C7-66. - Erosion control system.¶
A. The faces of cut and fill slopes and project site shall be prepared and maintained to control against erosion in accordance with this division and the Grading Manual. Where cut slopes are not subject to erosion due to the erosion-resistant character of the materials, such protection may be omitted upon approval by the director. B. Where necessary, temporary and/or other devices such as desilting basins, check dams, riprap or other devices or methods, as approved by the director, shall be employed to control erosion and provide safety during the rainy season from October 15th to April 15th. The plan must be approved or waived by the director and all measures necessary to implement the plan in place before October 15th if grading is to be allowed between October 15th and April 15th. C. No grading work will be allowed between October 15th and April 15th on any single grading site under permit unless an erosion control system has been approved or waived by the director per Section C7-67. (Ord. No. 409, § 2, 12-9-2008)
C7-67. - Erosion control and storm water pollution prevention plans.¶
A. Erosion control plans prepared in accordance with this section and the Grading Manual shall be submitted to the director for approval by September 1st each year for projects under a grading permit. The erosion control plan may be waived for grading projects on single residential lot projects providing that an erosion control system, meeting the approval of the director has been installed, placed, planted or constructed before October 15th. B. Stormwater pollution prevention plans in accordance with this section and the Grading Manual shall be submitted to the director for approval at the time of application submittal by September 1st each year for projects under a grading permit. The plans shall detail how the proposed work
City of San Ramon, CA | Municipal Code 566
will comply with the criteria in the most recent version of the Contra Costa Clean Water Program Stormwater C.3. Guidebook. (Ord. No. 409, § 2, 12-9-2008)
C7-68. - Erosion control maintenance.¶
A. The contractor and permittee or project owner shall be responsible for continual maintenance of all erosion control devices during the rainy season as specified in the Grading Manual. The director may require that erosion control be maintained at other times outside the rainy season. In the event of failure or refusal by the contractor, permittee or project owner to properly maintain the devices, the director may cause emergency maintenance work to be done to protect adjacent private and public property. The cost shall be charged to the owner and shall include an initial mobilization cost plus the cost of doing the work as provided in Section C7-54. B. In the event the director must cause emergency maintenance work to be done, he or she may revoke the grading permit in writing. The permit shall not be renewed until an erosion control system approved by the director is installed, payment for costs incurred by the city have been made and a fee of one-half the amount required for the original permit paid by the owner. The director may waive installation of an erosion control system after April 15th. C. If any grading subject to Section C7-12 has commenced on private property without a valid grading permit, the property owner may be required to prepare and implement an erosion control plan approved by the director. Compliance with this provision does not relieve the property owner from responsibility or liability for the grading violation. If the property owner fails to install the approved erosion control system by October 15th, the director may cause emergency work to be done to protect adjacent private and public property during the October 15th through April 15th winter season. The procedures of Section C7-28 shall not apply to such emergency work. Cost of the emergency work shall be charged to the property owner in accordance with subsections A and B above. (Ord. No. 409, § 2, 12-9-2008)