SECTION 3. ALLOCATION OF
Internal Revenue Bulletin 2006-18 · 2026-10-03 edition · updated 2026-10-04 · United States
NATIONAL MEGAWATT CAPACITY LIMITATION
.01 Allocation Limited to Qualifying Facilities . The Service will allocate the national megawatt capacity limitation only to advanced nuclear facilities (within the meaning of § 45J(d)(2)) that satisfy the requirements of this section 3.01 (qualifying facilities). An advanced nuclear facility is a qualifying facility only if each of the following requirements is satisfied:
(1) An application for a construction/operating license for the facility is filed with the Nuclear Regulatory Commission on or before the later of (i) December 31, 2008, or (ii) the date on which the aggregate nameplate capacity of advanced nuclear facilities for which applications for a construction/operating license have been filed with the Nuclear Regulatory Commission first equals or exceeds 6,000 megawatts.
(2) Construction on the facility begins before January 1, 2014. For this purpose, construction begins when a person who has applied for or been granted a combined license for an advanced nuclear facility initiates the pouring of safety-related concrete for the reactor building.
(3) The U.S. Department of Energy (DOE) provides a certification that the facility qualifies as an advanced nuclear facility, that the requirements of section 3.01(1) and (2) are satisfied, and that it is feasible for the facility to placed in service prior to January 1, 2021 (“DOE certification”).
.02 Application Required . The Service will allocate the national megawatt capacity limitation only to qualifying facilities for which the applications are submitted in accordance with section 4 of this notice.
.03 Allocation Method . The national megawatt capacity limitation will be allocated as follows:
(1) If the total nameplate capacity of all qualifying facilities for which applications are submitted does not exceed the national megawatt capacity limitation, each of those facilities will be allocated an amount of national megawatt capacity limitation equal to its nameplate capacity.
May 1, 2006 856 2006–18 I.R.B.
The estimated annual burden per respondent varies from 10 to 60 hours, depending on individual circumstances, with an estimated average of 40 hours. The estimated number of respondents is 15.
The estimated annual frequency of responses is on occasion.
Books or records relating to a collection of information must be retained as long as their contents may become material in the administration of any internal revenue law. Generally, tax returns and tax return information are confidential, as required by 26 U.S.C. 6103.