Skip to content

Article III — Connection to Public Sewer

Upland Municipal Code · 2026-07 edition · updated 2026-09-27 · Upland

§ 13.24.130. Permit required.

§ 13.24.140. Application filed with city engineer.

§ 13.24.150. Determination by city engineer.

§ 13.24.160. Permit fees—Exceptions.

§ 13.24.170. Connection charge computed by city engineer.

§ 13.24.180. Issuance of permit.

§ 13.24.190. Exception—Special assessment district.

§ 13.24.200. Connection charges—Collection.

§ 13.24.210. Connection charges—Deposit.

§ 13.24.220. Permit valid for six months.

§ 13.24.230. Violations—Penalties.

§ 13.24.240. Gutters—Obstructing prohibited.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Upland Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.