Chapter XXV — UNIFORM CODES›Article 15 — SMALL RESIDENTIAL ROOFTOP SOLAR ENERGY SYSTEMS

San Marino Municipal Code Art. 15 Small Residential Rooftop Solar Energy Systems

San Marino Municipal Code · 2026-10 edition · updated 2026-10-03 · San Marino

Cite as: San Marino Municipal Code § 25.15 · Text as of 2026-10-03

25.15.01: EXPEDITED PERMITTING OF SMALL RESIDENTIAL ROOFTOP SOLAR ENERGY SYSTEMS:

A. Small Residential Rooftop Solar Energy System Defined: "Small residential rooftop solar energy system" shall have the same meaning as provided in the solar rights act, Government Code section 65850.5(j)(3), as the same may be amended from time to time.

B. Small Residential Rooftop Solar Energy System Standard Plan And Permit Application Checklist:

  1. The city shall adopt standard plans and a checklist of all requirements with which small residential rooftop solar energy systems shall comply to be eligible for expedited review. The small residential rooftop solar energy system standard plans and checklist shall substantially conform to recommendations for expedited permitting, including the checklist and standard plans, contained in the most current version of the "California Solar Permitting Guidebook" adopted by the governor's office of planning and research.

  2. All documents required for the submission of a small residential rooftop solar energy system permit application, the standard plan(s), and checklist shall be made available on the publicly accessible city website.

  3. Electronic submittal of the required permit application and documents by e-mail or facsimile shall be available to all small residential rooftop solar energy system permit applicants. An applicant's electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature. Electronic permit applications shall be submitted through the method of electronic submittal specified by the building official.

C. Permit Application Review:

  1. An application that satisfies the information requirements in the checklist(s) and standard plans shall be deemed complete.

  2. If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission.

  3. The building official shall issue a building permit the same day for over the counter applications, or within one to three (3) business days for electronic applications, upon receipt of a complete application that meets the requirements of the city's standard checklist and plan(s), or as soon thereafter as may be practicable. Review of the application shall be limited to the building official's review of whether the application meets local, state, and federal health and safety requirements.

  4. Any condition imposed on a permit shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.

D. Inspection Requirements:

  1. Inspection requests may be submitted by e-mail or facsimile.

  2. Only one inspection shall be required for small residential rooftop solar energy systems eligible for expedited review.

  3. The inspection shall be done in a timely manner. The building official shall strive to schedule an inspection within two (2) business days of a request and provide a two (2) hour inspection window.

  4. Any condition imposed on a permit shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.

D. Inspection Requirements:

  1. Inspection requests may be submitted by e-mail or facsimile.

  2. Only one inspection shall be required for small residential rooftop solar energy systems eligible for expedited review.

  3. The inspection shall be done in a timely manner. The building official shall strive to schedule an inspection within two (2) business days of a request and provide a two (2) hour inspection window.

  4. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized but need not conform to the requirements of this section. (Ord. 0-15-1298, 9-9-2015; amd. Ord. O-25-1423-U, 9-26-2025)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — San Marino Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.