§ 7-8-200. IMPROVEMENT OF RIGHT-OF-WAY REQUIRED.¶
Any building permit issued for construction, reconstruction or remodeling of any building or structure, the use of which building or structure thereafter will effect an increase of traffic generation on the street or streets upon which such lot abuts or will abut shall be conditioned upon improvement by the developer of 1/2 of such street or streets measured from the designated center line of such street or streets, by installation or relocation of paving, tie-in paving, curbs, gutters, sidewalks and driveways, storm and sanitary sewers, drainage facilities and street trees for the full width, and in the case of a corner lot, for the full depth and corner radii of such lot. No certificate of occupancy for such building or structure shall be issued until such improvements have been completed.
§ 7-8-205. DESIGNATED CENTER LINE.¶
(a) Where future right-of-way lines have been established pursuant to Chapter 7 of Title VII, the designated center lines shall be established by said future right-of-way lines.
(b) Where no future right-of-way lines have been established and the lot abuts a street or streets designated on the current Resolution Establishing The Master Plan of Streets, the designated center lines shall be the existing center lines of the streets and the corner radii resulting from intersecting center lines shall be determined by the applicable specifications therefor listed by street classification in the above described resolution.
(c) Where the above subsections are not applicable the designated center lines shall be the existing center line of the street as defined by the extension of the predominant existing street alignment on the street on which the lot is located.
§ 7-8-210. EXCEPTIONS.¶
The provisions of Section 7-8-200, except those provisions requiring installation or relocation of curbs, gutters, sidewalks, driveways and street trees, shall not be applicable to a building permit issued for construction, reconstruction or remodeling of a single family or two family dwelling, unless such reconstruction or remodeling converts such dwelling or a portion thereof to any other use.
§ 7-8-215. IMPROVEMENT DEFERRED—GUARANTY.¶
In any case in which installation or relocation prior to issuance of a certificate of occupancy of all or any part of the improvements required by Section 7-8-200 is determined by the Public Works Director to be impractical, he or she may accept in lieu thereof:
(a) A guaranty approved by the City Attorney in an amount adequate to cover the cost of such improvements as estimated by the Public Works Director, providing for the installation or relocation of such improvements upon default of the developer; or
(b) A cash deposit of said amount, which will constitute a discharge of the developer's improvement obligation hereunder.