Chapter 14.05.040 — ANNUAL REVIEW OF INFRASTRUCTURE, FACILITIES, AND SERVICES (§ 14.05.040.010)
Chapter 14.11.050 PARCEL MAPS (§ 14.11.050.010 – § 14.11.050.050)
Vacaville Zoning Code · 2026-06 edition · updated 2026-09-25 · Vacaville
A parcel map is required for recording subdivisions that consist of four or fewer lots. (Ord. 1972, Repealed and Replaced, 02/22/2022)
The form and content of a final parcel map shall conform to this division, and as specified by the City Engineer.
A.
Parcel maps shall be based either upon an accurate and complete survey of the land to be subdivided or demonstrate compliance from recorded or filed data when sufficient survey information exists on filed maps to locate and retrace the exterior boundary lines of the parcel map if the location of one of these boundary lines can be established from an existing monument line.
B.
The parcel map shall be prepared, and the survey made, by or under the direction of a registered civil engineer or licensed land surveyor.
C.
All monuments, property lines, street centerlines, alleys and easements adjoining or within the subdivision shall be tied to the survey. The map shall show the location and description of all monuments employed in making the survey of the subdivision.
D.
The allowable error of closure on any portion of the final map shall not exceed 1/10,000 for field closures and 1/20,000 for calculated closures.
(Ord. 1972, Repealed and Replaced, 02/22/2022)
The subdivider shall submit prints of the parcel map to the City Engineer for review.
A.
The plans shall be accompanied by the information, data, reports and documents as required for final maps by Section 14.11.030.030, unless waived by the City Engineer if it can be demonstrated that any of the required information is not necessary.
B.
The City Engineer shall review the parcel map and the subdivider's engineer or land surveyor shall make corrections until the map is acceptable to the City Engineer.
C.
The subdivider's engineer or land surveyor shall submit the original tracing of the map, corrected to its final form, and signed by all parties required to execute the statements on the map, to the City Engineer.
(Ord. 1972, Repealed and Replaced, 02/22/2022)
The Director of Community Development shall approve the parcel map if it complies with the requirements of this division, and the approved tentative parcel map, and conditions of approval.
(Ord. 1972, Repealed and Replaced, 02/22/2022)
Upon approval of the parcel map, the City Engineer shall then release the parcel map to the subdivider's title company for recordation by the County Recorder.
(Ord. 1972, Repealed and Replaced, 02/22/2022)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Vacaville Zoning Code
- Chapter 14.01.020 — APPLICABILITY (§ 14.01.020.010)
- Chapter 14.02.060 — USE CLASSIFICATIONS (§ 14.02.060.010 – §
- Chapter 14.05.020 — PROCESS OF NEW RESIDENTIAL DEVELOPMENT PRO…
▸Chapter 14.05.040 — ANNUAL REVIEW OF INFRASTRUCTURE, FACILITIE…
Overview- Chapter 14.11.010 GENERAL PROVISIONS (§ 14.11.010.010 – § 14.1…
- Chapter 14.11.020 TENTATIVE SUBDIVISION MAPS (§ 14.11.020.010 …
- Chapter 14.11.030 FINAL MAPS (§ 14.11.030.010 – § 14.11.030.070)
- Chapter 14.11.040 TENTATIVE PARCEL MAPS (§ 14.11.040.010 – § 1…
- Chapter 14.11.050 PARCEL MAPS (§ 14.11.050.010 – § 14.11.050.0…
- Chapter 14.11.060 WAIVER OF PARCEL MAP (§ 14.11.060.010 – § 14…
- Chapter 14.11.070 VESTING MAPS, APPLICATION AND REVIEW PROCEDU…
- Chapter 14.11.080 COMMON INTEREST DEVELOPMENT, CONDOMINIUM CON…
- Chapter 14.11.090 AMENDMENT TO RECORDED MAPS (§ 14.11.090.010 …
- Chapter 14.11.100 LOT LINE ADJUSTMENTS (§ 14.11.100.010 – § 14…
- Chapter 14.11.110 REVERSION TO ACREAGE (§ 14.11.110.010 – § 14…
- Chapter 14.11.120 — PARCEL MERGERS (§ 14.11.120.010 – §
- Chapter 14.13.180 — GENERAL PROVISIONS
- Chapter 14.14.186 — GENERAL PROVISIONS
- Chapter 14.14.188 — SCHOOL FACILITIES IMPACT MITIGATION PLAN
- Chapter 14.14.186 — GENERAL PROVISIONS
- Chapter 14.14.188 — SCHOOL FACILITIES IMPACT MITIGATION PLAN
- Chapter 14.18.020 — DEFINITIONS (§ 14.18.020.010)
- Chapter 14.19.240 — ADMINISTRATION (§ 14.19.240.010 – §
- Chapter 14.19.244 — STANDARDS (§ 14.19.244.010)
- Chapter 14.25.010 — GENERAL PROVISIONS
- Chapter 14.27.020 — DEFINITIONS (§ 14.27.020.010)
- Chapter 14.27.030 — PROVISIONS FOR NEW CONSTRUCTION OR
- Chapter 14.27.050 — EFFECTIVE PRECIPITATION (§ 14.27.050.010)
- Chapter 14.27.060 — REPORTING (§ 14.27.060.010)
- Chapter 14.27.070 — PRESCRIPTIVE COMPLIANCE OPTION (§ 14.27.07…