Skip to content

Earlier editions: 2026-09

Title 20 — WATER EFFICIENT LANDSCAPING›Chapter 20.04 — Water Efficient Landscaping

Suisun City Municipal Code Appendix C Sample certificate of completion

Suisun City Municipal Code · 2026-10 edition · updated 2026-10-04 · Suisun City

Cite as: Suisun City Municipal Code Appendix C · Text as of 2026-10-04

CERTIFICATE OF COMPLETION This certificate is filled out by the project applicant upon completion of the landscape project.

PART 1. PROJECT INFORMATION SHEET

Date
Project Name
Name of Project Applicant Telephone No. Telephone No.
Name of Project Applicant Fax No. Fax No.
Title Email Address Email Address
Company Street Address Street Address
City State Zip Code

Project Address and Location:

Street Address Street Address Parcel, tract or lot number, if available.
City City Latitude/Longitude (optional)
State Zip Code Latitude/Longitude (optional)

Property Owner or his/her designee:

Name Telephone No. Telephone No.
Name Fax No. Fax No.
Title Email Address Email Address
Company Street Address Street Address
City State Zip Code

Property Owner "I/we certify that I/we have received copies of all the documents within the Landscape Documentation Package and the Certificate of Completion and that it is our responsibility to see that the project is maintained in accordance with the Landscape and Irrigation Maintenance Schedule."

_____ Property Owner Signature Date

Please answer the questions below:

  1. Date the Landscape Documentation Package was submitted to the City of Suisun City _____

  2. Date the Landscape Documentation Package was approved by the City of Suisun City _____

  3. Date that a copy of the Water Efficient Landscape Worksheet (including the Water Budget Calculation) was submitted to the local water purveyor _____

PART 2. CERTIFICATION OF INSTALLATION ACCORDING TO THE LANDSCAPE DOCUMENTATION PACKAGE "I/we certify that based upon periodic site observations, the work has been substantially completed in accordance with the ordinance and that the landscape planting and irrigation installation conform with the criteria and specifications of the approved Landscape Documentation Package."

Signature* Date Date
Name (print) Telephone No. Telephone No.
Name (print) Fax No. Fax No.
Title Email Address Email Address
License No. or Certification No. License No. or Certification No. License No. or Certification No.
Company Street Address Street Address
City State Zip Code

*Signer of the landscape design plan, signer of the irrigation plan, or a licensed landscape contractor.

PART 3. IRRIGATION SCHEDULING Attach parameters for setting the irrigation schedule on controller per ordinance Section 20.09.

PART 4. SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE Attach schedule of Landscape and Irrigation Maintenance per ordinance Section 20.10.

PART 5. LANDSCAPE IRRIGATION AUDIT REPORT Attach Landscape Irrigation Audit Report per ordinance Section 20.11.

PART 6. SOIL MANAGEMENT REPORT Attach soil analysis report, if not previously submitted with the Landscape Documentation Package per ordinance Section 20.05.150. Attach documentation verifying implementation of recommendations from soil analysis report per ordinance Section 20.05.150.

(Ord. No. 713, § 1, 1-5-2010)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Suisun City Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.