Skip to content

Subpart D—Project-Based Assistance Provided by a Federal Agency Other Than HUD

§ 35.320 Hazard reduction.

24 C.F.R. Part 35 — Lead-Based Paint Poisoning Prevention In Certain Residential Structures · 2026 edition · updated 2026-10-03 · United States

Each owner shall conduct interim controls consistent with the findings of the risk assessment report. Hazard reduction shall be conducted in accordance with subpart R of this part.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — 24 C.F.R. Part 35 — Lead-Based Paint Poisoning Prevention In Certain Residential Structures

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.