Skip to content

Introduction

SECTION 3. OPTION TO ELECT

Internal Revenue Bulletin 2012-50 · 2026-10-03 edition · updated 2026-10-04 · United States

CYCLE E AS INDIVIDUALLY DESIGNED GOVERMENTAL PLAN’S SECOND REMEDIAL AMENDMENT CYCLE

.01 The Service recognizes that sponsors of governmental plans face unique issues in the process of securing approval for amendments from the governing body with authority to consider plan amendments during legislative sessions. In order to have greater flexibility to deal with these issues, the sponsor of an individually designed governmental plan may elect Cycle E (instead of Cycle C) as the plan’s second remedial amendment cycle. The election is made by filing a determination letter application for the plan during the one-year submission period for the second Cycle E (February 1, 2015 through January 31, 2016). No election form or notice to the Service is required.

.02 If the sponsor of an individually designed governmental plan elects to file a determination letter application for the plan during the Cycle E submission period, all requirements for an individually designed plan submitted for a determina

tion letter during the Cycle E submission period are applicable to the sponsor’s plan, including the requirement to amend the plan for all applicable items on the Cycle E Cumulative List and the requirement to timely adopt any interim amendments that are required for a governmental plan during Cycle C and Cycle D.

.03 A sponsor’s election of Cycle E, instead of Cycle C, as the second remedial amendment cycle for an individually designed governmental plan applies only to that plan and only to that cycle. For any subsequent remedial amendment cycle, the plan’s cycle will revert to Cycle C. Therefore, if a sponsor of a governmental plan files a determination letter application for the plan during the second Cycle E submission period ending on January 31, 2016, the determination letter that is issued will expire at the end of the third Cycle C submission period (January 31, 2019).

.04. A determination letter issued to a sponsor of an individually designed governmental plan for the initial remedial amendment cycle ordinarily expires at the end of the second Cycle C (January 31, 2014), regardless of whether the sponsor elected Cycle E as the plan’s initial cycle

2012–50 I.R.B. 709 December 10, 2012

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Internal Revenue Bulletin 2012-50

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.