SECTION 13. DRAFTING

Internal Revenue Bulletin 2014-53 · 2026-10-03 edition · updated 2026-10-04 · United States

INFORMATION

The principal author of this notice is Jennifer C. Bernardini of the Office of Associate Chief Counsel (Passthroughs & Special Industries). For further information regarding this notice contact Ms. Bernardini on (202) 317-6853 (not a toll-free call).

APPENDIX A

AGREEMENT

[Insert taxpayer’s name, address, and identifying number] (“Taxpayer”) and the Commissioner of Internal Revenue (“Commissioner”) make the following Agreement:

WHEREAS:

  1. On or before [insert date and year], Taxpayer submitted to the Internal Revenue Service (“Service”), an application for certification under the § 48B Phase III

Bulletin No. 2014–53 1007 December 29, 2014

cent of the total fuel input (as defined in section 3.04 of Notice 2014–81 and including fuels identified in § 48B(c)(2) and any other fuel input) required by the Project for normal plant operations (as defined in section 3.04(2) of Notice 2014–81) for the production of chemical feedstocks, liquid transportation fuels, or co-production of electricity, the Project ceases to be investment credit property and the recapture rules of § 50(a) apply.

  1. Taxpayer understands that it cannot claim the qualifying advanced coal project credit under § 48A for any qualified investment for which the qualifying gasification project credit is allowed under § 48B.

  2. Taxpayer understands that if Taxpayer elects to claim the qualifying gasification project credit on the qualified expenditures paid or incurred by Taxpayer during the taxable year(s) during which the Project is under construction and the Project ceases to be a qualifying gasification project (whether before, at the time, or after the Project is placed in service), rules similar to the recapture rules in § 50(a)(2)(A) through (D) apply.

  3. This Agreement applies only to Taxpayer. Taxpayer must notify the Service within 90 days of the acquisition of the Project by any other person (a successor in interest). A successor in interest that plans to claim the § 48B credit allocated to the Project must request permission to execute a new Agreement with the Service. If the request is granted, the new Agreement must be executed no later than the due date (including extensions) of the successor in interest’s Federal income tax return for the taxable year in which the transfer occurs. If the interest is acquired at or before the time the Project is placed in service and the successor in interest fails to execute a new Agreement, the § 48B Phase III credit in the amount allocated to the Project as specified in WHEREAS clause 3 is fully forfeited. If the interest is acquired after the time the Project is placed in service and the successor in interest fails to execute a new Agreement, the Project ceases to be investment credit property and the recapture rules of § 50(a) apply.

program described in Notice 2014–81 (“Application for § 48B Certification”);

  1. Taxpayer’s application for § 48B certification is for the qualifying gasification project (the “Project”) described below—

(a) The name of the Project is [insert name as provided in Taxpayer’s application];

(b) The Project will be located in or near [insert city and state];

(c) The Project site in subsection (b) above may be changed only if the change is consistent with the objectives of the qualifying gasification project program, is requested by the taxpayer that received the credit allocation (or a successor in interest that has timely entered into an Agreement regarding the Project with the Service), and involves moving the Project site to improve the potential to capture and sequester CO2 emissions (if applicable), reduce costs of transporting feedstock, and serve a broader customer base. The Service will not agree to a project site change if the dollar amount of tax credits allocated to the taxpayer under § 48B would increase as a result of the site change or if the Project would not have been originally certified had such modification been included in the taxpayer’s application;

(d) The Project will have a total synthesis gas capacity (as defined in section 3.03 of Notice 2014–81) of at least [insert number] total MMBtu per hour of synthesis gas. The synthesis gas is composed primarily of carbon monoxide and hydrogen for direct use or subsequent chemical or physical conversion; and

(e) The fuels identified in § 48B(c)(2) will at all times cumulatively comprise at least 90 percent of the total fuel input (as defined in section 3.04 of Notice 2014–81 and including fuels identified in § 48B(c)(2) and any other fuel input) required by the Project for normal plant operations (as defined in section 3.04(2) of Notice 2014–81) for the production of chemical feedstocks, liquid transportation fuels, or co-production of electricity.

  1. On [insert date of acceptance letter issued under section 4.02(9) of Notice 2014–81], the Service accepted Taxpayer’s application for § 48B certification for the Project and allocated qualifying gas

ification project credit under § 48B Phase III in the amount of $[insert number] to the Project.

  1. Taxpayer understands that if the Project is not placed in service by Taxpayer within 7 years of [insert the date in WHEREAS clause 3] as determined under section 3.05 of Notice 2014–81, the § 48B Phase III credit in the amount allocated to the Project as specified in WHEREAS clause 3 is fully forfeited. Taxpayer must provide evidence to the Service that the Project has been timely placed in service.

  2. Taxpayer understands that if the plans for the Project change in any significant respect from the plans set forth in the application for DOE certification (as defined in section 5.02 of Notice 2014–81) and the application for § 48B certification (as defined in section 5.03 of Notice 2014–81), other than a project site change agreed to by the Service as described in WHEREAS clause 2(c), the acceptance of Taxpayer’s application for § 48B certification on the date specified in WHEREAS clause 3 is void and the § 48B Phase III credit in the amount allocated to the Project as specified in WHEREAS clause 3 is fully forfeited.

  3. Taxpayer understands that if the Project fails to satisfy any of the requirements in § 48B for a qualifying gasification project—

(a) at the time the Project is placed in service, the § 48B Phase III credit allocated to the Project as specified in WHEREAS clause 3 is fully forfeited; and

(b) after the Project is placed in service (and after satisfying all such requirements at the time the Project is placed in service), the Project ceases to be investment credit property and the recapture rules of § 50(a) apply.

  1. Taxpayer understands that, if the Project fails to use gasification technology as defined in § 48B(c)(2) or is not carried out by an eligible entity (as defined in section 3.02 of Notice 2014–81), the § 48B Phase III credit in the amount of allocated to the Project as specified in WHEREAS clause 3 is fully forfeited.

  2. Taxpayer understands that if, at any time, the fuels identified in § 48B(c)(2) with respect to gasification technology do not cumulatively comprise at least 90 per

December 29, 2014 1008 Bulletin No. 2014–53

NOW IT IS HEREBY DETERMINED AND AGREED FOR FEDERAL INCOME TAX PURPOSES THAT:

  1. The total amount of the § 48B Phase III credit that Taxpayer will claim for the Project under this Agreement on account of the acceptance of Taxpayer’s application for § 48B certification cannot exceed the amount specified in WHEREAS clause 3;

  2. This Agreement does not express whether the Taxpayer has met any of the

requirements to receive tax credits under § 48B; and

  1. This Agreement is limited and applies only to Taxpayer. A successor in interest that plans to claim § 48B credit allocated to the Project must request permission to execute a new Agreement with the Service.

THIS AGREEMENT IS FINAL AND CONCLUSIVE EXCEPT:

  1. The matter it relates to may be reopened in the event of fraud, malfeasance, or misrepresentation of a material fact;

Taxpayer: [insert name and identifying number]

By: __________________________________ Date Signed: ____________

[insert name] Title: [insert title]

[insert taxpayer’s name]

Commissioner of Internal Revenue

By: _________________________________ Date Signed: ____________

Kathy J. Robbins Title: Industry Director, Natural Resources & Construction

APPENDIX B

APPLICATION FOR DOE

CERTIFICATION

REQUEST FOR SUPPLEMENTAL APPLICATION INFORMATION FOR DOE

The Internal Revenue Service (“Service”) and the Department of Energy (“DOE”) seek to certify applications that demonstrate a high likelihood of being successfully implemented by the applicants. To qualify, projects must be technically and economically feasible and use the appropriate gasification technology.

This request for submission of supplemental application information:

  • Describes the information to be provided by the applicant seeking a DOE certification of feasibility, and

  • Lists the evaluation criteria and Program Policy Factors that are to be used by DOE in the evaluation of applications.

If, after review by DOE, a project is determined to be feasible, DOE will

provide a DOE certification of feasibility to the Service. The Service will then accept or reject the taxpayer’s application for certification of the tax credits.

In conducting this evaluation, DOE may utilize assistance and advice from qualified personnel from other Federal agencies and/or non-conflicted contractors. DOE will obtain assurances in advance from all evaluators that application information shall be kept confidential and used only for evaluation purposes. DOE reserves the right to request clarifications and/or supplemental information from some or all applicants through written submissions and/or oral presentations, but is not required to do so.

Notice is given that DOE may determine whether or not to provide a certification to the Service at any time after the application has been received, without further exchanges or discussions. Therefore, all applicants are advised to submit their most complete and responsive application.

Applications will not be returned.

  1. It is subject to the Internal Revenue Code sections that expressly provide that effect be given to their provisions notwithstanding any law or rule of law; and

  2. If it relates to a tax period ending after the date of this Agreement, it is subject to any law enacted after such date, which applies to the tax period.

By signing, the parties certify that they have read and agreed to the terms of this Agreement.

INFORMATION TO BE SUBMITTED IN AN APPLICATION FOR DOE CERTIFICATION

A. General

This request, together with the information in relevant sections of Notice 2014–81 includes all the information needed to complete an application for DOE certification. All applications shall be prepared in accordance with this request in order to provide a standard basis for evaluation and to ensure that each application will be uniform as to format and sequence.

Each application should clearly demonstrate the applicant’s capability, knowledge, and experience regarding the requirements described herein.

Applicants should fully address the requirements of Notice 2014–81 and this request and not rely on the presumed background knowledge of reviewers. DOE may reject an application that does not follow the instructions regarding the organization and content of the application when the nature of the deviation

Bulletin No. 2014–53 1009 December 29, 2014

achieving the goals proposed for the project) as would be needed to allow DOE to confirm that the technical requirements of § 48B are met. Specifically, the applicant should:

  • Provide evidence sufficient to demonstrate that the proposed technology will employ gasification technology as defined in § 48B(c)(2).

  • Present information sufficient to justify the total amount of synthesis gas (as defined in § 48B(c)(2)) to be produced by the project (synthesis gas capacity).

  • Provide the total MMBtu/hr of the synthesis gas (HHV) at the gasifier outlet.

  • Provide evidence sufficient to ensure that fuels identified in § 48B(c)(2) will comprise 90 percent of the total fuel input (fuels identified in § 48B(c)(2) and any other fuel input) for the project. Provide the total quantities of CO, H2, CH4, CO2, and water in the synthesis gas.

  • Identify the domestic industry for which the proposed project is intended to be used.

  • Identify the specific products and quantities produced by the proposed project, providing sufficient evidence to support claims.

  • Provide evidence that indicates, for projects using nonrenewable fuels, the gasification technology design reflects reasonable consideration for, and if applicable, is capable of, accommodating equipment necessary to capture CO2 for later use or sequestration. Include the project status and relevant information from ongoing engineering activities. Also include in an appendix any engineering report or reports used by the applicant to develop the project and to estimate costs and operating performance.

  • If applicable, provide evidence sufficient to demonstrate that the project includes equipment which separates and permanently sequesters CO2 emissions and provide the percentage of the project’s total CO2 emissions that are separated and permanently sequestered. The CO2 separation and sequestration percentage shall be calculated based on the amount of CO2 sent for permanent sequestration and the total CO2 which would otherwise

and/or omission precludes meaningful review of the application.

B. Unnecessarily Elaborate Applications

Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective application are not desired. Elaborate art work, graphics and pictures are neither required nor encouraged.

C. Application Submission for DOE Certification

The application submission to DOE must include the information and documentation required by relevant sections of Notice 2009–23.

An application to DOE will not be considered in the § 48B Phase III allocation round unless it is postmarked by March 2, 2015. One electronic version on a USB flash drive or a CD of the application must be submitted to:

Gina Mick National Energy Technology

Laboratory 3610 Collins Ferry Road Morgantown, WV 26507

Note that under section 5.03(4) of Notice 2014–81, one electronic version of the Application for DOE certification must be sent to the Service as part of the application for § 48B certification. The application for § 48B certification will not be considered in the § 48B Phase III allocation round under this notice unless it is submitted to the Service by March 2, 2015.

THE INFORMATION REQUIRED BY THIS REQUEST MUST BE SUBMITTED USING THE FORMAT AND THE HEADINGS OF THE PROJECT INFORMATION MEMORANDUM AS DESCRIBED BELOW.

To aid in evaluation, applications shall be clearly and concisely written and logically assembled. All pages of each part shall be appropriately numbered and identified with the name of the applicant and the date.

The application, including the Project Information Memorandum, MUST be for

matted in one of the following software applications:

  • Microsoft Word tm 2010 or later edition

  • Microsoft Excel tm 2010 or later edition

  • Adobe Acrobat tm PDF 7.0 or later edition

Financial models should be submitted using the Excel tm spreadsheet and must include working calculation formulas and clearly identified assumptions.

The applicant is responsible for the integrity and structure of the electronic files. DOE will not be responsible for reformatting, restructuring or converting any files submitted in response to this request.

The Project Information Memorandum, excluding Appendices, shall not exceed seventy-five (75) pages. Pages in excess of the page limitation will not be considered for evaluation. All text shall be typed, single spaced, using 12 point font, 1 inch margins, and unreduced 8-1/2-inch by 11-inch pages. Illustrations and charts shall be legible with all text in legible font. Pages shall be sequentially numbered. Except as otherwise noted herein the page guidelines previously set forth constitute a limitation on the total amount of material that may be submitted for evaluation. No material may be incorporated in any application by reference as a means to circumvent the page limitation.

D. Project Information Memorandum

1. Summary and Introduction

  • Description of the Project

  • Financing and Ownership Structure X Include a list of all IRC section

48B tax credit allocations

  • Description of the main parties to the project, including background, ownership and related experience

  • Current Project Status and Schedule to Beginning of Construction

2. Technology and Technical Information

Provide a description of the proposed technology, including sufficient supporting information (such as vendor guarantees, process flow diagrams, equipment descriptions, information on each major process unit and the total plant, compositions of major streams, and the technical plan for

December 29, 2014 1010 Bulletin No. 2014–53

tion for the oxygen supplier. Example 3: an industrial gasification plant planning to sell CO2 for enhanced oil recovery (“EOR”) should provide an agreement for such a transaction indicating the annual CO2 purchase quantity, expected project lifetime sales, CO2 capacity of the site for EOR, and EOR site ownership.

5. Utilization of Project Output

Provide evidence that demonstrates that a majority of the proposed project output is reasonably expected to be acquired or utilized.

Provide a projection of the anticipated costs of electricity and other marketable by-products produced by the plant.

Provide documentation establishing that a majority of the output of the plant is reasonably expected to be acquired or utilized. Such documentation should be signed by authorizing officials of both the buyer and seller, and may include: Sales Agreements, Letters of Intent, Memoranda of Understanding, Option Agreements, and Power Purchase Agreements.

Describe any energy sales arrangements that exist or that may be contemplated ( e.g., a Power Purchase Agreement or Energy Sales Agreement) and summarize their key terms and conditions.

Include as an appendix any independent Energy Price Market Study that has been done in connection with this project, or if no independent market study has been completed, provide a copy of the applicant-prepared market study.

Identify and describe any firm arrangements to sell non-power output, such as CO2, and provide any evidence of such arrangements. If the project produces a product in addition to power, include as an appendix any related market study of price and volume of sales expected for that product.

6. Project Economics

Describe the project economics and provide satisfactory evidence of economic feasibility as demonstrated through the financial forecast and the underlying project assumptions. The project economic and financial assumptions should be clearly stated and explained.

be released into the atmosphere as industrial emission of greenhouse gas. Also provide CO2 separation, capture, sequestration, and emission quantities on a metric tons per hour basis and on a metric tons per year basis, both under normal plant operating conditions.

3. Applicant’s Capability to Accomplish the Technical Objectives

Provide a narrative supporting the applicant’s capability to accomplish the technical objectives of the proposed project, including supporting documentation demonstrating that the applicant has assembled a team that is formally committed to participate in the proposed project.

Provide information to support that the applicant has assembled a team with the skills and resources needed to implement the project as proposed.

Provide signed agreements or letters from team members demonstrating that the proposed team members are fully committed to the project.

Provide information, including examples of prior similar projects completed by applicant, engineering-procurementconstruction (“EPC”) contractor, and suppliers of major subsystems or equipment, which support the capabilities of the applicant and its team members to design, construct, permit, and operate the facility. The applicant should demonstrate that the team members have a corporate history of successful completion of similar projects.

Provide information to support that key personnel of the applicant and its team members have knowledge, experience, and adequate degree of involvement to successfully implement the project.

Include the project status and relevant information from ongoing engineering activities. Also include in an appendix any engineering report or reports used by the applicant to develop the project and to estimate costs and operating performance. Include copies of any signed agreements to support project status claims regarding preliminary design studies, front-end engineering design (“FEED”) and EPC-type agreements.

4. Site Control and Ownership

Provide evidence that demonstrates the overall feasibility of implementing the project at the proposed site.

Provide evidence that the applicant owns or controls a site in the United States of sufficient size to allow the proposed project to be constructed and operated on a long-term basis. Documentation such as a deed demonstrating the applicant owns the project site, a signed option to purchase the site from the site owner, or a letter of intent signed by the site owner and stating the site owner’s intent to sell the site to the applicant should be provided.

Describe the current infrastructure at the site available to meet the needs of the project.

Provide documentation supporting applicant’s conclusion that the proposed site can fully meet all environmental, feedstock supply, water supply, transmission interconnect and public policy requirements. Such documentation may include signed agreements, letters of intent, or term sheets relating to feedstock supply, water supply, and product (e.g. CO2) transportation etc., and regulatory approvals supporting the key claims.

Provide detailed plans, schedules and status updates, particularly for sites with pre-existing conditions that could impact the proposed project. Pre-existing conditions may include, but are not limited to, sites with mandated environmental remediation efforts; brown-field sites that will require building demolition; or sites requiring substantial rerouting of existing roads, railroads, transmission lines, or pipelines prior to the start of the project.

Applicants must select one “proposed site.” However, projects with key physical or logistical elements that require close integration with another system for the project to succeed should provide information on all integrated systems regardless of where they are located. Example 1: a gasification plant designed to operate exclusively on coal from a to-be-opened mine should provide supporting documentation for the new mine. Example 2: an oxygen-blown gasification plant planning to purchase oxygen from a third party who will construct a plant exclusively for this project should provide documenta

Bulletin No. 2014–53 1011 December 29, 2014

Show calculation of the amount of tax credit applied for based on allowable cost and any existing IRC Section 48B tax credit allocations.

7. Project Development and Financial Plan

Provide the total project budget and major plant costs ( e.g., development, operating, capital, construction, and financing costs). Provide the estimated annual budget for and source of project development costs from the time of the application until the beginning of construction, including legal, engineering, financial, environmental, overhead, and other development costs. Describe the overall approach to project development and financing sufficient to demonstrate project viability. Provide a complete explanation of the source and amount of project equity. Provide a complete explanation of the source and amount of project debt. Provide the audited financial statements for the most recently ended three fiscal years and quarterly interim financial statements for the current fiscal year for (a) the applicant, (b) for any of the project parties providing funding, and (c) for any third party funding source. If the applicant or another party does not have audited financial statements, the applicant or the party should provide equivalent financial statements prepared by the applicant or the party, in accordance with Generally Accepted Accounting Principles, and certified as to accuracy and completeness by the Chief Financial Officer of the party providing the statements.

For internally financed projects, provide evidence that the applicant has sufficient assets to fund the project with its own resources. Identify any internal approvals required to commit such assets. Include in an appendix copies of any board resolution or other approval authorizing the applicant to commit funds and proceed with the project.

For projects financed through debt instruments either unsecured or secured by assets other than the project, provide evidence that the applicant has sufficient creditworthiness to obtain such financing along with a discussion of the status of such instruments. Identify any internal approvals required to commit the applicant

to pursue such financing. Include in an appendix, copies of any board resolution or other approval authorizing the applicant to commit to such financing.

For projects financed through investor equity contributions, describe the source and status of each contribution. Discuss each investor’s financial capability to meet its commitments. Include in an appendix copies of any executed investment agreements.

If financing through a public offering or private placement of either debt or equity is planned for the project, provide the expected debt rating for the issue and an explanation of applicant’s justification for the rating. Describe the status of any discussions with prospective investment bankers or other financial advisors.

Include as an appendix copies of any existing funding commitments or expressions of interest from funding sources for the project.

For projects employing nonrecourse or limited recourse debt financing, provide a complete discussion of the approach to, and status of, such financing. In an appendix: (1) provide an Excel based financial model of the project, with formulas, so that review of the model calculations and assumptions may be facilitated; and (2) provide pro-forma project financial, economic, capital cost, and operating assumptions, including detail of all project capital costs, development costs, interest during construction, transmission interconnection costs, other operating expenses, and all other costs and expenses.

8. Project Contract Structure

Describe the current status of each of the agreements set forth below. Include as an appendix copies of the contracts or summaries of the key provisions of each of the following agreements:

  • Power Purchase Agreement (if not fully explained in section 5 above).

  • Raw Material Input: describe the source and price of raw material inputs for the project. Include as an appendix any studies of price and amount of raw materials that have been prepared. Include a summary of any supply contracts and a signed copy of the contracts.

  • Transportation: explain the arrangements for transporting project inputs and outputs, including costs.

  • Operations & Maintenance Agreement: include a summary of the terms and conditions of the contract and a copy of the contract.

  • Shareholders Agreement: summarize key terms and include the agreement as an appendix.

  • Engineering, Procurement and Construction Agreement: describe the key terms of the existing or expected EPC contract arrangement, including firm price, liquidated damages, hold-backs, performance guarantees, etc.

  • Water Supply Agreement: confirm the amount, source, and cost of water supply.

  • Transmission Interconnection Agreement: explain the requirements to connect to the system and the current status of negotiations in this respect.

  • If CO2 is separated by the project and is to be sold to a third party for sequestration, provide a Sales Agreement and provide specifics, such as CO2 sales (metric tons per year), expected project lifetime sales (metric tons), potential CO2 capacity of the site for sequestration (metric tons), technology and site suitability for sequestration, and sequestration site ownership and operation.

9. Permits Including Environmental Authorizations

Provide a complete list of all Federal, state, and local permits, including environmental authorizations or reviews, necessary to commence construction of the project.

Explain what actions have been taken to date to satisfy the required authorizations and reviews, and the status of each.

Provide a description of the applicant’s plan to obtain and complete all necessary permits, and environmental authorizations and reviews.

10. Project Schedule

Provide an overall project schedule which includes technical, business, financial, permitting and other factors to sub

December 29, 2014 1012 Bulletin No. 2014–53

stantiate that the project will meet the 7 year placed-in-service requirement.

The project schedule should be comprehensive and provide sufficient detail to demonstrate how applicant will meet the placed-in-service requirement. The schedule should demonstrate that the applicant understands the required tasks, and has allowed realistic times for accomplishing the technical and financial tasks. The schedule should include the milestone accomplishments needed to obtain the financing for the project.

11. Appendices

  • Copy of internal or external engineering reports.

  • Copy of site plan, together with evidence that applicant owns or controls a site. Examples of evidence would include a deed, or an executed contract to purchase or lease the site.

  • Information supporting applicant’s conclusion that the site is fully acceptable as the project site with respect to environment, raw material supply, water supply, transmission interconnect, and public policy reasons.

  • Power Purchase or Energy Sales Agreement

  • Energy Market Study.

  • Financial Model of project.

  • Financial statements for the applicant and other project funding sources for the most recently ended three fiscal years, and quarterly interim financial statements for the current fiscal year.

  • Expressions of interest or commitment letters from funding sources.

  • Copies of executed project contracts. If no contract currently exists, provide a summary of the expected terms and conditions.

  • List of all Federal, state, and local permits, including environmental authorizations or reviews, necessary to commence construction.

E. Supplemental Technical and Financial Guidance for Project Information Memorandum

Technology and Technical Information

It is important that the applicant select a specific gasification system for the proj

ect. Without that decision, it is difficult to provide the necessary specific design information needed for DOE to evaluate the project feasibility with respect to performance, emissions, outputs of major streams as well as capital and operating costs.

Project Economics

Applicants should demonstrate the project’s economic feasibility and financial viability by providing a clear statement and explanation of the economic and financial assumptions made by the applicant, and a financial forecast for the project. The financial forecast should flow logically from the applicant’s assumptions and be consistent with them. Applicants should include assumptions regarding financial and economic issues that may not be included in the project costs but have a direct impact on the project. The examples given in the “Site Control and Ownership” section are relevant here and their impact on the project economics should be discussed here.

Project Development and Financial Plan

The information provided by the applicant in this section should demonstrate that the applicant’s financial plan for developing the project is feasible and that the applicant will have access to necessary financing. The applicant should explain the source and timing for obtaining all financing, including the project development costs. It is important that the applicant explain and provide evidence that it has the capacity to fund the preconstruction project development costs, together with a budget for and description of those costs. Note that financial information is required for the applicant and for any other funding source.

Project Contract Structure

This section requires that the applicant demonstrate an understanding of the commercial contracting process and show progress in establishing the framework of contracts and agreements that a project typically requires. Applicants should show that their intended contract structure is reasonable and that their assumptions

relative to price, terms, and conditions are consistent with current market conditions. Evidence of final agreements, agreements in principle, or summaries of terms and conditions between the applicant and contract counterparties should be provided, if available.

EVALUATION CRITERIA

A. Criteria of § 48B

Gasification projects will be evaluated on whether they meet all the requirements of § 48B including:

Technical: whether the applicant has demonstrated the capability to accomplish the technical objectives.

Site: whether the site requirement for ownership or control has been met, and that the site is suitable for the proposed project.

Economic: whether the project has demonstrated economic feasibility, taking into consideration the submitted financial and project development, structural information, and financial plan.

Schedule: the applicant’s ability to meet the 7 year placed-in-service requirement.

B. Program Policy Factors to Be Used by DOE in the Evaluation of Applications

Section 48B identifies minimum requirements for consideration for the qualifying gasification project credit, including the project’s technical feasibility, cost, and applicant’s ability. In the event that there are more qualified (certifiable) applications than there are available amount of tax credits, DOE will apply additional factors to rank eligible projects based on their ability to advance gasification technology beyond its current state.

If there are more certified applications than available amount of § 48B Phase III credits, DOE will rank the certified projects based on evaluation of the following Program Policy Factors. In ranking certified projects, highest priority will be given to the Primary Ranking Factor. Secondary and Tertiary Ranking Factors will be taken into account to rank projects that are not clearly differentiated on the basis of the Primary Ranking Factor, with higher priority given to the Secondary Ranking Factors than to Tertiary Ranking Factors.

Bulletin No. 2014–53 1013 December 29, 2014

cases described in Announcement 2008– 111. Announcement 2011–6, 2011–4 I.R.B. 433, published January 24, 2011, extended, without change, the mediation pilot for collection cases, through December 31, 2012.

This revenue procedure consolidates the procedures for mediation of examination cases and issues and collection cases and issues into a single revenue procedure. This revenue procedure also makes other changes to Rev. Proc. 2009–44, set forth in Section 3. Accordingly, this revenue procedure supersedes Rev. Proc. 2009–44 and Announcements 2008–111 and 2011–6.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Internal Revenue Bulletin 2014-53

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.