9.19.010: PURPOSE:

The geologic hazard (GH) overlay established by section 9.05.030, "Establishment Of Base Zoning And Overlay Districts", and chapter 9.15, "Overlay Districts", of this article 2, is created to provide greater public safety by establishing investigation requirements for areas that are subject to potential geologic problems, including active faulting, landsliding, debris flow/mudflow, rockfall, liquefaction, and adverse soil conditions. (Ord. 253, 12-16-2014)

9.19.020: LOCATION REQUIREMENTS:

The GH overlay shall be designated:

  • A. In areas that are adjacent to active earthquake fault traces as depicted on the Alquist-Priolo earthquake fault zone maps;

  • B. In areas that are adjacent to potentially active earthquake fault traces as designated by the county geologist;

  • C. In areas where landslides, debris flows/mudflows, rockfall or other slope instabilities occur;

  • D. In areas where liquefaction of the soil is associated with earthquake activity; and

  • E. In areas of adverse soil conditions, such as those underlain by hydrocollapsible, expansive, or corrosive soils. (Ord. 253, 12-16-2014)

9.19.030: PROFESSIONAL REPORTS:

Except as provided for areas of adverse soil conditions, a detailed geologic study prepared by a California registered professional geologist shall be submitted with all land use applications and development permits proposed within the GH overlay, that would lead to the construction of roads or structures or the subdivision of land.

  • A. Report Contents:
  1. Areas Of Faulting: In areas of the GH overlay where faulting is a concern, the geologic report shall confirm the presence or absence of active faults and, if applicable, shall establish appropriate construction setbacks from active faulting.

  2. Areas Of Slope Stability: In areas of the GH overlay where slope stability is a concern, the geologic report shall evaluate landslides and other slope instabilities that could affect the project and, if applicable, shall include recommendations for mitigation.

  3. Areas Of Liquefaction Susceptibility: In areas of the GH overlay where liquefaction is a concern, the geologic report shall evaluate the potential for liquefaction based upon anticipated ground shaking, historic groundwater levels and character of the alluvial materials. If the investigation determines that a potential for liquefaction exists, a geotechnical investigation may be required.

  4. Areas Of Adverse Soil Conditions: In areas of the GH overlay where adverse soil conditions are known to exist, a geotechnical investigation report shall be prepared by a California registered professional engineer. The investigation shall sample and conduct laboratory analysis of subsurface soils and, if applicable, shall include recommendations for mitigation.

  • B. Exemptions From Report Requirements: Exemptions to the requirement for a geologic study include:
  1. A single-family residential wood or steel frame dwelling not exceeding two (2) stories in height provided the proposed structure is not located within the boundaries of a mapped landslide or within that portion of the GH overlay designated as having adverse soil conditions;

  2. Single-family residential wood frame or steel dwellings located within a subdivision of land for which a geologic report was prepared and approved;

  3. A nonhabitable structure that is accessory to a residential use that is not physically connected to the principal structure; and

  4. Alterations or additions to any structure where the value or area does not exceed fifty percent (50%) of the structure. (Ord. 253, 12-16-2014)

9.19.040: DEVELOPMENT STANDARDS:

Development and land uses proposed within the GH overlay shall comply with the following standards:

A. A structure used for human occupancy shall be located fifty feet (50') or farther from any active earthquake fault traces. Lesser setbacks may be applicable in certain situations as determined by an appropriate geologic investigation and approved by the county geologist or other engineering geologist designated by the town.

B. A structure used for critical facilities shall be located one hundred fifty feet (150') or farther from any active earthquake fault trace as indicated by general plan. Critical facilities shall include dams, reservoirs, fuel storage facilities, power plants, nuclear reactors, police and fire stations, schools, hospitals, rest homes, nursing homes and emergency communication facilities.

C. Utility lines and streets shall not be placed within the construction setback area of a hazardous fault except for crossing which can be made perpendicular to the fault trace or as recommended by the project geologist and approved by the county geologist or individual designated by the building official.

D. The use of development restricted areas as recreation and common open spaces is encouraged. (Ord. 253, 12-162014)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Yucca Valley Zoning Code
Yucca Valley Zoning Code
  1. Chapter 9.01 — PURPOSE AND APPLICABILITY
  2. Chapter 9.02 — GENERAL PROVISIONS
  3. Chapter 9.03 — NONCONFORMING LOTS, STRUCTURES, AND USES
  4. Chapter 9.05 — ZONING DISTRICTS AND ZONING MAP
  5. Chapter 9.06 — LAND USE STANDARDS AND PERMIT REQUIREMENTS
  6. Chapter 9.07 — RESIDENTIAL AND HILLSIDE RESERVE DISTRICTS
  7. Chapter 9.09 — COMMERCIAL DISTRICTS
  8. Chapter 9.10 — INDUSTRIAL DISTRICTS
  9. Chapter 9.12 — PUBLIC/QUASI-PUBLIC AND OPEN SPACE DISTRICTS
  10. Chapter 9.13 — SPECIFIC PLAN DISTRICTS
  11. Chapter 9.14 — STANDARDS AND REGULATIONS FOR SPECIFIC USES IN …
  12. Chapter 9.15 — OVERLAY DISTRICTS
  13. Chapter 9.16 — AIRPORT SAFETY OVERLAY DISTRICT
  14. Chapter 9.17 — FIRE SAFETY OVERLAY DISTRICT
  15. Chapter 9.18 — FLOODPLAIN SAFETY OVERLAY DISTRICT
  16. Chapter 9.19 — GEOLOGIC AND SEISMIC HAZARDS OVERLAY DISTRICT
  17. Chapter 9.20 — HILLSIDE OVERLAY DISTRICT
  18. Chapter 9.21 — LARGE ANIMAL OVERLAY DISTRICT
  19. Chapter 9.22 — SPECIFIC PLAN OVERLAY DISTRICT
  20. Chapter 9.23 — SENIOR MOBILEHOME PARK OVERLAY DISTRICT
  21. Chapter 9.30 — DEDICATIONS AND INFRASTRUCTURE IMPROVEMENTS
  22. Chapter 9.31 — GENERAL DEVELOPMENT STANDARDS
  23. Chapter 9.32 — LANDSCAPING AND WATER CONSERVATION
  24. Chapter 9.33 — PARKING AND LOADING REGULATIONS
  25. Chapter 9.34 — PERFORMANCE STANDARDS
  26. Chapter 9.35 — PROPERTY MAINTENANCE STANDARDS
  27. Chapter 9.37 — SOIL EROSION AND DUST CONTROL
  28. Chapter 9.38 — TEMPORARY SPECIAL EVENTS
  29. Chapter 9.39 — TEMPORARY USES AND STRUCTURES
  30. Chapter 9.40 — SURFACE MINING AND LAND RECLAMATION
  31. Chapter 9.41 — TRIP REDUCTION REQUIREMENTS
  32. Chapter 9.42 — ACCESSORY SOLAR ENERGY SYSTEMS
  33. Chapter 9.43 — ACCESSORY WIND ENERGY SYSTEMS
  34. Chapter 9.44 — WIRELESS COMMUNICATIONS FACILITIES
  35. Chapter 9.45 — CEMETERIES
  36. Chapter 9.46 — RENEWABLE ENERGY GENERATION FACILITIES
  37. Chapter 9.47 — DENSITY BONUS
  38. Chapter 9.48 — EMERGENCY TRANSITIONAL HOUSING AND SINGLE ROOM …
  39. Chapter 9.51 — DEDICATION OF LAND FOR PARK AND RECREATION PURP…
  40. Chapter 9.55 — SIDEWALK VENDING
  41. Chapter 9.56 — REMOVAL OF WESTERN JOSHUA TREES
  42. Chapter 9.60 — PERMIT PROCEDURES; GENERAL PROVISIONS
  43. Chapter 9.61 — APPLICATION PROCESSING PROCEDURES
  44. Chapter 9.62 — AMENDMENTS TO DEVELOPMENT CODE AND ZONE CHANGES
  45. Chapter 9.63 — CONDITIONAL USE PERMIT
  46. Chapter 9.64 — DEVELOPMENT AGREEMENTS
  47. Chapter 9.65 — GENERAL PLAN AMENDMENTS
  48. Chapter 9.66 — LAND USE COMPLIANCE REVIEW
  49. Chapter 9.67 — PLANNED DEVELOPMENT PERMITS
  50. Chapter 9.68 — SITE PLAN AND DESIGN REVIEW
  51. Chapter 9.69 — SPECIAL USE PERMITS
  52. Chapter 9.70 — SPECIFIC PLANS
  53. Chapter 9.71 — TEMPORARY SPECIAL EVENT PERMIT
  54. Chapter 9.72 — TEMPORARY USE PERMITS
  55. Chapter 9.73 — VARIANCE REVIEW
  56. Chapter 9.74 — REASONABLE ACCOMMODATIONS
  57. Chapter 9.80 — ADMINISTRATION; GENERAL
  58. Chapter 9.81 — APPEALS
  59. Chapter 9.82 — ENFORCEMENT AND VIOLATIONS
  60. Chapter 9.83 — PERMIT AMENDMENTS
  61. Chapter 9.84 — PERMIT REVOCATIONS
  62. Chapter 9.85 — PUBLIC NOTICES AND HEARINGS
  63. Chapter 9.86 — TIME LIMITATIONS AND TIME EXTENSIONS
  64. Chapter 9.90 — GENERAL PROVISIONS
  65. Chapter 9.91 — TENTATIVE MAP FILING AND PROCEDURES
  66. Chapter 9.92 — PARCEL MAPS AND FINAL MAPS
  67. Chapter 9.93 — ADDITIONAL SUBDIVISION PROCEDURES
  68. Chapter 9.94 — DEDICATION AND EXACTIONS
  69. Chapter 9.95 — SUBDIVISION DESIGN AND IMPROVEMENT REQUIREMENTS
  70. Chapter 9.96 — IMPROVEMENT PLANS, INSTALLATION, AND SECURITY
  71. Chapter 9.97 — SOILS REPORT
  72. Chapter 9.99 — DEFINITIONS OF WORDS AND TERMS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.