Skip to content

Title 13 — PUBLIC SERVICES

Chapter 13.12 — CROSS-CONNECTION CONTROL PROGRAM

Sebastopol Municipal Code · 2026-09 edition · updated 2026-10-02 · Sebastopol

13.12.010 Purpose.

13.12.020 Definitions.

13.12.030 Cross-connection and protection requirements.

13.12.040 Discontinuance of service.

13.12.050 Right of entry.

13.12.060 Requirements for certification as a back-flow prevention device

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Sebastopol Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.