Skip to content

Article II — DESIGN AND CONSTRUCTION

Sierra Madre Municipal Code · 2026-09 edition · updated 2026-09-27 · Sierra Madre

13.12.070 - Permit required.

13.12.080 - Application—Form and contents.

13.12.090 - Plan approval prerequisite to issuance.

13.12.100 - Sewer plans.

13.12.110 - Main-line sewer.

13.12.120 - Minimum velocity.

13.12.130 - Bench marks and elevations.

13.12.140 - Soil conditions.

13.12.150 - Grades.

13.12.160 - Main-line sewers—Alignment and location in street.

13.12.170 - Main-line sewers—Depth.

13.12.180 - Manhole structures.

13.12.190 - Substructures.

13.12.200 - Pipe materials—Approval required.

13.12.210 - Vitrified clay pipe—Installation specifications.

13.12.220 - Requirements for existing house connection sewers.

13.12.230 - Maintenance of house connection sewer.

13.12.240 - New house connection sewer.

13.12.250 - House connection sewers—Specifications generally.

13.12.260 - House connection sewer—Depth.

13.12.270 - Materials and construction—Conformity with standard specifications.

13.12.280 - Inspection; notice.

13.12.290 - Maintenance inspection.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Sierra Madre Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.