Title 8 — ZONING & DEVELOPMENT CODE
Chapter 8.420 — QUARRIES
San Mateo County Zoning Code · 2026-06 edition · updated 2026-07-25 · San Mateo County
8.420.010 - Operation and Maintenance of Quarries. ¶
It shall be unlawful for any person to operate or maintain or to cause to be operated or maintain any quarry in the County of San Mateo, State of California, except in conformance with the provisions of this ordinance.
San Mateo County, California, Code of Ordinances Title 8 – Zoning & Development Code
8.420.020 - Definitions: ¶
For the purpose of this ordinance, certain words and phrases are defined as follows, and certain provisions shall be construed as herein set forth unless it shall be apparent from their context that they have different meaning.
COUNTY: The unincorporated area of the County of San Mateo, State of California.
PLANNING COMMISSION: The planning commission of said county.
PERSON: Shall include individual person or persons, firm, association, co-partnership, or corporation,
QUARRY: Premises from which any rock, sand, gravel, stone, earth other than topsoil, or mineral is removed or excavated for the purpose o! disposition away from the immediate premises whether such disposition is immediate or in the future, Provided, however, that not to exceed JOO cubic yards of material may be removed from any one building site, after a permit has been secured from the County Building Inspector for the construction of a permanent structure on the same site, without said operation being construed to be a quarry and coming within the provisions of this ordinance.
TOPSOIL: The immediate surface area of land consisting either of topsoil or sub-soil.
8.420.030 - Permits Required. ¶
A. Quarries may be operated in any portion of the, county subject, to the securing of an annual permit as herein specified and subject to the regulations of this ordinance re- quiring the posting of a corporate surety bond, the amount to be determined by the San Mateo County Engineer and approved by the planning commission for the faithful performance of the conditions of the permit.
B. Application for permit:
Each application for any such permit shall be made to the planning commission in a form provided by the planning commission. Such application shall be accompanied by:
An accurate plot plan showing the exterior boundaries of the property on which the quarry is, or is proposed to be located, the boundaries of the area proposed to be excavated, and the location of any existing or proposed structures, roads, or other improvements.
Cross sections through the quarry (existing or proposed) sufficient to indicate the slopes of existing and proposed cut banks,
Contour map when required by the planning commission.
Statement of plan of operation including time limits, areas to be removed, final grading of site, replacing of topsoil, and planting,
The planning commission, upon receipt of the application and upon the payment of the required fee, shall make such investigations as are necessary to determine whether or not the quarry or proposed quarry conforms or will conform fully to the regulations herein set forth and with the terms of other county ordinances pertaining to land use or operation of quarries, The planning
San Mateo County, California, Code of Ordinances Title 8 – Zoning & Development Code
commission shall refer the application to such other agency or board for approval or recommendations it deems necessary. The planning commission may hold such hearings as are deemed necessary, At the conclusion of investigation and any such hearings, the planning commission shall make findings as to whether or not the 'quarry, or proposed quarry, is, will be, or may be likely to become a public nuisance, or will be dangerous or detrimental to the public peace, health, safety, or the general welfare, II, in the opinion of the planning commission, the operation of the existing or proposed quarry will not be detrimental or dangerous to the public peace, safety, or the general welfare, a twelve month permit shall be issued as herein provided. The planning commission, in issuing any such permit, shall specify such conditions as are deemed necessary for the protection of per sons and property, in the neighborhood and to insure that the operation of the quarry will not adversely affect the char- acter of the neighborhood in which the quarry is located, The planning commission shall require such bonds and other guarantees as are necessary to insure compliance with the regulations Imposed under the terms of any permit, In case the planning commission denies any permit applied for under the terms of this ordinance or imposes restrictions which the applicant deems to be arbitrary or unreasonable, the applicant may appeal such decision to the Board of Supervisors.
mmission shall require such bonds and other guarantees as are necessary to insure compliance with the regulations Imposed under the terms of any permit, In case the planning commission denies any permit applied for under the terms of this ordinance or imposes restrictions which the applicant deems to be arbitrary or unreasonable, the applicant may appeal such decision to the Board of Supervisors.
- C. The fee for a permit to operate or maintain a quarry for the period of one year from the date of such permit shall be $50,00 payable in advance to the planning commission,
D. Inspection Fees.
In addition to the fee for a permit., the quarry operator shall pay to the county the actual cost of inspections of the quarry at prevailing wage rates at intervals not more frequent than once every 30 days for the purpose of determining whether the operation of the quarry is in full compliance with regulations herein set forth and any special conditions imposed under the terms of any permit. Such inspections shall include surveying, if and as necessary, to determine boundaries of excavation, slopes of cut banks, and other such conditions. The permit fee shall include the cost of two inspections.
E. Revocation or suspension of Permits:
Any permit granted hereunder shall be subject to revocation or suspension by the planning Commission in the following manner. A notice shall be served on the person holding said permit specifying wherein they has failed to comply with this ordinance or any other ordinance or with any terms or conditions specified in the permit for such quarry and requiring them to appear before the planning commission at a date and, hour specified not less than five days after the serving of said notice on said permit holder, to show cause at said time and place why said permit should not be revoked or suspended; at such Ume and place the person holding said permit shall have the right to appear in person or by counsel and to introduce such evidence as they may desire, and the planning commission shall confront said permit holder with any charges that said Board of Supervisors, or planning commission, or both of them may have against them, and after said hearing, the planning commission, may, if in its opinion the permit holder has violated the terms of their permit, revoke or suspend said permit, 'Persons may appeal to the Board of Supervisors regarding the revocation of any such permit.
8.420.040 – General Requirements: ¶
Quarries may be operated and maintained in any district subject to the following general requirements:
- A. Excavation:
San Mateo County, California, Code of Ordinances Title 8 – Zoning & Development Code
Cut slopes steeper than one to one (1:1) shall in no case be brought closer than 25' to any exterior property line.
When cut slopes steeper than one to one (1:1) exceed 50’ vertically, they shall be stepped at intervals not exceeding 50’ vertically, and such step shall be at least 15’ wide,
B. Fencing:
- All quarries shall be fenced by a substantial, neat, 6’ fence with posts spaced 15’ center to center and barbed wire spaced one foot apart, The fence design shall meet the approval, of the planning commission,
C. Drainage Of Premises:
The finished excavation shall in all cases be grade in such a manner as to prevent the accumulation of storm water or natural seepage,
Finished grades in all cases shall have slopes not less than one and one half percent,
D. Erosion control and screen planting:
All surface drainage existing or developing by or through the quarry shall be controlled by dikes, barriers, or drainage structures to prevent any silt or loose-material from filling any existing drainage course or encroaching on state or county roads or private property, All provisions to control natural drainage or flood water shall meet with the approval of 'the county engineer.
Fina cut slopes shall be treated as required to prevent erosion; topsoil shall be replaced on level areas when necessary to support vegetation. Suitable ground cover shall be planted within twelve months of the time a cut slope is excavated to its final position. Such ground cover shall be maintained for a period of time sufficient to provide vegetation of density that will prevent erosion.
In cases where material in the quarry is of such nature that no erosion will take place, plant material of type and quantity specified by the planning commission shall be placed as required lo screen cut slopes from public view,
E. Maintenance and Operation:
The quarry premises shall be maintained at all times in a neat and orderly manner.
The operation of the quarry; shall be conducted in such a manner as to obviate excessive dust and noise, The operator shall maintain haulage, roads in a dust free condition providing such surfacing or other treatment deemed necessary by the planning commission.
The holder of the quarry permit shall be responsible for spilling or dumping of quarried material on county highways or roads as prohibited by this ordinance.
8.420.050 -Each Violation a Separate Offense: ¶
Each persons violating or contributing in any way to the violation of any of the provisions of this ordinance shall be deemed guilty of a separate offense for each day during which such violation continues, and such violation shall be deemed to be a misdemeanor and shall be punishable therefore as herein provided,
San Mateo County, California, Code of Ordinances Title 8 – Zoning & Development Code
8.420.060 - Penalties: ¶
It shall be the duty of every person owning, leasing, renting, or operating a quarry to comply with all of the provisions of this ordinance and the terms of any permit granted by the Planning Commission, and any person violating any of the provisions of this ordinance or the terms of any permit or contributing In any way to the violation thereof shall be deemed guilty of a misdemeanor, and upon conviction thereof shall be punished by a fine not exceeding five hundred dollars ($500, 00) or by imprisonment in the Sau Mateo County Jail not exceeding three (3) months or by both such fine and imprisonment,
8.420.070 - Enforcement: ¶
Any quarry set up, altered, constructed, enlarged, converted, operated, or maintained contrary to the provisions of this ordinance and/or any use of any land or premises established, convicted, operated, or maintained contrary to the provisions of this ordinance shall be and the same is hereby declared to be unlawful and a public nuisance, and the District Attorney of said County shall, upon order of the Board of Supervisors, immediately commence action or proceedings for the abatement and removal and enjoinment thereof in the manner provided by law and shall take such other steps and shall apply to such court or courts as may have jurisdiction lo grant such relief as will abate and remove such quarry and restrain and enjoin any person from setting up, or maintaining, or using any quarry, or using any property contrary to the provisions of this ordinance,
The remedies provided for herein shall be cumulative and not exclusive.
8.420.080 – Validity. ¶
If any section, sub-section, sentence, clause, or phrase of this ordinance is for any reason held to be unconstitutional, such decision shall not affect the validity of the remaining portion of this ordinance. The Board of Supervisors of the county here-by declares that it would have passed this ordinance, and each section, sub-section, clause, sentence, and phrase thereof, irrespective of the fact that any one or more sections, sub-section, sentences, clauses, or phrases be declared unconstitutional,
8.420.090 - Short Title: ¶
This ordinance shall be known and cited as the "Quarry Ordinance” of the County of San
Mateo.
(Prior code Division VI, Part 4, Chapter 4 added; Ord. 761, 10/27/1947)
(Prior code Division VI, Part 4, Chapter 4 repealed and replaced, Ord. 961, 10/02/1951)
San Mateo County, California, Code of Ordinances Title 8 – Zoning & Development Code
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Mateo County Zoning Code
-
▸ Title 8 — ZONING & DEVELOPMENT CODE
Overview- Article 1 — ZONING DISTRICTS, OVERLAY, AND COMBINING DISTRICTS
- Chapter 8.04 — ZONING GENERAL PROVISIONS
- Chapter 8.08 — DISTRICTS
- Chapter 8.12 — RE, RESIDENTIAL ESTATES
- Chapter 8.16 — R1, ONE-FAMILY RESIDENTIAL DISTRICTS
- Chapter 8.20 — R1-CCP, COUNTRY CLUB PARK
- Chapter 8.24 — R2, TWO-FAMILY RESIDENTIAL DISTRICT
- Chapter 8.28 — R3, MULTIPLE-FAMILY RESIDENTIAL DISTRICT
- Chapter 8.32 — R3-A, AFFORDABLE HOUSING DISTRICT
- Chapter 8.34 — PUD, PLANNED UNIT DEVELOPMENT DISTRICT
- Chapter 8.36 — A1, AGRICULTURAL DISTRICT
- Chapter 8.40 — A2, EXCLUSIVE AGRICULTURE DISTRICTS
- Chapter 8.44 — A3, FLORICULTURAL DISTRICTS
- Chapter 8.48 — COSC, COMMUNITY OPEN SPACE CONSERVATION DISTRICT
- Chapter 8.52 — EG, EL GRANADA GATEWAY DISTRICT
- Chapter 8.56 — P, PARKING DISTRICT
- Chapter 8.60 — H1, LIMITED HIGHWAY FRONTAGE DISTRICT
- Chapter 8.64 — O, OFFICE DISTRICTS
- Chapter 8.68 — C1, NEIGHBORHOOD BUSINESS DISTRICTS
- Chapter 8.70 — C1/NFO DISTRICT, NEIGHBORHOOD BUSINESS DISTRICT…
- Chapter 8.72 — C1/WMP District (NEIGHBORHOOD COMMERCIAL/WEST M…
- Chapter 8.76 — C2, GENERAL COMMERCIAL DISTRICTS
- Chapter 8.78 — C2, GENERAL COMMERCIAL DISTRICTS NORTH FAIR OAKS
- Chapter 8.82 — CCR, (COASTSIDE COMMERCIAL RECREATION DISTRICT)
- Chapter 8.86 — M1 (LIGHT INDUSTRIAL DISTRICTS)
- Chapter 8.88 — M1/NFO DISTRICT (MIXED-USE INDUSTRIAL/NORTH FAI…
- Chapter 8.90 — M1/EDISON/NFO” DISTRICT (MIXED-USE INDUSTRIAL/E…
- Chapter 8.94 — M2, HEAVY INDUSTRIAL DISTRICTS
- Chapter 8.98 — W, WATERFRONT DISTRICT
- Chapter 8.102 — I/NFO, INSTITUTIONAL/NORTH FAIR OAKS DISTRICT
- Chapter 8.106 — PAD DISTRICT, PLANNED AGRICULTURAL DISTRICT
- Chapter 8.110 — RH, RESIDENTIAL HILLSIDE DISTRICT
- Chapter 8.114 — PC DISTRICT (PLANNED COLMA DISTRICT)
- Chapter 8.118 — CMU-1 DISTRICT (COMMERCIAL MIXED USE-1 DISTRIC…
- Chapter 8.122 — CMU-2 DISTRICT (COMMERCIAL MIXED USE-2 DISTRIC…
- Chapter 8.126 — CMU-3 DISTRICT (COMMERCIAL MIXED USE-3 DISTRIC…
- Chapter 8.130 — NMU DISTRICT (NEIGHBORHOOD MIXED-USE DISTRICT,…
- Chapter 8.132 — NMU-ECR DISTRICT (NEIGHBORHOOD MIXED USE DISTR…
- Chapter 8.134 — RM DISTRICT (RESOURCE MANAGEMENT DISTRICT)
- Chapter 8.138 — RM-CZ DISTRICT (RESOURCE MANAGEMENT DISTRICT- …
- Chapter 8.142 — TPZ, TIMBERLAND PRESERVE ZONE
- Chapter 8.146 — TPZ-CZ, TIMBERLAND PRESERVE ZONE, COASTAL ZONE
- Chapter 8.150 — “S” DISTRICTS 1 to 13 (COMBINING DISTRICTS 1-13)
- Chapter 8.154 — S17 DISTRICT (COMBINING DISTRICT, MIDCOAST)
- Chapter 8.158 — S50 DISTRICT (COMBINING DISTRICT, NORTH FAIR O…
- Chapter 8.162 — S71 DISTRICT (COMBINING DISTRICT, DEVONSHIRE)
- Chapter 8.166 — S72 DISTRICT (COMBINING DISTRICT, WEST MENLO P…
- Chapter 8.170 — S73 DISTRICT (COMBINING DISTRICT, NORTH FAIR O…
- Chapter 8.174 — S74 DISTRICT (COMBINING DISTRICT, SELBY NEIGHB…
- Chapter 8.178 — S75 DISTRICT (COMBINING DISTRICT, WEEKEND ACRES)
- Chapter 8.182 — S81 DISTRICT (COMBINING DISTRICT, SAN MATEO HI…
- Chapter 8.186 — S82 DISTRICT (COMBINING DISTRICT, WEST MENLO P…
- Chapter 8.190 — S83 DISTRICT (COMBINING DISTRICT, LOS TRANCOS …
- Chapter 8.194 — S90 DISTRICT (COMBINING DISTRICT, MENLO OAKS)
- Chapter 8.198 — S91 DISTRICT (COMBINING DISTRICT, PALOMAR PARK)
- Chapter 8.202 — S92 DISTRICT (COMBINING DISTRICT, WEST MENLO P…
- Chapter 8.204 — S93 DISTRICT (COMBINING DISTRICT, NORTH FAIR O…
- Chapter 8.212 — S95 DISTRICT (COMBINING DISTRICT, LADERA)
- Chapter 8.216 — S100 DISTRICT (COMBINING DISTRICT, MENLO OAKS)
- Chapter 8.220 — S101 DISTRICT (COMBINING DISTRICT, PALOMAR PARK)
- Chapter 8.224 — S102 DISTRICT (COMBINING DISTRICT, DEVONSHIRE)
- Chapter 8.228 — S104 DISTRICT (COMBINING DIESTRICT, LADERA)
- Chapter 8.232 — S105 DISTRICT (COMBINING DISTRICT, MIDCOAST)
- Chapter 8.236 — S106 DISTRICT (COMBINING DISTRICT, LADERA)
- Chapter 8.240 — S108 DISTRICT (COMBINING DISTRICT, LOS TRANCOS…
- Chapter 8.244 — S110 DISTRICT (COMBINING DISTRICT, LADERA)
- Chapter 8.248 — AO DISTRICT (AIRPORT OVERLAY DISTRICT)
- Chapter 8.252 — CD DISTRICT (COASTAL DEVELOPMENT DISTRICT)
- Chapter 8.256 — DR DISTRICTS (DESIGN REVIEW DISTRICTS)
- Chapter 8.260 — MH DISTRICTS (MOBILE HOME PARKS)
- Chapter 8.264 — GH DISTRICT (GEOLOGIC HAZARDS DISTRICT REGULAT…
- Chapter 8.272 — E DISTRICT (ENTERTAINMENT OVERLAY DISTRICT)
- Chapter 8.276 — APPROVED SS & PUD DISTRICT REGULATIONS (SPECIA…
- Chapter 8.280 — USE PERMITS.
- Chapter 8.284 — LEGAL LOT REQUIREMENT, ZONING & BUILDING VIOLA…
- Chapter 8.288 — MAJOR DEVELOPMENT PRE-APPLICATION PROCEDURES.
- Chapter 8.292 — RM DEVELOPMENT REVIEW CRITERIA
- Chapter 8.294 — RM-CZ DEVELOPMENT REVIEW CRITERIA
- Chapter 8.296 — DEVELOPMENT REVIEW PROCEDURE
- Chapter 8.300 — FLOOD HAZARD AREAS
- Chapter 8.304 — ARCHITECTURAL SUPERVISION
- Chapter 8.308 — NORTH FAIR OAKS DESIGN REVIEW AND SITE DEVELOP…
- Chapter 8.312 — ZONING, REZONING, LAND DIVISION, IN THE TIMBER…
- Chapter 8.314 — LAND MANAGEMENT PLANNING REQUIREMENTS FOR USES…
- Chapter 8.316 — ZONING, REZONING, LAND DIVISION IN THE TIMBERL…
- Chapter 8.318 — LAND MANAGEMENT PLANNING REQUIREMENTS FOR USES…
- Chapter 8.320 — VARIANCES AND HOME IMPROVEMENT EXCEPTIONS
- Chapter 8.324 — ACCESSORY USES PERMITTED IN ANY “R” DISTRICT.
- Chapter 8.328 — STANDARDS FOR INDUSTRIAL USES IN THE C-1,C-2,M…
- Chapter 8.332 — FENCES, HEDGES, WALLS, HEIGHT & EXCEPTIONS
- Chapter 8.336 — HEIGHT: GENERAL PROVISIONS AND EXCEPTIONS.
- Chapter 8.340 — YARDS: GENERAL PROVISIONS AND EXCEPTIONS
- Chapter 8.344 — OFF-STREET PARKING STANDARDS
- Chapter 8.348 — ACCESSORY BUILDINGS
- Chapter 8.352 — SPECIAL SETBACK LINES
- Chapter 8.356 — HEIGHT OF STRUCTURES AND USES OF AIRSPACE NEAR…
- Chapter 8.358 — HEIGHT OF STRUCTURES AND USE AIRSPACE NEAR SAN…
- Chapter 8.360 — DEVELOPMENT ON LANDS CONTIGUOUS TO RM, RM-CZ, …
- Chapter 8.364 — ROAD IMPROVEMENT REQUIREMENTS IN THE SKYLINE A…
- Chapter 8.368 — SHORT-TERM RENTALS (COASTAL ZONE)
- Chapter 8.372 — CHILD CARE CENTERS
- Chapter 8.376 — WIRELESS TELECOMMUNICATION FACILITIES
- Chapter 8.380 — KEEPING OF ANIMALS & DOMESTIC POULTRY IN
- Chapter 8.384 — CONFINED ANIMAL REGULATIONS
- Chapter 8.388 — ZONING NONCONFORMITIES
- Chapter 8.392 — ACCESSORY DWELLING UNITS
- Chapter 8.396 — ACCESSORY DWELLING UNITS, COASTAL ZONE
- Chapter 8.400 — SIGNIFICANT TREE REGULATIONS
- Chapter 8.404 — HERITAGE TREE REGULATIONS
- Chapter 8.408 — REGULATION OF TIMBER HARVESTING
- Chapter 8.412 — TOPSOIL SITE REGULATIONS
- Chapter 8.416 — SURFACE MINING AND RECLAMATION
- Chapter 8.420 — QUARRIES
- Chapter 8.424 — OIL AND GAS WELL REGULATIONS
- Chapter 8.428 — HISTORIC PRESERVATION PERMITS AND PROCEDURES.
- Chapter 8.432 — INCLUSIONARY REQUIREMENTS FOR AFFORDABLE HOUSING
- Chapter 8.436 — DENSITY BONUS
- Chapter 8.440 — ESTABLISHMENT OF FEES
- Chapter 8.444 — AMENDMENTS
- Chapter 8.448 — FORM OF PETITION, APPLICATIONS, AND APPEALS.
- Chapter 8.452 — ENFORCEMENT, LEGAL PROCEDURES, PENALTIES.