SECTION 12. PAPERWORK
Internal Revenue Bulletin 2009-16 · 2026-10-03 edition · updated 2026-10-04 · United States
REDUCTION ACT
The collection of information contained in this notice has been reviewed and approved by the Office of Management and Budget in accordance with the Paperwork Reduction Act (44 U.S.C. § 3507) under control number 1545–2002.
An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the collection of information displays a valid OMB control number.
April 20, 2009 808 2009–16 I.R.B.
APPENDIX A
CLOSING AGREEMENT
Under § 7121 of the Internal Revenue Code, [insert taxpayer’s name, address, and identifying number] (“Taxpayer”) and the Commissioner of Internal Revenue (“Commissioner”) make the following closing agreement:
WHEREAS:
On or before March [insert date and year], Taxpayer submitted to the Internal Revenue Service (“Service”), an application for certification under the Phase II gasification program described in Notice 2009–23 (“Application for § 48B Certification”);
Taxpayer’s Application for § 48B Certification is for the qualifying gasification project (the “Project”) described below—
(1) The Project will be located at [insert address or other identifying designation];
(2) The Project will have a total synthesis gas capacity (as defined in section 3.03 of Notice 2009–23) of at least [insert number] total MMBtu per hour of synthesis gas. The synthesis gas is composed primarily of carbon monoxide and hydrogen for direct use or subsequent chemical or physical conversion;
(3) The fuels identified in § 48B(c)(2) will at all times cumulatively comprise at least 90 percent of the total fuel input (as defined in section 3.04(1) of Notice 2009–23 and including fuels identified in § 48B(c)(2) and any other fuel input) required by the Project for normal plant operations (as defined in section 3.04(2) of Notice 2009–23) for the production of chemical feedstocks, liquid transportation fuels, or co-production of electricity; and
- On [insert date of acceptance letter issued under section 4.02(11) of Notice 2009–23], the Service accepted Taxpayer’s Application for § 48B Certification for the Project and allocated a qualifying gasification project credit under § 48B in the amount of $[insert number] to the Project.
NOW IT IS HEREBY DETERMINED AND AGREED FOR FEDERAL INCOME TAX PURPOSES THAT:
The total amount of the qualifying gasification project credit to be claimed for the Project under § 48B(a) must not exceed $[insert the number in WHEREAS clause #3].
If the Project is not placed in service by Taxpayer within 7 years of [insert the date in WHEREAS clause #3], the qualifying gasification project credit in the amount of $[insert the number in WHEREAS clause #3] allocated to the Project is fully forfeited.
If the Project fails, at any time during the applicable recovery period (as defined in § 168(c)) for such project, to attain or maintain the separation and sequestration of CO 2 emissions required by § 48B(d)(1)(B), the qualifying gasification project credit in the amount of $[insert the number in WHEREAS clause #3] allocated to the Project is fully forfeited.
If the plans for the Project change in any significant respect from the plans set forth in the application for DOE certification (as defined in section 5.02 of Notice 2009–23) and the Application for § 48B Certification (as defined in section 5.03 of Notice 2009–23) and, under section 6.03 of Notice 2009–23, the acceptance of Taxpayer’s Application for § 48B Certification on [insert the date in WHEREAS clause #3] is void, the qualifying gasification project credit in the amount of $[insert the number in WHEREAS clause #3] allocated to the Project is fully forfeited.
(1) If the Project fails to use gasification technology as defined in § 48B(c)(2) or is not carried out by an eligible entity (as defined in section 3.02 of Notice 2009–23), the qualifying gasification project credit in the amount of $[insert the number in WHEREAS clause #3] allocated to the Project is fully forfeited.
(2) If, at any time, the fuels identified in § 48B(c)(2) with respect to the gasification technology for the Project do not cumulatively comprise at least 90 percent of the total fuel input (as defined in section 3.04(1) of Notice 2009–23 and including fuels identified in § 48B(c)(2) and any other fuel input) required by the Project for normal plant operations (as defined in section 3.04(2) of Notice 2009–23) for the production of chemical feedstocks, liquid transportation fuels, or co-production of electricity, the Project ceases to be investment credit property and the recapture rules of § 50(a) apply.
Taxpayer will not claim the qualifying advanced coal project credit under § 48A for any qualified investment for which the qualifying gasification project credit is allowed under § 48B.
If Taxpayer elects to claim the qualifying gasification project credit on the qualified progress expenditures paid or incurred by Taxpayer during the taxable year(s) during which the Project is under construction and the Project ceases to be a qualifying gasification project (whether before, at the time, or after the Project is placed in service), rules similar to the recapture rules in § 50(a)(2)(A) through (D) apply.
2009–16 I.R.B. 809 April 20, 2009
- This agreement applies only to Taxpayer. Any successor in interest must execute a new closing agreement with the Service. If the interest is acquired at or before the time the Project is placed in service and the successor in interest fails to execute a new closing agreement, the qualifying gasification project credit in the amount of $[insert the number in WHEREAS clause #3] allocated to the Project is fully forfeited. If the interest is acquired after the time the Project is placed in service and the successor in interest fails to execute a new closing agreement, the Project ceases to be investment credit property and the recapture rules of § 50(a) apply.
THIS AGREEMENT IS FINAL AND CONCLUSIVE EXCEPT:
The matter it relates to may be reopened in the event of fraud, malfeasance, or misrepresentation of a material fact;
It is subject to the Internal Revenue Code sections that expressly provide that effect be given to their provisions (including any stated exception for § 7122) notwithstanding any law or rule of law; and
If it relates to a tax period ending after the date of this Closing Agreement, it is subject to any law enacted after such date, which applies to the tax period.
By signing, the parties certify that they have read and agreed to the terms of this Closing Agreement.
Taxpayer: [insert name and identifying number]
By: Date Signed:
[insert name]
Title: [insert title]
[insert taxpayer’s name]
Commissioner of Internal Revenue
By: Date Signed:
[insert name]
Title: [insert title]
I have examined the specific matters involved and recommend the acceptance of the proposed agreement.
(Receiving Officer) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Title) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Date Signed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I have reviewed the specific matters involved and recommend the acceptance of the proposed agreement.
(Receiving Officer) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Title) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Date Signed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
April 20, 2009 810 2009–16 I.R.B.
APPENDIX B
APPLICATION FOR DOE CERTIFICATION
REQUEST FOR SUPPLEMENTAL APPLICATION INFORMATION FOR DOE
The Internal Revenue Service (“Service”) and the Department of Energy (“DOE”) seek to certify applications that demonstrate a high likelihood of being successfully implemented by the applicants. To qualify, projects must be technically and economically feasible and use the appropriate gasification technology.
This request for submission of supplemental application information:
• Describes the information to be provided by the applicant seeking a certification of…¶
If, after review by the DOE a project is determined to be feasible, DOE will provide a DOE certificate of feasibility to the Service. The Service will then accept or reject the taxpayer’s application for certification of the tax credits.
In conducting this evaluation, the DOE may utilize assistance and advice from qualified personnel from other Federal agencies and/or non-conflicted contractors. DOE will obtain assurances in advance from all evaluators that application information shall be kept confidential and used only for evaluation purposes. DOE reserves the right to request clarifications and/or supplemental information from some or all applicants through written submissions and/or oral presentations.
Notice is given that DOE may determine whether or not to provide a certification to the Service at any time after the application has been received, without further exchanges or discussions. Therefore, all applicants are advised to submit their most complete and responsive application.
Applications will not be returned.
INFORMATION TO BE SUBMITTED FOR DOE CERTIFICATION APPLICATION
A. General
This request, together with the information in sections 5.02, 6.01, and 6.02 of Notice 2009–23 includes all the information needed to complete an application for DOE certification. All applications shall be prepared in accordance with this request in order to provide a standard basis for evaluation and to ensure that each application will be uniform as to format and sequence.
Each application should clearly demonstrate the applicant’s capability, knowledge, and experience in regard to the requirements described herein.
Applicants should fully address the requirements of Notice 2009–23 and this request and not rely on the presumed background knowledge of reviewers. DOE may reject an application that does not follow the instructions regarding the organization and content of the application when the nature of the deviation and/or omission precludes meaningful review of the application.
B. Unnecessarily Elaborate Applications
Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective application are not desired. Elaborate art work, graphics and pictures are neither required nor encouraged.
C. Application Submission for DOE Certification
The application submission to DOE must include the information and documentation required by sections 5.02, 6.01, and 6.02 of Notice 2009–23.
An application will not be considered in the allocation round conducted in 2009–10 unless it is postmarked by November 2, 2009. (If allocation rounds are conducted in 2010–11 and 2011–12, applications must be postmarked by November 1 of the year in which the allocation round begins.) One paper copy and one electronic version on a floppy disc or a CD of the Application must be submitted to:
Melissa Robe National Energy Technology Laboratory 3610 Collins Ferry Road Morgantown, WV 26507
Note that under section 5.03(3) of Notice 2009–23, one paper copy and one electronic version must be sent to the Service as part of the application for § 48B certification. The application for § 48B certification will not be considered in the allocation round conducted in 2009–10 unless it is submitted to the Service by March 1, 2010. (If allocation rounds are conducted in 2010–11 and 2011–12, applications must be postmarked by March 1 of the year in which the allocation round ends.)
2009–16 I.R.B. 811 April 20, 2009
THE INFORMATION REQUIRED BY THIS REQUEST MUST BE SUBMITTED USING THE FORMAT AND THE HEADINGS OF THE PROJECT INFORMATION MEMORANDUM AS DESCRIBED BELOW.
To aid in evaluation, applications shall be clearly and concisely written and logically assembled. All pages of each part shall be appropriately numbered and identified with the name of the applicant and the date.
The application, including the Project Information Memorandum, MUST be formatted in one of the following software applications:
• Microsoft Word tm 2002 or later edition • Microsoft Excel tm 2002 or later edition •…¶
Financial models should be submitted using the Excel tm spreadsheet and must include calculation formulas and assumptions.
The applicant is responsible for the integrity and structure of the electronic files. The DOE will not be responsible for reformatting, restructuring or converting any files submitted under this announcement.
The Project Information Memorandum, excluding Appendices, shall not exceed seventy-five (75) pages. Pages in excess of the page limitation will not be considered for evaluation. All text shall be typed, single spaced, using 12 point font, 1 inch margins, and unreduced 8–1/2-inch by 11-inch pages. Illustrations and charts shall be legible with all text in legible font. Pages shall be sequentially numbered. Except as otherwise noted herein the page guidelines previously set forth constitute a limitation on the total amount of material that may be submitted for evaluation. No material may be incorporated in any application by reference as a means to circumvent the page limitation.
D. Project Information Memorandum
1. Summary and Introduction
a. Description of the Project b. Financing and Ownership Structure c. Description of the main parties to the project, including background, ownership and related experience d. Current Project Status and Schedule to Beginning of Construction
2. Technology and Technical Information
Provide a description of the proposed technology, including sufficient supporting information (such as vendor guarantees, process flow diagrams, equipment descriptions, information on each major process unit and the total plant, compositions of major streams, and the technical plan for achieving the goals proposed for the project) as would be needed to allow DOE to confirm that the technical requirements of § 48B are met. Specifically, the applicant should:
• Provide evidence sufficient to demonstrate that the proposed technology will employ…¶
• Present information sufficient to justify the total amount of synthesis gas (as…¶
• Provide the total MMBtu/hr of the synthesis gas (HHV) at the gasifier outlet. •…¶
identified in § 48B(c)(2) and any other fuel input) for the project. Provide the total quantities of CO, H2, CH4, CO, and 2 water in the synthesis gas.
• Identify the domestic industry for which the proposed project is intended to be used.…¶
• Provide evidence that indicates, for projects using nonrenewable fuels, the…¶
able consideration for, and is capable of, accommodating equipment necessary to capture CO 2 for later use or sequestration. Include the project status and relevant information from ongoing engineering activities. Also include in an appendix any engineering report or reports used by the applicant to develop the project and to estimate costs and operating performance.
• Provide evidence sufficient to demonstrate that the project includes equipment which…¶
percent of such project’s total carbon dioxide (CO ) emissions. The CO separation, capture, sequestration, and emission 2 2 values shall be reported on metric tons per hour and metric tons per year basis under normal plant operating conditions. The CO 2 separation and sequestration percentages shall be calculated based on the total CO2 which would otherwise be released into the atmosphere as industrial emission of greenhouse gas.
April 20, 2009 812 2009–16 I.R.B.
3. Applicant’s Capability to Accomplish the Technical Objectives
Provide a narrative supporting the applicant’s capability to accomplish the technical objectives of the proposed project, including supporting documentation demonstrating that the applicant has assembled a team that is formally committed to participate in the proposed project.
Provide information to support that the applicant has assembled a team with the skills and resources needed to implement the project as proposed.
Provide signed agreements or letters from team members demonstrating that the proposed team members are fully committed to the project.
Provide information, including examples of prior similar projects completed by applicant, engineering-procurement-construction (EPC) contractor, and suppliers of major subsystems or equipment, which support the capabilities of the applicant and its team members to design, construct, permit, and operate the facility. The applicant should demonstrate that the team members have a corporate history of successful completion of similar projects.
Provide information to support that key personnel of the applicant and its team members have knowledge, experience, and adequate degree of involvement to successfully implement the project.
Include the project status and relevant information from ongoing engineering activities. Also include in an appendix any engineering report or reports used by the applicant to develop the project and to estimate costs and operating performance. Include copies of any signed agreements to support project status claims regarding preliminary design studies, front-end engineering design (FEED), and EPC-type agreements.
4. Site Control and Ownership
Provide evidence that the applicant owns or controls a site in the United States of sufficient size to allow the proposed project to be constructed and operated on a long-term basis. Documentation such as a deed demonstrating the applicant owns the project site, a signed option to purchase the site from the site owner, or a letter of intent signed by the site owner and stating the site owner’s intent to sell the site to the applicant should be provided.
Describe the current infrastructure at the site available to meet the needs of the project.
Provide documentation supporting applicant’s conclusion that the proposed site can fully meet all environmental, feedstock supply, water supply, transportation and public policy requirements. Such documentation may include signed agreements, letters of intent, or term sheets relating to feedstock supply, water supply, and product ( e.g. CO ) transportation etc., and regulatory approvals 2 supporting the key claims.
Provide detailed plans, schedules and status updates, particularly for sites with pre-existing conditions that could impact the proposed project. Pre-existing conditions may include, but are not limited to, sites with mandated environmental remediation efforts; brown-field sites that will require building demolition; or sites requiring substantial rerouting of existing roads, railroads, or pipelines prior to the start of the project.
Applicants must select one “proposed site.” However, projects with key physical or logistical elements that require close integration with another system for the project to succeed should provide information on all integrated systems regardless of where they are located. Example 1: a gasification plant designed to operate exclusively on coal from a to-be-opened mine should provide supporting documentation for the new mine. Example 2: an oxygen-blown gasification plant planning to purchase oxygen from a third party who will construct a plant exclusively for this project should provide documentation for the oxygen supplier. Example 3: an industrial gasification plant planning to sell CO for enhanced oil recovery (EOR) should provide an agreement for such a 2 transaction indicating the annual CO 2 purchase quantity, expected project lifetime sales, CO2 capacity of the site for EOR, and EOR site ownership.
5. Utilization of Project Output
Provide evidence that a market exists for the products of the proposed project as evidenced by contracts or written statements of intent from potential customers. Such documentation should be signed by authorizing officials of both the buyer and seller, and may include: Sales Agreements, Letters of Intent, Memoranda of Understanding, and Option Agreements.
Describe any sales arrangements that exist or that may be contemplated and summaries of their key terms and conditions.
Include as an appendix any independent Market Study that has been done in connection with this project, or if no independent market study has been completed, provide a copy of the applicant-prepared market study.
2009–16 I.R.B. 813 April 20, 2009
6. Project Economics
Describe the project economics and provide satisfactory evidence of economic feasibility as demonstrated through the financial forecast and the underlying project assumptions. The project economic and financial assumptions should be clearly stated and explained.
Discuss the market potential for the proposed technology beyond the project proposed by the applicant.
Show calculation for the amount of tax credits applied for based on allowable cost.
7. Project Development and Financial Plan
Provide the total project budget and major plant costs ( e.g., development, operating, capital, construction, and financing costs). Provide the estimated annual budget for and source of project development costs from the time of the application until the beginning of construction, including legal, engineering, financial, environmental, overhead, and other development costs. Describe the overall approach to project development and financing sufficient to demonstrate project viability. Provide a complete explanation of the source and amount of project equity. Provide a complete explanation of the source and amount of project debt. Provide the audited financial statements for the applicant for the most recently ended three fiscal years, and the unaudited quarterly interim financial statements for the current fiscal year for (a) the applicant, (b) for any of the project parties providing funding, and (c) for any third party funding source. If the applicant or another party does not have audited financial statements, the applicant or the party should provide equivalent financial statements prepared by the applicant or the party, in accordance with Generally Accepted Accounting Principles, and certified as to accuracy and completeness by the Chief Financial Officer of the party providing the statements. Applicant should demonstrate that the award recipient is financially viable without the receipt of additional federal funding associated with the proposed project.
For internally financed projects, provide evidence that the applicant has sufficient assets to fund the project with its own resources. Identify any internal approvals required to commit such assets. Include in an appendix copies of any board resolution or other approval authorizing the applicant to commit funds and proceed with the project.
For projects financed through debt instruments either unsecured or secured by assets other than the project, provide evidence that the applicant has sufficient creditworthiness to obtain such financing along with a discussion of the status of such instruments. Identify any internal approvals required to commit the applicant to pursue such financing. Include in an appendix, copies of any board resolution or other approval authorizing the applicant to commit to such financing.
For projects financed through investor equity contributions, discuss the source and status of each contribution. Discuss each investor’s financial capability to meet its commitments. Include in an appendix, copies of any executed investment agreements.
If financing through a public offering or private placement of either debt or equity is planned for the project, provide the expected debt rating for the issue and an explanation of applicant’s justification for the rating. Describe the status of any discussions with prospective investment bankers or other financial advisors.
For projects employing nonrecourse debt financing, provide a complete discussion of the approach to, and status of, such financing. In an appendix: (1) provide an Excel based financial model of the project, with formulas, so that review of the model calculations and assumptions may be facilitated; (2) provide pro-forma project financial, economic, capital cost, and operating assumptions, including detail of all project capital costs, development costs, interest during construction, other operating expenses, and all other costs and expenses.
8. Project Contract Structure
Describe the current status of each of the agreements set forth below. Include as an appendix copies of the contracts or summaries of the key provisions of each of the following agreements:
• Raw Material Input Supply: describe the source and price of raw material inputs for…¶
any studies of price and amount of raw materials that have been prepared. Include a summary of any supply contracts and a signed copy of the contracts.
• Transportation: explain the arrangements for transporting project inputs and outputs,…¶
• Water Supply Agreement: confirm the amount, source, and cost of water supply.¶
April 20, 2009 814 2009–16 I.R.B.
• If CO2 is to be sold a third party for sequestration, provide a Sales Agreement and…¶
tons per year), expected project lifetime sales (metric tons), potential CO 2 capacity of the site for sequestration (metric tons), technology and site suitability for sequestration, and sequestration site ownership and operation.
9. Permits Including Environmental Authorizations
Provide a complete list of all federal, state, and local permits, including environmental authorizations or reviews, necessary to commence construction of the project.
Explain what actions have been taken to date to satisfy the required authorizations and reviews, and the status of each.
Provide a description of the applicant’s plan to obtain and complete all necessary permits, and environmental authorizations and reviews.
Existing permits and permit applications must be specific to the project proposed. If existing permits are not specific for the proposed project ( i.e. permits for oil-fired or natural gas based systems), specific plans, procedures and schedules for reapplying, modifying and/or renegotiating permits should be provided.
10. Project Schedule
Provide an overall project schedule which includes technical, business, financial, permitting and other factors to substantiate that the project will meet the 7 year placed-in-service requirement.
The project schedule should be comprehensive and provide sufficient detail to demonstrate how applicant will meet the placedin-service requirement. The schedule should demonstrate that the applicant understands the required tasks, and has allowed realistic times for accomplishing the technical and financial tasks. The schedule should include the milestone accomplishments needed to obtain the financing for the project.
11. Appendices
a. Copy of internal or external engineering reports. b. Copy of site plan, together with evidence that applicant owns or controls a site. Examples of evidence would include a
deed, or an executed contract to purchase or lease the site. c. Information supporting applicant’s conclusion that the site is fully acceptable as the project site with respect to
environment, raw material supply, water supply, and public policy reasons. d. Project Market Study. e. Financial Model of project. f. Financial statements for the applicant and other project funding sources for the most recently ended three fiscal years,
and the unaudited quarterly interim financial statements for the current fiscal year. g. Expressions of interest or commitment letters from funding sources. h. For each project contract, if no contract currently exists, provide a summary of the expected terms and conditions. i. List of all federal, state, and local permits, including environmental authorizations or reviews, necessary to commence
construction. j. Copies of any contract or written statements from customers of intent to purchase project products.
E. Evaluation Criteria
Gasification projects will be evaluated on whether they meet all the requirements of § 48B.
Technical: will be evaluated on whether the applicant has demonstrated the capability to accomplish the technical objectives.
Site: will be evaluated on the basis that the site requirement for ownership or control has been met, and that the site is suitable for the proposed project.
Economic: will be evaluated on whether the project has demonstrated economic feasibility, taking into consideration the submitted financial and project development and structural information and financial plan.
Schedule: will be evaluated on the applicant’s ability to meet the 7 year placed-in-service requirement.
F. Program Policy Factors To Be Used by DOE in the Evaluation of Applications
Section 48B identifies minimum requirements for consideration for the qualifying gasification project credit, including the project’s technical feasibility, cost, and applicant’s ability. In the event that there are more qualified (certifiable) applications than the available tax credits, the DOE will apply additional factors to rank eligible projects based on their ability to advance the deployment of industrial gasification technology beyond its current state.
2009–16 I.R.B. 815 April 20, 2009
If there are more certified applications than available credits, DOE will rank the certified projects based on evaluation of the following Program Policy Factors. In ranking certified projects, highest priority will be given to the Primary Ranking Factor. Secondary and Tertiary Ranking Factors will be taken into account to rank projects that are not clearly differentiated on the basis of the Primary Ranking Factor, with higher priority given to the Secondary Ranking Factor than to Tertiary Ranking Factors.
Primary Ranking Factor:
• Capture and sequestration of more than 75 percent CO2 emissions. Only projects that…¶
more of the plant’s CO Among the certified projects, highest rankings 2 emissions will be considered for DOE certification. will be given to projects with the greatest separation and sequestration percentages of total CO 2 emissions.
Secondary Ranking Factor:
• Research partnership with an eligible educational institution as defined in…¶
• Presentation of other environmental, economic, or performance benefits Higher plant…¶
G. Supplemental Technical and Financial Guidance for Project Information Memorandum
Technology and Technical Information
It is important that the applicant select a specific gasification system for the project. Without that decision, it is difficult to provide the necessary specific design information needed for DOE to evaluate the project feasibility with respect to performance, emissions, outputs of major streams as well as capital and operating costs.
Project Economics
Applicants should demonstrate the project’s economic feasibility and financial viability by providing a clear statement and explanation of the economic and financial assumptions made by the applicant, and a financial forecast for the project. The financial forecast should flow logically from the applicant’s assumptions and be consistent with them. Applicants should include assumptions regarding financial and economic issues that may not be included in the project costs but have a direct impact on the project. The examples given in the “Site Control and Ownership” section are relevant here and their impact on the project economics should be discussed here.
Project Development and Financial Plan
The information provided by the applicant in this section should demonstrate that the applicant’s financial plan for developing the project is feasible and that the applicant will have access to necessary financing. The applicant should explain the source and timing for obtaining all financing, including the project development costs. It is important that the applicant explain and provide evidence that it has the capacity to fund the pre-construction project development costs, together with a budget for and description of those costs. Note that financial information is required for the applicant and for any other funding source.
Project Contract Structure
This section requires that the applicant demonstrate an understanding of the commercial contracting process and show progress in establishing the framework of contracts and agreements that a project typically requires. Applicants should show that their intended contract structure is reasonable and that their assumptions relative to price, terms, and conditions are consistent with current market conditions. Evidence of final agreements, agreements in principle, or summaries of terms and conditions between the applicant and contract counterparties should be provided, if available.
April 20, 2009 816 2009–16 I.R.B.
Qualifying Advanced Coal Project Program
Notice 2009–24
Get a plain-English answer with a citation back to this text.
Ask AI about this code