Title 16 — SUBDIVISIONS[[1]]Article II — PROCEDURES

§ 16.42

Williams Planning Code · 2026-07 edition · ingested 2026-07-08 · Williams

16.42.010 - Filing.

Prior to the time of filing of the notice of completion and acceptance of improvements within any subdivision, the subdivider must file with the city engineer the record drawings approved and signed by an engineer or surveyor in both printed and electronic format as directed by the city engineer. Record sewer drawings must show the location of all wye branches or house laterals.

(Ord. No. 249-22, § 2(Exh. A), 9-21-2022)

Chapter 16.44 - SURVEY REQUIREMENTS—MONUMENTS

Sections: