Part I. Line 5. Enter placed-in-service date of carbon
Instruction 8933 — Instructions to Form 8933, Carbon Oxide Sequestration Credit · 2026-10-03 edition · updated 2026-10-04 · United States
capture equipment. The original placed-in-service date of a single process train of carbon capture equipment at an industrial facility that includes the existing acid gas removal unit and new components of carbon capture equipment is the date that the single process train is placed in a condition or state of readiness and availability for the capture, processing, and preparation of carbon oxide for transport for disposal, injection, or utilization. See Rev. Rul. 2021-13.
Get a plain-English answer with a citation back to this text.
Ask AI about this code