Skip to content

Earlier editions: 2026-09

Title 17 — SUBDIVISIONS

Sutter Creek Municipal Code Ch. 17.28 Boundary Line Adjustments

Sutter Creek Municipal Code · 2026-10 edition · updated 2026-10-04 · Sutter Creek

Cite as: Sutter Creek Municipal Code Chapter 17.28 · Text as of 2026-10-04

17.28.010 - Record of survey and parcel maps not required.

(§66412) No record of survey or parcel map shall be required for a boundary line adjustment, meaning the relocation of the boundary line of adjoining property, when such relocation by deed does not result in the creation of an additional, separate and distinct parcel of real property. Such boundary line adjustment is not a subdivision of real property and is excluded from the provisions of this title; provided the boundary line adjustment is approved by the city engineer and no easements of record are affected by the adjustment.

A boundary line adjustment in accordance with this section shall be reflected in a deed which shall be recorded within six months of boundary line adjustment approval by the city. The deed shall make specific reference to the date of approval by the city.

(Ord. 321A, 2007)

Exceptions & meaning →

17.28.020 - Record of survey or parcel map required.

Whenever a proposed boundary line adjustment requires the relocation of existing utilities, easements, or other public improvements, a record of survey or parcel map shall be recorded. No tentative map will be required for any parcel map required by this section.

(Ord. 321A, 2007)

Exceptions & meaning →

17.28.030 - Procedure.

Applicants for a boundary line adjustment shall submit a completed application to the city. Applicants shall also submit at the time of application:

A. An application fee as established by resolution of the city council;

B. If an existing easement is involved, the applicant(s) must present, with the application, proof of approval of all public utilities affected;

C. A preliminary title report covering all parcels affected;

D. An eight and one-half inch by eleven inch drawing of the proposed boundary line adjustment that adequately shows the following:

  1. Existing boundaries of all parcels affected.

  2. Proposed boundary.

  3. Location of all structures with dimensions to property lines, easements, roads, fences, wells, on-site septic systems, sewage disposal facilities, storm drainage systems, and other significant features.

  4. All easements to remain, be relocated, or abandoned;

  5. Drawing shall be to scale and show approximate distances of all lines.

  6. Estimated area to the nearest tenth of an acre shall be noted on drawing.

E. The planning department will transmit copies of the application to the building official, and the city engineer, and on receipt of written recommendation of approval or conditional approval of the proposed boundary line adjustment, the planning department will issue an approval letter and record the boundary line adjustment with the county clerk recorder.

(Ord. 321A, 2007)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Sutter Creek Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.