Title 8 — HEALTH AND SANITATION›Chapter 8.56 — SEPTIC TANKS AND SEEPAGE PITS
Article IV — PERMITS AND INSPECTIONS
San Marcos Municipal Code · 2026-09 edition · updated 2026-09-30 · San Marcos
8.56.140 - Permit Required to Construct Septic Tank.¶
8.56.150 - Application for Permit—Fee.¶
8.56.160 - Application for Permits Requiring No Field Investigation.¶
8.56.170 - Special Project Review.¶
8.56.180 - Change of Location of Work by Supplemental Permit—Fee.¶
8.56.190 - Investigation by Director—Director May Require Percolation Test—Denial of Permit.¶
8.56.200 - Fees Required for Percolation Tests and Septic System Layout Review.¶
8.56.210 - Minimum Lot Area of One Acre—Exceptions.¶
8.56.220 - Expiration of Permit.¶
8.56.230 - Evapotranspiration Type Systems—Revocation of Permits.¶
8.56.240 - Director to Make Inspections.¶
8.56.250 - Inspection Required—Approval.¶
8.56.260 - Backfilling Work Before Approval Prohibited.¶
8.56.270 - Connecting Plumbing to Unapproved Disposal System Prohibited.¶
8.56.280 - Reinspections—Fee.¶
8.56.290 - Violation—Misdemeanor.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code