California ADU rules · Los Angeles County

Can I Build an ADU in Manhattan Beach?

Yes — you can build an ADU in Manhattan Beach. California's statewide ADU law requires every city, including Manhattan Beach, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Manhattan Beach's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

Local rule

2 total (1 ADU + 1 JADU, or 2 ADUs but only 1 detached); if JADU present, only 1 ADU allowed

Only one detached ADU allowed per lot; if a JADU is present, only one ADU is allowed in addition.

MBMC § 10.74.040(A); § 10.74.030(F)

Units on a multifamily lot

Local rule

New multifamily: 1 ADU per lot; Redevelopment: up to 25% of pre-existing units as ADUs (rounded down), not more than number of pre-existing units

New multifamily limited to 1 ADU per lot; redevelopment follows state 25% rule.

MBMC § 10.74.040(A); § 10.74.030(F)

Junior ADU (JADU)

Local rule

Allowed

JADUs allowed only on single-family lots.

MBMC § 10.74.050

Size & height

Max detached ADU size

Local rule

1,200 sq ft

Studio/1-bed: 850 sq ft; 2+ beds: 1,200 sq ft. Local max matches state ceiling.

MBMC § 10.74.040(B)(1)

Max attached ADU size

Local rule

50% of primary, not to exceed detached ADU maximums (850/1,200 sq ft)

Attached ADU max is 50% of SFR, capped at detached ADU max.

MBMC § 10.74.040(B)(1)(a)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

Local rule

500 sq ft

JADU minimum is 220 sq ft; must be within existing/proposed SFR.

MBMC § 10.74.050(1)

Max height

CA state law

16 ft

16 ft baseline; cities must allow 18 ft within ½ mi of a major transit stop or where the primary dwelling is two-story, and 20 ft on a lot with a multistory multifamily building.

Cal. Gov. Code § 66321 (size minimums & height)

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

CA state law

No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Separation from main house

Local rule

5 ft

Detached ADUs must be at least 5 ft from other buildings on the lot.

MBMC § 10.74.040(B)(4)

Parking

Parking required

Local rule

Up to 1 space

1 off-street space per ADU; JADUs require no additional parking.

MBMC § 10.74.040(F); § 10.74.050(7)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

Local rule

Not required

No replacement parking required if garage/carport is converted.

MBMC § 10.74.040(F)(4)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Only for a JADU

Owner-occupancy required for JADU (owner must occupy primary or JADU); not required for ADUs.

MBMC § 10.74.050(6); § 10.74.030(D)(2)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

Local rule

ADU permit (ministerial), Building permit

Both ADU permit and building permit required.

MBMC § 10.74.030(A), (D)(4)

Manhattan Beach-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Sprinkler requirement if primary dwelling requires sprinklers

ADU must have sprinklers if primary dwelling does

Manhattan Beach allows only one detached ADU per lot and requires a 5-foot separation from other buildings. Detached ADUs above or below a garage may be up to 26 feet tall.

Frequently asked questions

Can I build an ADU in Manhattan Beach?

Yes. California's statewide ADU law requires Manhattan Beach to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Manhattan Beach?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Manhattan Beach?

Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.

Is parking required for an ADU in Manhattan Beach?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Manhattan Beach?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Manhattan Beach?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • MBMC Chapter 10.74; Ord. No. 21-0001 (eff. Feb. 19, 2021)
  • MBMC § 10.74.040(A); § 10.74.030(F)
  • MBMC § 10.74.050
  • MBMC § 10.74.040(B)(1)
  • MBMC § 10.74.040(B)(1)(a)
  • MBMC § 10.74.050(1)
  • MBMC § 10.74.040(B)(4)
  • MBMC § 10.74.040(F); § 10.74.050(7)
  • MBMC § 10.74.040(F)(4)
  • MBMC § 10.74.050(6); § 10.74.030(D)(2)
  • MBMC § 10.74.030(A), (D)(4)
  • MBMC § 10.74.040(E)
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Manhattan Beach's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Manhattan Beach Planning before relying on it.