Skip to content

Title 8 — ZONING & DEVELOPMENT CODE›Article 1 — ZONING DISTRICTS, OVERLAY, AND COMBINING DISTRICTS›Chapter 8.110 — RH, RESIDENTIAL HILLSIDE DISTRICT

San Mateo County Zoning Code § 8.100 Rh, Residential Hillside District

San Mateo County Zoning Code · 2026-06 edition · updated 2026-09-23 · San Mateo County

Cite as: San Mateo County Zoning Code § 8.100 · Text as of 2026-09-23

8.100.040 - Minimum Building Site.

The minimum building site shall be determined in accordance with the following definitions and tables:

  • (a) “Contour Interval” shall mean the difference in elevation between adjacent contour lines on a topographical or planimetric map.

  • (b) “Average Percent of Slope” shall mean the percent of slope as computed by the following formula:

S = 100 IL

A

Where S = average percent of slope; I = contour interval in feet; L = summation of length of all contour lines in feet; A = area in square feet of parcel being considered. In calculating the average percent of slope, any part of the parcel will be excluded from the calculation if the owner so elects; however, if the owner makes this selection then in determining land use densities applicable to the parcel only the land used in the slope calculation shall be used in calculating allowable density. If the owner chooses this option, then land excluded from the calculation of density must remain undeveloped and a deed restriction recorded.

MINIMUM BUILDING SITE
Average Slope of Parcel
(percent)
Minimum Area
(square feet)
0 - 17 12,000
18 13,000
19 14,000
20 15,000
21 16,000
22 17,000
23 18,000
24 19,000
25 20,000
26 22,000
27 24,000
28 26,000
29 28,000
30 30,000
31 33,000
32 36,000
33 39,000
34 42,000
35 45,000
36 48,000
37 51,000
38 54,000
39 57,000
40 60,000
41 63,000
42 66,000
43 69,000
44 72,000
45 75,000
46 78,000
47 81,000
48 84,000
49 87,000
50 and over 90,000

When new divisions of land are proposed, the minimum size of each new parcel shall be based on the average slope of the land within each new parcel proposed in the land division. Areas devoted to public or private roads, rights-of-way, or access easements shall not be included in parcel size calculations.

After land division, if the maximum number of new parcels permitted by average slope measurement is created, a separate document shall be recorded that specifies that newly created parcels cannot be further divided into smaller parcels. If the maximum number is not created, leaving potential for future land division, the applicant must specify in a separate recorded document which parcels will eventually be divided.

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — San Mateo County Zoning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.