Skip to content

Title 8 — HEALTH AND SAFETY

Chapter 8.58 — SMART METERS (TEMPORARY MORATORIUM ON THE INSTALLATION OF

Sebastopol Municipal Code · 2026-09 edition · updated 2026-10-02 · Sebastopol

8.58.010 Title.

8.58.020 Purpose and findings.

8.58.030 Moratorium on the installation of smart meters and related

8.58.040 Immediate threat to health, safety and welfare.

8.58.050 Conflicting laws.

8.58.060 Effectiveness.

8.58.080 Publication.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Sebastopol Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.