Skip to content

Title 26 — SUBDIVISION REGULATIONS1

Chapter 26.100 — SUBDIVISION MAPS

Ventura Municipal Code · 2026-09 edition · updated 2026-10-02 · Ventura

26.100.400 Engineering fees.

26.100.410 Lot line adjustments – Approval by director of community development.

26.100.110 General requirements.

26.100.120 Filing and reports.

26.100.130 Planning commission action.

26.100.140 Appeal procedure.

26.100.150 Council action.

26.100.160 Filing fees.

26.100.170 Vesting tentative maps.

26.100.210 Time limit for filing.

26.100.220 Requirements of filing.

26.100.230 Form for final map.

26.100.240 Soils report.

26.100.250 Reversion to acreage.

26.100.310 General requirements.

26.100.320 Exceptions.

26.100.330 Tentative parcel maps.

26.100.340 Time limit for filing a final parcel map.

26.100.350 Requirements for final filing.

26.100.360 Final parcel map form and content.

26.100.370 Surveys.

26.100.380 Approval by city engineer.

26.100.390 Responsibility for land division.

26.100.400 Engineering fees.

26.100.410 Lot line adjustments – Approval by director of community

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Ventura Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.