California ADU rules · Madera County

Can I Build an ADU in Madera?

Yes — you can build an ADU in Madera. California's statewide ADU law requires every city, including Madera, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Madera's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

CA state law

1 ADU + 1 JADU

At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Units on a multifamily lot

CA state law

Conversion ADUs (≥1, up to 25% of units) + up to 8 detached

Conversions of non-livable space (at least 1, or up to 25% of existing units) plus up to 8 detached ADUs on a lot with existing multifamily — never exceeding the number of existing units. JADUs are single-family only.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

Local rule

1,200 sq ft

Local maximum for detached ADUs is 1,200 sq ft.

MMC § 10-3.513(D)(2)

Max attached ADU size

Local rule

50% of existing residential sq ft or 1,200 sq ft, whichever is less

Attached ADUs capped at 50% of primary or 1,200 sq ft, whichever is less.

MMC § 10-3.513(D)(1)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

CA state law

16 ft

16 ft baseline; cities must allow 18 ft within ½ mi of a major transit stop or where the primary dwelling is two-story, and 20 ft on a lot with a multistory multifamily building.

Cal. Gov. Code § 66321 (size minimums & height)

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

Local rule

20 ft front setback for detached ADUs

Detached ADUs must be set back 20 ft from the front property line.

MMC § 10-3.513(D)(4)

Separation from main house

Local rule

None required

Detached ADU must be within 100 ft of primary dwelling; no portion closer than 10 ft to a primary dwelling on an adjacent lot.

MMC § 10-3.513(D)(5)

Parking

Parking required

Local rule

Up to 1 space

1 off-street parking space per ADU, with state exemptions.

MMC § 10-3.513(E)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

Local rule

Required

Replacement parking required if garage/carport/covered parking is converted or demolished for ADU.

MMC § 10-3.513(E)(3)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Only for a JADU

Local code recites an owner-occupancy requirement, but California Gov. Code § 66315 bars owner-occupancy requirements for ADUs — enforceable for JADUs only. Verify the JADU covenant with the city.

MMC § 10-3.513(B)(3)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

Local rule

Zoning Administrator Permit, Building Permit

Both Zoning Administrator and Building Permits required.

MMC § 10-3.513(B)

Madera-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Historic Register Properties

ADUs/JADUs not allowed on or adjacent to properties listed in the California Register of Historic Places.

Madera sets a 1,200 sq ft max for both detached and attached ADUs, requires 5 ft side/rear and 20 ft front setbacks, and mandates owner-occupancy unless preempted by state law. ADUs are prohibited on or adjacent to historic register properties.

Frequently asked questions

Can I build an ADU in Madera?

Yes. California's statewide ADU law requires Madera to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Madera?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Madera?

Side and rear setbacks are limited to 4 ft. 20 ft front setback for detached ADUs.

Is parking required for an ADU in Madera?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is required.

How long does ADU approval take in Madera?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Madera?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Madera Municipal Code § 10-3.513 (Accessory Dwelling Units), Ord. 949 C.S., 12-6-17
  • MMC § 10-3.513(D)(2)
  • MMC § 10-3.513(D)(1)
  • MMC § 10-3.513(D)(4)
  • MMC § 10-3.513(D)(5)
  • MMC § 10-3.513(E)
  • MMC § 10-3.513(E)(3)
  • MMC § 10-3.513(B)(3)
  • MMC § 10-3.513(B)
  • MMC § 10-3.513(C)(2)
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Madera's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Madera Planning before relying on it.

Will an ADU work on your Madera lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related