Earlier editions: 2026-09
Title 10 — PLANNING AND ZONING›Chapter 10 — FLOODPLAIN MANAGEMENT REGULATIONS
Siskiyou County Municipal Code Art. 1 General Provisions
Siskiyou County Municipal Code · 2026-10 edition · updated 2026-10-04 · Siskiyou County
Cite as: Siskiyou County Municipal Code Article 1 · Text as of 2026-10-04
Sec. 10-10.101. - Title and scope.¶
These regulations, in combination with the flood provisions of California Code of Regulations Title 24, the California Building Standards Code (hereinafter "building codes," consisting of Part 2 (building), Part 2.5 (residential), Part 10 (existing building), and related codes, shall be known as the Floodplain Management Regulations of the County of Siskiyou (hereinafter "these regulations"). These regulations shall apply in all unincorporated areas of the county and shall apply to all applications for development, including building permit applications and subdivision proposals, submitted on or after the effective date of these regulations.
(Ord. No. 25-07, § I, 10-21-2025)
Sec. 10-10.102. - Statutory authority.¶
The Legislature of the State of California has, in Government Code Sections 65302, 65560, and 65800, conferred upon local governments the authority to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, as set forth herein and as otherwise allowed by law, the Board does ordain as set forth in this chapter.
(Ord. No. 25-07, § I, 10-21-2025)
Sec. 10-10.103. - Purposes and objectives.¶
The purposes and objectives of these regulations and the flood load and flood resistant construction requirements of the building codes are to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific flood hazard areas through the establishment of comprehensive regulations for management of flood hazard areas, designed to:
(1) Prevent unnecessary disruption of commerce, access and public service during times of flooding.
(2) Require the use of appropriate construction practices in order to prevent or minimize future flood damage.
(3) Manage the alteration of natural floodplains, stream channels and shorelines to minimize the impact of development on the natural and beneficial functions of the floodplain.
(4) Manage filling, grading, dredging, mining, paving, excavation, drilling operations, storage of equipment or materials, and other development which may increase flood damage or erosion potential.
(5) Prevent or regulate the construction of flood barriers which will divert floodwater or increase flood hazards.
(6) Contribute to improved construction techniques in the floodplain.
(7) Minimize damage to public and private facilities and utilities.
(8) Help maintain a stable tax base by providing for the sound use and development of flood hazard areas.
(9) Minimize the need for rescue and relief efforts associated with flooding.
(10) Ensure that property owners, occupants, and potential owners are aware of property located in flood hazard areas.
(11) Minimize the need for future expenditure of public funds for flood control projects and response to and recovery from flood events.
(12) Meet the requirements of the National Flood Insurance Program for County participation as set forth in Title 44 Code of Federal Regulations, Section 59.22.
(Ord. No. 25-07, § I, 10-21-2025)
Sec. 10-10.104. - Coordination with California Building Standards Code.¶
Pursuant to the requirement established by state law that the County of Siskiyou administer and enforce the California Building Standards Code, the Board of Supervisors of the County of Siskiyou hereby acknowledges that the building codes contain certain provisions that apply to the design and construction of buildings and structures in flood hazard areas. Therefore, these regulations are intended to be administered and enforced in conjunction with the building codes.
(Ord. No. 25-07, § I, 10-21-2025)
Sec. 10-10.105. - Warning.¶
The degree of flood protection required by these regulations and the building codes is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur. Flood heights may be increased by manmade or natural causes. Enforcement of these regulations and the building codes does not imply that land outside the special flood hazard areas, or that uses permitted within such flood hazard areas, will be free from flooding or flood damage. The flood hazard areas and base flood elevations contained in the Flood Insurance Study and shown on Flood Insurance Rate Maps and the requirements of Title 44 Code of Federal Regulations, Sections 59 and 60 may be revised by the Federal Emergency Management Agency, requiring the County to revise these regulations to remain eligible for participation in the National Flood Insurance Program. No guarantee of vested use, existing use, or future use is implied or expressed by compliance with these regulations.
(Ord. No. 25-07, § I, 10-21-2025)
Sec. 10-10.106. - Disclaimer of liability.¶
These regulations shall not create liability on the part of the County of Siskiyou, any officer or employee thereof, the State of California, or the Federal Emergency Management Agency, for any flood damage that results from reliance on these regulations or any administrative decision lawfully made hereunder. The Floodplain Administrator and any employee charged with the enforcement of these regulations, while acting for the County in good faith and without malice in the discharge of the duties required by these regulations or other pertinent law or ordinance, shall not thereby be rendered personally liable and is hereby relieved from personal liability for any damage accruing to persons or property as a result of any act or by reason of an act or omission in the discharge of official duties. Any suit instituted against an officer or employee because of an act performed by that officer or employee in the lawful discharge of duties and under the provisions of these regulations shall be defended by the County until the final termination of the proceedings. The Floodplain Administrator and any subordinate shall not be liable for cost in any action, suit or proceeding that is instituted in pursuance of the provisions of these regulations.
(Ord. No. 25-07, § I, 10-21-2025)
Sec. 10-10.107. - Other laws.¶
The provisions of these regulations shall not be deemed to nullify any provisions of local, State or federal law.
(Ord. No. 25-07, § I, 10-21-2025)
Sec. 10-10.108. - Abrogation and greater restrictions.¶
These regulations supersede any other floodplain ordinance in effect in flood hazard areas. However, these regulations are not intended to repeal, abrogate or impair any existing ordinances including land development regulations, subdivision regulations, zoning ordinances, stormwater management regulations, or building codes, nor any existing easements, covenants, or deed restrictions. In the event of an overlap or conflict between these regulations and any other ordinance, code, regulation, easement, covenant, or deed restriction, the more restrictive shall govern.
(Ord. No. 25-07, § I, 10-21-2025)
Explained in plain English
Siskiyou County guides that cite this page.
Get a plain-English answer with a citation back to this text.
Ask AI about this code