13.20.100. - Community Development.

(a) In the event of the failure of the owner of a development project to pay in full a fee or fees payable under this Chapter, the County may place and record a lien upon subject property in the amount of the unpaid fees.

(b) Community Development and Services Agency General fees.

NAME OF FEE FEE FY 24/25
Standard Page Sizes (8½"×11"—14") Color $1.00/per sheet
Page Sizes (11"×17") B&W $0.50/per sheet
Page Sizes (11"×17") Color $2.00/per sheet
Page Sizes (18"×24") $5.00/per sheet
Page Sizes (24"×36") and larger $10.00/per sheet
Reproduction Not Done in Office Actual Cost
Audio Provided on CD $15.00
Electronic Data Request (existing data provided via email, add $10.00 to place on CD) $2.00 per attachment
County Counsel or Special Counsel Fees Actual Cost
Recording Processing Fee $90.00
(Does not include costs to create document nor Recorder's Fees)
CDSA Support and Technology Surcharge (excludes outside fees and impact fees) 8% on all fees collected by CDSA
Cash Deposit—Temporary Use $1,000.00
Cash Deposit—Deferred Improvements Deposit corresponds with value of improvements
Processing Refund of Cash Deposit Fee (whichever is greater) $180.00 or 10% of Deposit
Credit Card Processing Fee Actual Cost
Deferred Improvement Agreement (single family residential) $360.00
Deferred Improvement Agreement (all other uses) $720.00
Unverified Complaint Response Fee (charged upon 2 nd time of unverified complaint from same person) Hourly Rate by Division
Appeal of Determinations to Board of Supervisors (moved from Planning) $50.00 Clerk of the Board $720.00 to CDSA
For CDSA permits required to correct work performed or operations that occurred subsequent to notification by CDSA of the violation, the permit fees shall be twice the standard rate. Repeat violators or violations shall be 3 times the standard rate and no prior notification is required.
Annual Permits 2 Payment Option :
Must notify County in advance of due date and pay at least half of fee prior to due date and remainder within 6 months of due date, total fee will be increased by 10% with 2 Payment Option. Fee + 10%
Penalties for Late Payment :
25% if paid 5—30 days past due
Beyond 30 days, 50% plus enforcement costs
For returned checks, due date is date of original payment.
Request for Waiver of Penalties :
Written request must be presented to the CDSA Director for consideration within 30 days for penalty being assessed. Consideration will be given to amount of penalty and option to allow a structured repayment plan with interest on past due amount assessed at rate of 1.5% per month.
Permit applications withdrawn, by the applicant or by staff due to inactivity, will have 30 days for the Applicant to request in writing a refund of the unused portion of the permit fees/deposits, less a 10% processing fee, or they will be forfeited. No refunds will be issued once a project has been set for hearing. Refunds for building fees shall be per Section 13.20.200 .
All other service requests not specifically identified in the fee schedule shall be charged at the applicable Division's hourly rate.
All reproduction requests less than $1.00 in value may be waived due to processing cost exceeding value of service.
In the event of the failure of the owner of a development project to pay in full a fee or fees payable under Chapter 13.20 , County may place and record a lien upon subject property in the amount of the unpaid fees. (Ord. No. 1459a)
Enforcement actions resulting in collection and storage of Personal Property Unclaimed items may be sold at auction or disposed of after 90 days. $10.00/Day + Enforcement Costs

(Prior Code, § 13.20.100; Ord. No. 1059; Ord. No. 1062; Ord. No. 1062A; Ord. No. 1089; Ord. No. 1130; Ord. No. 1273; Ord. No. 1288; Ord. No. 1309; Ord. No. 1319; Ord. No. 1332; Ord. No. 1341; Ord. No. 1358; Ord. No. 1410; Ord. No. 1459a; Ord. No. 1505; Ord. No. 1516; Ord. No. 1524; Ord. No. 1529; Ord. No. 1565; Ord. No. 1608; Ord. No. 1616; Ord. No. 1625)

Exceptions & meaning →

13.20.110. - Lien for unpaid fees.

In the event of the failure of the owner of a development project to pay in full a fee of fees payable under Chapter 13.20, County may place and record a lien upon subject property in the amount of the unpaid fees.

(Ord. No. 1459a; Ord. No. 1471)

Exceptions & meaning →

13.20.200. - Community Development and Services Agency—Building Department.

NAME OF FEE UNIT FEE FY 24/25
Processing/Intake Fee (Applies to all permits unless noted) each $180.00
Master Plan Processing Fee (per unit) each $540.00
Fee Estimates (less than $1,000,000.00 valuation) each $180.00
Fee Estimates (greater than $1,000,000.00 valuation) each $540.00
Recorded Document Preparation each $180.00
Deferred Submittal each $180.00
Application Renewal each $180.00
Manufactured Home/Commercial Coach (Utility Hook Up included) each $1,260.00
Manufactured Home, Foundation each $450.00
Temporary Trailer (Elec Hook Up included) each $360.00
Cargo Container Placement $270.00
Temporary Structure (180 days) $180.00
Prefabricated/Prebuilt Accessory Structure up to 400 s.f. up to 400 s.f. $360.00
No Services/Utilities (Residential and Ag)
Awning, Patio Cover, Carport, Decks, etc. up to 400 s.f. $270.00
Each additional 100 sq. ft. ea add'l 100 s.f. $45.00
Residential Remodel—up to 500 sq. ft. up to 500 s.f. $450.00
Each additional 100 sq. ft. each 100 s.f. $90.00
Residential Rehabilitation/Repair Flat fee $270.00
Non-Residential Repair/Small TI - PC not included, up to 200 sq. ft. each $360.00
Non-Residential Repair/Small TI - PC not included, 201 to 500 sq. ft. each $720.00
Re-roof (roofing material only) Residential SFD each $180.00
Re-roof (roof material and sheathing) Residential SFD each $270.00
Roof Structure Replacement (includes Re-roof w/ sheathing) each $450.00
Re-Roof, Commercial, Industrial, Ag, Multifamily each $1,080.00
Window or Sliding Glass Door - Replacement/Retrofit each $180.00
Fireplace
Masonry each $495.00
Pre-Fabricated/Metal/Factory Made each $270.00
Mechanical Apparatus Replacement ¼ hr minimum, plus estimated time hourly $45.00
Residential HVAC (complete system incl. furnace, a/c unit and duct work) each $135.00
Non-Residential HVAC Repair, 1 hr. minimum hourly $180.00
Type I or Type II Commercial Kitchen Hood each $90.00
Plumbing Apparatus Replacement ¼ hr minimum hourly $45.00
Waste Grease Trap and/or Interceptor each $45.00
Installation, alteration, or repair of piping each $45.00
Electrical Apparatus Replacement ¼ hr minimum, plus estimated time hourly $45.00
Services/sub panels up to 200 amperes in rating each $45.00
Services/sub panels 200 to 1000 amperes in rating each $90.00
Services/sub panels over 1000 amperes in rating each $180.00
Motors, ¼ hr. minimum hourly $45.00
Water Heater Replacement (no processing fee) each $90.00
Reconnect Gas and/or Elec. Service (no processing fee) each $90.00
Photovoltaic/Solar, Roof Mount (Residential) each $270.00
Photovoltaic/Solar, Ground Mount (Residential) each $540.00
Photovoltaic/Solar, Roof Mount (Non-Residential) each $900.00
Photovoltaic/Solar, Ground Mount (Non Residential) each $1,440.00
Antenna/Cell Tower/Windmill—new each $720.00
Antenna/Cell Tower/Windmill—replacement/add. apparatus each $180.00
Signs (no electric) each $315.00
Signs (with electric) each $360.00
Each additional sign on same permit (all types) each $45.00
Spa or Hot Tub (Pre-fabricated - Above Ground) each $90.00
Swimming Pool
Vinyl-lined each $720.00
Fiberglass each $540.00
Gunite each $720.00
Public pool each $900.00
Tank—Above Ground each $495.00
Tank—Below Ground each $630.00
Fence (non masonry) greater than 7 feet in height up to 100 l.f. $270.00
Each additional 100 l.f. ea add'l 100 l.f. $45.00
Fence (masonry) / Retaining Wall (all types) up to 50 l.f. $450.00
Each additional 50 l.f. ea add'l 50 l.f. $45.00
Grading Review associated with a building permit, Building inspects each $135.00
(when less than 1 acre, no more than 2' fill/cut and 50 cubic yards)
Change of Ownership/Tenant each $270.00
Occupancy Permit each $360.00
Demolition/Removal each $270.00
Duplicate/Replacement Job Card (no processing fee) each $45.00
Fire Sprinkler Processing Fee each $180.00
Fire Sprinkler Inspection (residential) each $270.00
Fire Sprinkler Inspection (non-residential), 2 hr. min. hourly $360.00
Fire Sprinkler Plan Check (sent to outside consultant) Actual Cost
Fire Safe Mitigation Fees Fire Safe Mitigation Fees Fire Safe Mitigation Fees
Fire Safe Plan (High and Very High Fire Risk areas) Flat fee $180.00
Fire Safe Inspection (pre and post construction) Flat fee $180.00
Plan Check, 1 hr. minimum hourly $180.00
Plan Change, 1 hr. minimum hourly $180.00
Third Party Plan Check (outside plan check) each Actual Cost
Inspection, 1 hr. minimum hourly $180.00
Business License Inspection Fee (no processing fee) each $180.00
Inspection, outside business hours, 2 hr. minimum hourly $360.00
Alternate Methods and Materials Review each $360.00
Land Use Entitlement Review each $180.00
Urban Lot Split (SB-9) each $180.00
Building Standards Commission Fee (BSC)
Strong Motion Instrument Program (SMIP)
BSC and SMIP Fees are State imposed fees, and are collected as set forth by Resolution
Valuation is set using current ICC Valuation Table
Stop Work Notice each Double Fee (2x Permit)
Re-Inspection Residential each $270.00
Re-Inspection Non-Residential each $450.00
Permit Renewal (50% cost of permit; must be renewed within 90 days of expiration) each $180.00
Permit Reinstatement (Full cost of permit, < 5 yrs old) each 100% Permit
* Except as otherwise specified, all services in this Section which are charged at an hourly rate are 1 hour minimum and charged in quarter hour increments thereafter. $45.00/Qtr Hr
Building Department Hourly Rate hourly $180.00
NEW CONSTRUCTION PERMITS BY OCCUPANCY CLASSIFICATION FEE FY 24/25 PLAN CHECK FEE FY 24/25 INSPECTION FEE FY 24/25 TOTAL
A—Complete incl. MP&E * A—Complete incl. MP&E * A—Complete incl. MP&E * A—Complete incl. MP&E *
Base Rate (up to 1,000 sq. ft.) $2,700.00 $4,320.00 $7,020.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $18.00 $24.00 $42.00
10,000 sq. ft. $4,320.00 $6,480.00 $10,800.00
Per 100 sq. ft. over 10,000 $9.00 $12.00 $21.00
A - TI ** A - TI ** A - TI ** A - TI **
Base Rate (500 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (501 to 9,999 sq. ft.) $11.36 $22.74 $34.10
10,000 sq. ft. $1,800.00 $3,240.00 $5,040.00
Per 100 sq. ft. over 10,000 $3.78 $5.68 $9.47
B—Complete incl. MP&E * B—Complete incl. MP&E * B—Complete incl. MP&E * B—Complete incl. MP&E *
Base Rate (up to 1,000 sq. ft.) $2,700.00 $4,680.00 $7,380.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $18.00 $24.00 $42.00
10,000 sq. ft. $4,320.00 $6,840.00 $11,160.00
Per 100 sq. ft. over 10,000 $9.00 $12.00 $21.00
B—TI ** B—TI ** B—TI ** B—TI **
Base Rate (500 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (501 to 9,999 sq. ft.) $13.26 $26.52 $39.78
10,000 sq. ft. $1,980.00 $3,600.00 $5,580.00
Per 100 sq. ft. over 10,000 $4.42 $2.66 $7.08
E—Complete incl. MP&E * E—Complete incl. MP&E * E—Complete incl. MP&E * E—Complete incl. MP&E *
Base Rate (up to 1,000 sq. ft.) $3,240.00 $5,040.00 $8,280.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $16.00 $28.00 $44.01
10,000 sq. ft. $4,680.00 $7,560.00 $12,240.00
Per 100 sq. ft. over 10,000 $8.00 $14.00 $21.99
E—TI ** E—TI ** E—TI ** E—TI **
Base Rate (500 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (501 to 9,999 sq. ft.) $17.06 $28.42 $45.48
10,000 sq. ft. $2,340.00 $3,780.00 $6,120.00
Per 100 sq. ft. over 10,000 $5.68 $7.10 $12.78
F—Complete incl. MP&E * F—Complete incl. MP&E * F—Complete incl. MP&E * F—Complete incl. MP&E *
Base Rate (up to 1,000 sq. ft.) $3,240.00 $6,120.00 $9,360.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $16.00 $12.00 $28.00
10,000 sq. ft. $4,680.00 $7,200.00 $11,880.00
Per 100 sq. ft. over 10,000 $8.00 $6.00 $14.00
F—TI ** F—TI ** F—TI ** F—TI **
Base Rate (500 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (501 to 9,999 sq. ft.) $20.84 $32.22 $53.06
10,000 sq. ft. $2,700.00 $4,140.00 $6,840.00
Per 100 sq. ft. over 10,000 $5.21 $6.44 $11.65
H—Complete incl. MP&E * H—Complete incl. MP&E * H—Complete incl. MP&E * H—Complete incl. MP&E *
Base Rate (up to 1,000 sq. ft.) $4,140.00 $5,400.00 $9,540.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $18.00 $26.00 $44.00
10,000 sq. ft. $5,760.00 $7,740.00 $13,500.00
Per 100 sq. ft. over 10,000 $9.00 $13.00 $22.00
H—TI ** H—TI ** H—TI ** H—TI **
Base Rate (500 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (501 to 9,999 sq. ft.) $30.32 $36.00 $66.32
10,000 sq. ft. $3,600.00 $4,500.00 $8,100.00
Per 100 sq. ft. over 10,000 $6.06 $9.00 $15.06
M—Complete incl. MP&E * M—Complete incl. MP&E * M—Complete incl. MP&E * M—Complete incl. MP&E *
Base Rate (up to 1,000 sq. ft.) $4,320.00 $5,760.00 $10,080.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $28.00 $28.00 $56.01
10,000 sq. ft. $6,840.00 $8,280.00 $15,120.00
Per 100 sq. ft. over 10,000 $14.00 $14.00 $27.99
M—TI ** M—TI ** M—TI ** M—TI **
Base Rate (500 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (501 to 9,999 sq. ft.) $26.52 $34.10 $60.62
10,000 sq. ft. $3,240.00 $4,320.00 $7,560.00
Per 100 sq. ft. over 10,000 $4.42 $8.52 $12.94
R-1—Complete incl. MP&E * R-1—Complete incl. MP&E * R-1—Complete incl. MP&E * R-1—Complete incl. MP&E *
Base Rate (up to 1,000 sq. ft.) $4,140.00 $9,540.00 $13,680.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $30.00 $66.00 $96.00
10,000 sq. ft. $6,840.00 $15,480.00 $22,320.00
Per 100 sq. ft. over 10,000 $27.00 $27.00 $54.00
R-1—Production (Mstr Planned) R-1—Production (Mstr Planned) R-1—Production (Mstr Planned) R-1—Production (Mstr Planned)
Base Rate (up to 1,000 sq. ft.) $0.00 $9,540.00 $9,540.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $0.00 $66.00 $66.00
10,000 sq. ft. $0.00 $15,480.00 $15,480.00
Per 100 sq. ft. over 10,000 $0.00 $27.00 $27.00
R-1—TI R-1—TI R-1—TI R-1—TI
Base Rate (500 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (501 to 9,999 sq. ft.) $30.32 $34.10 $64.42
10,000 sq. ft. $3,600.00 $4,320.00 $7,920.00
Per 100 sq. ft. over 10,000 $27.00 $27.00 $54.00
R-2—Residential Care R-2—Residential Care R-2—Residential Care R-2—Residential Care
Base Rate (up to 1,000 sq. ft.) $2,700.00 $2,880.00 $5,580.00
Per 100 sq. ft. (1,001 to 1,999 sq. ft.) $54.00 $126.00 $180.00
2,000 sq. ft. $3,240.00 $4,140.00 $7,380.00
Per 100 sq. ft. over 2,000 $27.00 $27.00 $54.00
R-3—Custom/Model R-3—Custom/Model R-3—Custom/Model R-3—Custom/Model
Base Rate (up to 1,000 sq. ft.) $1,440.00 $2,880.00 $4,320.00
Per 100 sq. ft. (1,001 to 1,999 sq. ft.) $36.00 $36.00 $72.00
2,000 sq. ft. $1,800.00 $3,240.00 $5,040.00
Per 100 sq. ft. over 2,000 $27.00 $27.00 $54.00
R-3—Production (Mstr. Planned) R-3—Production (Mstr. Planned) R-3—Production (Mstr. Planned) R-3—Production (Mstr. Planned)
Base Rate (up to 1,000 sq. ft.) $0.00 $2,880.00 $2,880.00
Per 100 sq. ft. (1,001 to 1,999 sq. ft.) $0.00 $36.00 $36.00
2,000 sq. ft. $0.00 $3,240.00 $3,240.00
Per 100 sq. ft. over 2,000 $0.00 $27.00 $27.00
R-3—Factory Built (offsite) R-3—Factory Built (offsite) R-3—Factory Built (offsite) R-3—Factory Built (offsite)
Base Rate (up to 1,000 sq. ft.) $0.00 $1,800.00 $1,800.00
Per 100 sq. ft. (1,001 to 1,999 sq. ft.) $0.00 $36.00 $36.00
2,000 sq. ft. $0.00 $2,160.00 $2,160.00
Per 100 sq. ft. over 2,000 $0.00 $27.00 $27.00
R-2 & R-3—Additions to Existing R-2 & R-3—Additions to Existing R-2 & R-3—Additions to Existing R-2 & R-3—Additions to Existing
Base Rate (up to 200 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (201 to 1,999 sq. ft.) $60.00 $120.00 $180.00
2,000 sq. ft. $1,800.00 $3,240.00 $5,040.00
Per 100 sq. ft. over 2,000 $27.00 $27.00 $54.00
S—Complete incl. MP&E * S—Complete incl. MP&E * S—Complete incl. MP&E * S—Complete incl. MP&E *
Base Rate (up to 1,000 sq. ft.) $2,160.00 $2,880.00 $5,040.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $20.00 $28.00 $48.00
10,000 sq. ft. $3,960.00 $5,400.00 $9,360.00
Per 100 sq. ft. over 10,000 $5.00 $7.00 $12.00
S—TI ** S—TI ** S—TI ** S—TI **
Base Rate (500 sq. ft.) $720.00 $1,080.00 $1,800.00
Per 100 sq. ft. (501 to 9,999 sq. ft.) $16.00 $20.00 $36.00
10,000 sq. ft. $2,160.00 $2,880.00 $5,040.00
Per 100 sq. ft. over 10,000 $4.00 $5.00 $9.00
U—Complete incl. MP&E * (Includes Green Houses)
Base Rate (up to 400 sq. ft.) $540.00 $720.00 $1,260.00
Per 100 sq. ft. (401 to 1,999 sq. ft.) $11.25 $22.51 $33.76
2,000 sq. ft. $720.00 $1,080.00 $1,800.00
Per 100sq.ft. over 2,000 $5.63 $5.63 $11.27
Shell—non U or R structure only Shell—non U or R structure only Shell—non U or R structure only Shell—non U or R structure only
Base Rate (up to 1,000 sq. ft.) $1,800.00 $2,520.00 $4,320.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $20.00 $16.00 $36.00
10,000 sq. ft. $3,600.00 $3,960.00 $7,560.00
Per 100 sq. ft. over 10,000 $5.00 $4.00 $9.00
Concrete Tilt Up—non U or R structure only
Base Rate (up to 1,000 sq. ft.) $4,860.00 $5,580.00 $10,440.00
Per 100 sq. ft. (1,001 to 9,999 sq. ft.) $32.00 $38.00 $69.99
10,000 sq. ft. $7,740.00 $9,000.00 $16,740.00
Per 100 sq. ft. over 10,000 $16.00 $19.00 $35.01
* MP&E—Mechanical, Plumbing & Electrical
** TI—Tenant Improvement, multiple discipline

(Ord. No. 1059; Ord. No. 1062; Ord. No. 1062A; Ord. No. 1089; Ord. No. 1130; Ord. No. 1273; Ord. No. 1288; Ord. No. 1309; Ord. No. 1319; Ord. No. 1332; Ord. No. 1358; Ord. No. 1516; Ord. No. 1524; Ord. No. 1529; Ord. No. 1540; Ord. No. 1592; Ord. No. 1608; Ord. No. 1625)

Exceptions & meaning →

13.20.201. - Reserved.

Editor's note— Ord. No. 1529, § 2 (Exh. A), adopted April 15, 2014, repealed and reenacted Chapter 13.20, in effect repealing Section 13.20.201, which pertained to the consolidated schedule of acutal costs of services for P/C & Insp Combined (all construction types), and derived from Prior Code, § 13.20.200; Ord. No. 1059; Ord. No. 1062; Ord. No. 1062A; Ord. No. 1089; Ord. No. 1130; Ord. No. 1273; Ord. No. 1288; Ord. No. 1309; Ord. No. 1319; Ord. No. 1332; Ord. No. 1341; Ord. No. 1358; Ord. No. 1516; Ord. No. 1524.

Exceptions & meaning →

13.20.202. - Reserved.

Editor's note— Ord. No. 1529, § 2 (Exh. A), adopted April 15, 2014, repealed and reenacted Chapter 13.20, in effect repealing Section 13.20.202, which pertained to mechanical, plumbing, and electrical fees, and derived from Prior Code, § 13.20.200; Ord. No. 1059; Ord. No. 1062; Ord. No. 1062A; Ord. No. 1089; Ord. No. 1130; Ord. No. 1273; Ord. No. 1288; Ord. No. 1309; Ord. No. 1319; Ord. No. 1332; Ord. No. 1341; Ord. No. 1358; Ord. No. 1516; Ord. No. 1524.

Exceptions & meaning →

13.20.300. - Community Development and Services Agency—Planning.

NAME OF FEE UNIT FEE FY 24/25
Planning Department: General Fees
Division Hourly Rate Hourly $180.00
Record Search Hourly $180.00
Hearing Publication/Preparation for Hearing (per hearing) Flat Fee $500.00
Radius List/Neighbor Notification (no hearing) Flat Fee $75.00
Concurrent Processing of Planning Applications: Applications for 2 or more planning entitlements (for example: Tentative Map and Variance) will be charged 100% of the highest application fee plus 50% of each additional application fee when submitted at the same time for a single project site (excluding, Lot Line Adjustments, Certificates of Compliance and recording fees).
General Plan Amendment/Change of Zone/Plan Amendment
General Plan Amendment/Change of Zone/Plan Amendment 50 hours + hourly $9,000.00
Specific Plan/Area Plan/Community Plan/Master Plan 80 hours + hourly $14,400.00
Development Agreement 50 hours + hourly $9,000.00
Environmental Review Environmental Review Environmental Review
Notice of Exemption (Categorical or Statutory Exemption) 5 hours + hourly $900.00
Environmental Review: EIR or EIS (Full Cost) Per Contract Per Contract
EIR Mgmt Fee (30% Deposit of EIR Cost) Deposit + hourly $180.00
Mitigation Monitoring Plans: Mgmt 5 hours + hourly $900.00
With Planning Project/Entitlement
Environmental Review: Initial Study + Exemption 5 hours + hourly $900.00
Environmental Review: Initial Study/Negative Declaration 15 hours + hourly $2,700.00
Environmental Review: Initial Study/Mitigated Negative Declaration 25 hours + hourly $4,500.00
No Required Planning Entitlement
Environmental Review: Initial Study + Exemption 7 hours + hourly $1,260.00
Environmental Review: Initial Study/Negative Declaration 20 hours + hourly $3,600.00
Environmental Review: Initial Study/Mitigated Negative Declaration 35 hours + hourly $6,300.00
For concurrent applications, a single environmental review fee for the project shall be collected
Land Division/Parcel Related Land Division/Parcel Related Land Division/Parcel Related
Tentative Parcel Map 20 hours + hourly $3,600.00
Revise Approved TPM 10 hours + hourly $1,800.00
Tentative Subdivision Tract Map 50 hours + hourly $9,000.00
Revise Approved Tentative Map (includes adding phases) 10 hours + hourly $1,800.00
Substantial conformance map check fee 5 hours + hourly $900.00
Final Map & Improvement Plan Review—Parcel Map 5 hours + hourly $900.00
Final Map & Improvement Plan Review—Subdivision Tract Map 10 hours + hourly $1,800.00
Urban Lot Split (SB-9) 12 hours + hourly $2,160.00
Lot Line Adjustment 3 hours + hourly $540.00
Reversion to Acreage 5 hours + hourly $900.00
Certificate of Compliance 2 hours + hourly $360.00
Conditional Certificate of Compliance 8 hours + hourly $1,440.00
Zoning Related Zoning Related Zoning Related
Administrative Use Permit 10 hours + hourly $1,800.00
Additional fee if hearing is required (does not include legal notice) 5 hours + hourly $900.00
Request for Hearing Flat Fee $180.00
Conditional Use Permit: Major 30 hours + hourly $5,400.00
Conditional Use Permit: Minor Use Permit 20 hours + hourly $3,600.00
Conditional Use Permit: Amendment 10 hours + hourly $1,800.00
Design Review (Individual Lot/Building) 15 hours + hourly $2,700.00
Master Design Review (Shopping Centers & Complexes) 30 hours + hourly $5,400.00
Minor Design Review (modifications & compliance review) 10 hours + hourly $1,800.00
Excavation & Surface Mining Permits 50 hours + hourly $9,000.00
Reclamation Plan 10 hours + hourly $1,800.00
Planned Unit Development 30 hours + hourly $5,400.00
Pre-Application Meeting (Planning Department) hourly $180.00
Sign Permit Review 1 hour + hourly $180.00
Planned Sign Permit Program 15 hours + hourly $2,700.00
Temporary Use Permit (Type 1) 7 hours + hourly $1,260.00
Temporary Use Permit Extension (Type 1) 0.5 hours + hourly $90.00
Temporary Use Permit/Special Event (Type 2) Flat Fee $360.00
Variance: Minor/Parking/Signs 12 hours + hourly $2,160.00
Variance: Major 20 hours + hourly $3,600.00
Waiver Flat Fee $900.00
Miscellaneous Clearances/Permits Miscellaneous Clearances/Permits Miscellaneous Clearances/Permits
Burn Down Letter/ABC Clearance/Viable Agricultural Use/clearance forms Flat Fee $180.00
Land Use Confirmation 3 hours + hourly $540.00
ABC Review Fee when Hearing is Required 6 hours + hourly $1,080.00
Noise Permit 8 hours + hourly $1,440.00
Zoning Clearance Flat Fee $180.00
Zoning Clearance (Renewal) Flat Fee $90.00
Extension of Time (any planning entitlement) 10 hours + hourly $1,800.00
Recheck/Resubmittal (Misc. Permits/Clearances flat fee) per submittal Flat Fee $45.00
Building Permit Review Fees Building Permit Review Fees Building Permit Review Fees
Residential Structures Residential Structures Residential Structures
Single Family Residence 1.5 hour + hourly $270.00
Multi-Family Residential (includes 1 inspection) 8 hours + hourly $1,440.00
Residential: Minor additions and accessory structures 0.5 hours + hourly $90.00
Non-Residential Structures/Uses Non-Residential Structures/Uses Non-Residential Structures/Uses
Agricultural Accessory Structure (i.e. barn, non-commercial) 0.5 hours + hourly $90.00
New Construction (includes 1 inspection) 10 hours + hourly $1,800.00
Additions or Accessory Structures 5 hours + hourly $900.00
Tennant Improvement Review 1.5 hours + hourly $270.00
Occupancy Permit 0.5 hours + hourly $90.00
Site Review (Per Inspection) hourly $180.00
Approved Site/Plot Plan Changes/Recheck Fee 1 hour + hourly $180.00
Solar/Wind Systems Solar/Wind Systems Solar/Wind Systems
Residential & Multifamily (per unit), roof mounted systems Flat Fee $90.00
Residential & Multifamily (per unit), ground mounted systems Flat Fee $45.00
Non Residential, roof mounted systems or agricultural equipment Flat Fee $180.00
Non Residential, ground mounted systems Flat Fee $360.00
Recheck/Resubmittal Fee per submittal Flat Fee $45.00
Communication Facilities Communication Facilities Communication Facilities
New Communication Tower 7 hours + hourly $1,260.00
Addition to existing Communication Tower or Structure 5 hours + hourly $900.00
Compliance review with Use Permit Flat Fee $270.00
Landscape Review & Inspection Landscape Review & Inspection Landscape Review & Inspection
Landscape/Parking Plan Review and 1 Inspection (non-residential, and multi-family) 5 hours + hourly $900.00
Landscape Bond Agreement Preparation + Hourly Over 2 Hours 8 hours + hourly $1,440.00
SFR Landscape Inspection Flat Fee $90.00
* Except as otherwise specified, all services in this Section which are charged at an hourly rate are 1 hour minimum and charged in half hour increments thereafter.

(Prior Code, § 13.20.300; Ord. No. 1059; Ord. No. 1062; Ord. No. 1062A; Ord. No. 1089; Ord. No. 1130; Ord. No. 1273; Ord. No. 1288; Ord. No. 1309; Ord. No. 1319; Ord. No. 1332; Ord. No. 1341; Ord. No. 1358; Ord. No. 1366; Ord. No. 1380; Ord. No. 1439; Ord. No. 1459a; Ord. No. 1471; Ord. No. 1491; Ord. No. 1505; Ord. No. 1506; Ord. NO. 1516; Ord. No. 1524; Ord. No. 1529; Ord. No. 1540; Ord. No. 1608; Ord. No. 1616; Ord. No. 1625)

Exceptions & meaning →

13.20.400. - Community Development and Services Agency—Environmental Health Department.

NAME OF FEE FEE FY 24/25
Food Program (annual permit unless noted)
Restaurants—Bar Only (no food prep) $360.00
Restaurants—1—49 seats $540.00
Restaurants—50—149 seats $720.00
Restaurants—150 or more $1,080.00
Added to restaurant base—With Bar or Market $180.00
Added to restaurant base—With Bar and Market $270.00
Added to restaurant base—With Catering Services $180.00
Added to restaurant base—With Satellite Facility $180.00
Caterer $540.00
Caterer operating in a shared facility—out of county facility $360.00
Retail Markets—No food preps, only prepackaged goods $360.00
Retail Markets—Less than 2,000 square feet $540.00
Retail Markets—2,000—5,999 square feet $720.00
Retail Markets—6,000 or more square feet $1,440.00
Add each unit to retail market-butcher shop, deli, bakery, etc. $180.00/per unit
Bakery $540.00
Commissary Facility $540.00
Commissary—Verification per vehicle $45.00
Secondary Operation—Manufacturing Non-Potentially Hazardous Food $180.00
Secondary Operation—Manufacturing Potentially Hazardous Food $360.00
Vehicles—Vending Vehicle (no prep) $360.00
Vehicles—Mobile Food Prep Unit $540.00
Vehicles—Produce Truck (no prep) $180.00
Compact Mobile Food Operations—Raw Animal Products not Allowed $360.00
Compact Mobile Food Operations—Raw Animal Products Allowed $540.00
Vending Machines—Company $360.00
Vending Machines—Per Food Dispenser $18.00
Schools—Kitchen $720.00
Schools—Satellite Distribution Facility $360.00
Food Warehouse $630.00
Food Salvager $810.00
Food Demonstrator $90.00
Farmers Market $720.00
Bed and Breakfast $450.00
Temporary Food Facility $50.00
Annual Multi-event Temporary Food Facility—Low Risk $180.00
Annual Multi-event Temporary Food Facility—High Risk $360.00
Ice Plant $360.00
Special Events— + billed hourly rate $180.00/hour
Special Events— 3 or less vendors + $50 per vendor over 3 $360.00
Incidental Food Sales $180.00
Amphitheatre—Food—Bar—Catering $4,500.00
Plan Review Food Establishment—New $1,080.00
Plan Review Food Establishment—Remodel $900.00
Seasonal Snack Bar $360.00
Small Community Farmers Market (no food prep) $180.00
Certified Farmers Market/Temporary Food Facility $720.00
Change of Ownership $360.00
Public Recreation
Public Swimming Pool/Spa/Beach (annual permit) $630.00
Organized Camp (annual permit) $630.00
Plan Review Public Swimming Pools (construction) $1,440.00
Plan Review Organized Camp (construction) $990.00
Public Water System
Annual Surveillance Fee—15—24 service connections $630.00
Annual Surveillance Fee—25—99 service connections $810.00
Annual Surveillance Fee—100—199 service connections $990.00
Non-Community Water System—Non-Transient $810.00
Non-Community Water System—Transient $540.00
New Permit Fee—Community Water System $1,530.00
New Permit Fee—Non-Community Water System $1,170.00
Amended Permit Fee (all system types) $540.00
Ownership Change (all system types) $360.00
Annual Permit Fee Small System—5—14 service connects $540.00
CURFFL Systems $270.00
All other services $180.00/hour
Request for Variance/Exemption/Waiver $180.00/hour
Enforcement Action $180.00/hour
Plan Review Public and Local Small Water Systems $180.00/hour
Solid Waste
Solid Waste Hauler (per vehicle or trailer) $90.00
Full Solid Waste Facility—Class II Site $6,480.00
Full Solid Waste Facility—Class III Site $6,480.00
Standardized Solid Waste Facility $4,320.00
Registration Tier $4,320.00
Notification Tier #1 $360.00
Notification Tier #2 $1,440.00
Notification Tier #3 $2,160.00
Construction/Demo Debris $810.00
Recycling/Process Facility $4,320.00
Transfer Station $4,320.00
Abandoned/Closed Sites $1,440.00
Agricultural Waste Disposal Sites $360.00
SWF Permit Exemption $1,080.00
Ash Applications—Initial Permit Exemptions $900.00
Ash Applications—Annual Exemption Renewal $270.00
Facility Inspection not covered by permit fees $180.00/hour
Periodic Site Review $180.00/hour
Preliminary Closure/Post Closure $180.00/hour
Final Closure/Post Closure maintenance plan review $180.00/hour
Joint Technical Document Review $180.00/hour
5 year permit review $180.00/hour
Permit revision/modification $180.00/hour
Tipping Fee $4.40 per ton
Sewage Disposal
Sewage Tank Cleaning Vehicle $360.00
Chemical Toilet Supplier—50 Units or less $360.00
Chemical Toilet Supplier—51 Units or more $540.00
New or Replacement Conventional System $720.00
New Pressure Dosed or Engineered Systems $1,260.00
Minor Repair not involving leachfield $360.00
Major Repair of Failed System/Add to Existing Non-Failed System $720.00
Holding Tank (Vault System) 1st Year $900.00
Holding Tank (Vault System) (after 1st year) Annual Permit $360.00
Operating Permit Central Wastewater-Cluster 2—5 connects $1,980.00
Operating Permit Central Wastewater-Small 6—99 connects $2,700.00
Operating Permit Central Wastewater-Large > 99 connects $3,780.00
Annual Advanced Alternative System Operating Permit first 10 years $180.00
5 Year Advanced Alternative System Operating Permit after 10 years $180.00
Septic Tank Destruction $180.00
Medical Waste
General Acute Care Hospital— 1—99 beds $1,440.00
General Acute Care Hospital— 100—199 beds $1,980.00
General Acute Care Hospital— 200—250 beds $2,520.00
General Acute Care Hospital— 250 + beds $3,240.00
Specialty Clinic Providing Surgical, Dialysis, Rehab Services $810.00
Skilled Nursing Facility— 1—99 beds $630.00
Skilled Nursing Facility— 100—199 beds $810.00
Skilled Nursing Facility— 200 + beds $990.00
Acute Psychiatric Hospital $450.00
Intermediate Care Facility $720.00
Primary Care Clinic $810.00
Licensed Clinical Lab $360.00
Health Care Service Plan Facility $810.00
Veterinary Clinic or Hospital $450.00
Large Quantity Generator Medical Office $450.00
Small Quantity Generator Using On-Site Treatment $630.00
Small Quantity Generator Administrative Review $180.00/hour
Common Storage Facility— 1—10 generators $270.00
Common Storage Facility— 11—50 generators $630.00
Common Storage Facility— 50 + generators $1,170.00
On-Site, Large Quantity Treatment Facility $5,760.00/5 yrs
Small Quantity Generator $180.00/2 yrs
Wells and Soils Borings
Domestic Water Well—New $810.00
Agricultural Well—New $720.00
Monitoring and Cathodic Wells—New $630.00
Water Well, Monitor Well, Cathodic Well—Recondition/Deep (w/o new seal) $180.00
Water Well, Monitor Well, Cathodic Well—Destruction $450.00
Monitor Well, Additional $90.00/per well
Soil Boring or Excavation
Soil Boring or Excavation $450.00
Soil Boring—Each Additional $90.00/per boring
Private Water Sample Review $90.00
Other Permits
Ambulance (per vehicle) $180.00
Kennel/Pet Shops $360.00
Massage Parlor $360.00
Hotel/Motel $630.00
Plan Review Kennels & Pet Shops (construction) $540.00
Detention Facility $720.00
Hotel/Motel with Incidental Food $810.00
Tattooing, Permanent Cosmetics, Body Piercing
Ear piercing Facility/one-time registration $90.00
Body Art practitioner/artist $180.00
Body Art Facility (permanent) $360.00
Body Art Facility (Temporary) $180.00
Body Art Event Coordinator Small 3 or Less practitioners $180.00
Body Art Event Coordinator Large more than 3 practitioners $540.00
Mobile Body Art Facility $180.00
Body Art Facility Plan Review Fee (new) $450.00
Body Art Facility Plan Review Fee (Major remodel) $360.00
Body Art Facility Plan Review Fee (Minor remodel $180.00
Mobile Body Art Facility Plan Review Fee $180.00
Land Use (Land Use fees are initial + hourly over base)
Land Division Septic/Well—up to 4 lots ($180.00 per lot Soil Mantel) $540.00
Land Division Septic/Well—5 or more lots (+$180.00 per lot Soil Mantel) $900.00
Building Department Route Slip Clearance (primary structure) $90.00
Building Department Route Slip Clearance (accessory structure) $45.00
Lot Line Adjustment $180.00
Urban Lot Split (SB-9) $180.00
Conditional Use Permit $360.00
Other Land Division Sewage/Water (connecting to community system) $360.00
Tentative Subdivision Tract Map (connecting to community system) $360.00
Soil Mantle Observation $720.00
Temporary Use Permit & Miscellaneous Review/Services $180.00/hour
Plan Review/Site Review/Pre-application review fees $180.00/hour
Other Services & Fees
Field Sample Lab cost + $270.00
Bring-In Water Sample Lab cost + $45.00
Plan Review/Site Review $180.00/hour
Administrative, Permit Suspension, Revocation Hearings $540.00
Administrative time for enforcement activities $180.00/hour
All Reinspections $180.00/hour
Verified Complaint $180.00/hour
Variance/Exemption/Deviation - per hour (½ hr min) $180.00/hour
Consultations (per hour) $180.00/hour
Permit Transfers not Prohibited by State Law $180.00/hour
EIR Review/CEQA Document (per hour) $180.00/hour
All other document reviews, site reviews or any other service $180.00/hour
Release of Recorded Documents (Hourly plus document fee) $180.00/hour
Hazardous Materials
Farm Category I $360.00
Farm Category II $450.00
Farm Category III $540.00
Farm Category IV $720.00
Business Category I $360.00
Business Category II $450.00
Business Category III $540.00
Business Category IV $720.00
Business Category V $360.00
Business Category VI $135.65
CESQG—Not in BP $270.00
Hazardous Waste—Small Quantity Generator $270.00
Hazardous Waste—Large Quantity Generator $720.00
Tiered Permit—CA PBR $270.00
Tiered Permit—CESW, CESQT, CEL $270.00
Permit to Operate (issuance only) includes 1 tank $630.00
Permit to Operate (each additional tank) $90.00
Plan Check Install UST $2,160.00
Tank Removal—3 Tanks $1,350.00
Tank Removal each additional over 3 tanks $180.00
Minor Tank Repair $360.00
Modify Tank Repair—Small Project $990.00
Modify Tank Repair—Large Project $1,710.00
Tank Closure in Place $1,350.00
Temporary Tank Closure $540.00
RMP Cal ARP (initial review) $2,160.00
RMP Cal ARP (annual review) $450.00
Facility List $45.00
Building Inspector Route Slip Clear Project $180.00
Haz Mat Response per hour $180.00
Reinspection (per hour, over base fee) $180.00
Consultation per hour $180.00
Compliance/Follow Up (per hour) $180.00
Business Plan—Initial Application $540.00
UST (First Tank) $1,170.00
UST (Each Additional Tank) $135.00
Transfer UST Permit $630.00
Amend UST Permit $270.00
APSA Conditionally Exempt $90.00
APSA Qualified Facility $360.00
APSA Non-Qualified—Category I $540.00
APSA Non-Qualified—Category II $720.00
APSA Non-Qualified—Category III $1,440.00
* Except as otherwise specified, all services in this Section which are charged at an hourly rate are 1 hour minimum and in half hour increments thereafter.
Environmental Health Division: General Fees
Hourly Rate $180.00/hour

(Prior Code, § 13.20.400; Ord. No. 1059; Ord. No. 1062; Ord. No. 1062A; Ord. No. 1089; Ord. No. 1130; Ord. No. 1273; Ord. No. 1288; Ord. No. 1309; Ord. No. 1311; Ord. No. 1319; Ord. No. 1332; Ord. No. 1341; Ord. No. 1358; Ord. No. 1380; Ord. No. 1459a; Ord. No. 1471; Ord. No. 1486; Ord. No. 1491; Ord. No. 1505; Ord. No. 1516; Ord. No. 1524; Ord. No. 1529; Ord. No. 1540; Ord. No. 1554; Ord. No. 1592; Ord. No. 1608; Ord. No. 1625)

Exceptions & meaning →

13.20.500. - Community Development and Services Agency—Code Enforcement Department.

NAME OF FEE FEE FY 24/25
Department Hourly Rate $180.00
Notice & Order to Abate Public Nuisance $1,800.00
Cost Accounting Hearing Before Board of Supervisors $1,800.00
Vehicle Release Authorization $225.00
Abatement—County Performed (Actual Costs—Includes staff time, materials, outside vendors, any applicable penalties, and a 10% processing fee on entire amount) Actual Cost
Public Nuisance—Appeal Hearing (Administrative Law Judge) $4,116.00 Deposit
Public Nuisance—Appeal Hearing—Hearing Officer (If County prevails all costs exceeding deposit shall be paid. If appellate prevails, the full deposited amount will be refunded) $720.00 Deposit + $50.00 to COB
Public Nuisance—Appeal Hearing—Board of Supervisors (If County prevails all costs exceeding deposit shall be paid. If appellate prevails, the full deposited amount will be refunded) $720.00 Deposit + $50.00 Clerk of the Board
Relocation Assistance—Appeal Hearing (If County prevails all costs exceeding deposit shall be paid. If appellate prevails, the full deposited amount will be refunded) $1,800.00 Deposit
Vehicle Nuisance Abatement—Appeal Hearing (If County prevails all costs exceeding deposit shall be paid. If appellate prevails, the full deposited amount will be refunded) $1,800.00 Deposit
Vehicle Abatement Post Storage—Appeal Hearing (If County prevails all costs exceeding deposit shall be paid. If appellate prevails, the full deposited amount will be refunded) $1,800.00 Deposit
Administrative Citation—Appeal Hearing (Deposit) (If County prevails all costs exceeding deposit shall be paid. If appellate prevails, the full deposited amount will be refunded) Amount of Citation
Recorded Document Preparation (Does not incl. CDSA Recording Processing Fee nor Recorder's fees) $180.00
Land Use Entitlement Review $180.00
Except as otherwise specified, all services in this Section which are charged at an hourly rate are 1 hour minimum and charged in quarter hour increments thereafter.

(Prior Code, § 13.20.500; Ord. No. 1059; Ord. No. 1062; Ord. No. 1062A; Ord. No. 1089; Ord. No. 1130; Ord. No. 1273; Ord. No. 1288; Ord. No. 1309; Ord. No. 1319; Ord. No. 1332; Ord. No. 1341; Ord. No. 1358; Ord. No. 1459a; Ord. No. 1516; Ord. No. 1524; Ord. No. 1529; Ord. No. 1608; Ord. No. 1625)

Exceptions & meaning →

13.20.600. - Public Works/County Surveyor.

NAME OF FEE FEE FY 24/25
Project or Application Review
Temporary Use Permit $720.00
Variance $360.00
Environmental Impact Report Review $180.00/hour
General Plan Amendment/Zone Change $180.00/hour
Tentative Parcel Map $1,080.00
Tentative Subdivision Tract Map $1,800.00
Revised Approved Tentative Parcel Map $360.00
Revised Approved Tentative Subdivision Map $1,440.00
Tentative Parcel/Subdivision Tract Map Extensions $540.00
Tentative Map Expiration Worksheet $360.00
Substantial Compliance Map $1,440.00
Lot Line Adjustment $720.00
Lot Line Adjustment Additional Charge (when legality of parcel is in question) $360.00
Urban Lot Split (SB-9) $720.00
Certificate of Compliance $810.00
Conditional Certificate of Compliance $1,170.00/6.5 hours + hourly
Reversion to Acreage/Merger $540.00
Conditional Use Permit + Hourly over 4 hours $720.00
Specific Plan $180.00/hour
Waiver $540.00
Project Checking
Parcel Map (plus additional $180.00/sheet exceeding 2 sheets) $2,160.00
Tract Map/Condominium (plus additional $180.00/sheet exceeding 2 sheets) $4,680.00
Record of Survey (plus additional $180.00/sheet exceeding 2 sheets) $720.00
Corner Record Free
Lot Line Adjustment $1,440.00
Reversion to Acreage/Merger $1,260.00
LAFCO Appeal Description/Plat $540.00 + hourly
Records Search (Hourly Rate) $180.00/hour
Subdivision/Parcel Map Agreement $900.00
Improvement Plan Checking
X% of Preliminary Engineer's Estimate for Initial Fee (plus $180.00/hour if initial fee amount is exceeded) 1.5%, $1,800.00 min.
Inspection Fees
X% of Preliminary Engineer's Estimate for Initial Fee (plus $180.00/hour if initial fee amount is exceeded) 3%, $720.00 min.
Building Permits
Building Permit Application Review (Minor Permits, Miscellaneous) $90.00
Building Permit Application Review (New Construction/Additions) $180.00
Grading Permit
Plan Check, up to 1,000 CY $360.00
Plan Check, 1,001 to 10,000 CY $720.00
Plan Check, greater than 10,000 CY $1,440.00
Permit, up to 1,000 CY $360.00
Permit, 1,001 to 10,000 CY $540.00
Permit, 10,001 to 100,000 CY $1,080.00
Permit, greater than 100,000 CY (Each add'l 10,000 CY) $1,080.00 + $90.00/10K CY
Permit (when included with improvement plans) $180.00
Import/Export Material Fee $0.35/ton
SWPPP Fee—Grading Review or GP associated with a SFR building permit $90.00
SWPPP Fee—Grading Permits, up to 1,000 CY $360.00
SWPPP Fee—Grading Permits, greater than 1,000 CY $720.00
Encroachment Permits
Driveway/Roadway Encroachment Permit (includes up to 2 inspections) $270.00
Minor Upgrade to Existing Encroachment Permit (includes 1 inspection) $180.00
Commercial/Utility Encroachment Permit (single, incl. up to 3 inspections) $360.00
Encroachment Permit, Additional Inspections (each) $90.00
Annual Utility Encroachment Permit $2,520.00
Road Closure Fees
Daytime Closure $70.00/hour
24-Hour Closure $2,400.00/day
Abandonments
Application $1,800.00/ + Hrly
Advertisement Costs $500.00
Flood Plain Administration
Elevation Certificate $360.00
CLOMR/LOMR Individually or Combined $900.00
LOMR-F $180.00
Flood Plain Verification (Department of Real Estate) $180.00
FIRMette $180.00
Flood Plain Variance $720.00
Transportation Permits
Single Trip Permit $16.00
House Moving Permit $66.00
Annual Blanket Permit $90.00
Parade Permit $180.00
Parking Permit $11.00
Road Damage Fees
Road Damage Repair Costs Actual Cost
Signs
Street Name/Application-Approval/Change of Name $540.00
Street Name or Stop Sign (Installed by County) Actual Cost
Street Name, Stop, or Other Sign (Signs Only) Actual Cost
Miscellaneous Reviews/Reports/Correspondence
Reviews, Reports, Correspondence (Hourly Rate) $180.00/hour
Terminal Access Route
Application & Installation Actual Cost
Stormwater Regulatory Costs Per Resolution
* Except as otherwise specified, all services in this Section which are charged at an hourly rate are 1 hour minimum and charged in half hour increments thereafter.
Public Works/County Surveyor Hourly Rate $180.00/hour

(Prior Code, § 13.20.600; Ord. No. 1459a; Ord. No. 1491; Ord. No. 1516; Ord. No. 1524; Ord. No. 1529; Ord. No. 1540; Ord. No. 1608; Ord. No. 1616; Ord. No. 1625)

Exceptions & meaning →

13.20.700. - Parks.

NAME OF FEE FEE FY 22/23
Hammon Grove & Sycamore Ranch Day Use & Picnic Area
Package A—½ of Large BBQ and 4 Tables @ Ham. (up to 4 hours) $45.00
Package B—½ of Large BBQ and 4 Tables @ Ham. (full day) $80.00
Package C—Entire BBQ and Stage Area, 9 Tables @ Ham. (up to 4 hours) $90.00
Package D—Entire BBQ and Stage Area, 9 Tables @ Ham. (full day) $160.00
Package E—Small Pavillion, BBQ and Tables @ Syc. (full day) $120.00
Package F—Large Pavillion, BBQ and Tables @ Syc. (full day) $160.00
Electricity for Packages $40.00
Sycamore Ranch Campsites (per night)
Individual Site (standard size) $45.00
Individual Site (oversized) $60.00
Group Site A (72 person capacity—9 individual sites) $405.00
Group Site B (60 person capacity—7 individual sites) $315.00
Group Site C (60 person capacity—8 individual sites) $360.00
Group Site D (20 person capacity—3 individual sites) $135.00
Group Site E (72 person capacity—9 individual sites) $405.00
Special Events in Hammon Grove or Sycamore Ranch Actual Costs
Actual costs will be determined by the PW Director based on extent of use and potential lost revenues from campsites and/or picnic area.
Annual Vendor Permit $450.00 per year
Reservation Fee (non-refundable per transaction) $10.00
Credit Card Processing Fee Actual Costs
Campsite Cancellation Refund Policy
Cancellation more than one day in advance of stay Full Refund less Reservation Fee
Cancellation within one day of stay Loss of First Day's Camp Fees Plus Reservation Fee
Sycamore Ranch Event Hosting Sites
Large turf field including small pavilion (full day) $400.00
South island turf area including large pavilion (full day); limited special events only pre-approved by PW Director $1,000.00
Club House Building Rental (hourly rate) $100.00
Club House Building Rental (daily rate) $500.00
Club house rental requires $1,000.00 security deposit $1,000.00

(Ord. No. 1516; Ord. No. 1524; Ord. No. 1529; Ord. No. 1569; Ord. No. 1569; Ord. No. 1608; Ord. No. 1616)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Yuba County Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.