or less (zone may allow less); taller needs 10 to 15 feet.
Each rule below links to the section of the Placer County Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Placer County's code says
| EV charger permit |
|
|---|---|
| Solar height and setbacks |
|
| Solar permit process |
|
| Review time |
|
Who this affects
HomeownersContractorsDesigners
Frequently asked questions
Do I need a permit for solar panels or an EV charger in Placer County?
Ground solar side/rear setback: 7.5 feet minimum for 6 feet tall or less (zone may allow less); taller needs 10 to 15 feet.
General information, not legal advice.
Ask about a specific Placer County property
Ask GoCodebook how Placer County's solar panels and EV chargers rules apply to your situation and get an answer that cites the section.