Earlier editions: 2026-09
Title 3 — Health and Safety›Chapter 3-10 — TRAILER PARKS
San Leandro Municipal Code Art. 2 Permits and Fees
San Leandro Municipal Code · 2026-10 edition · updated 2026-10-04 · San Leandro
Cite as: San Leandro Municipal Code Article 2 · Text as of 2026-10-04
§ 3-10-200. PERMIT REQUIRED.¶
It is unlawful for any person to do any of the following unless he or she first makes application in writing to the City of San Leandro and obtains a permit therefor:
(a) Construct a trailer park.
(b) Construct additional buildings or reconstruct or move existing buildings in an existing trailer park.
(c) Operate, or rent, lease, sublease, let, or hire out for occupancy any space in a trailer park that has been constructed, reconstructed, or altered, or moved without having obtained a permit as required herein.
(d) Occupy for purposes of sleeping or habitation a trailer park or any portion thereof unless such trailer park is operating under a permit issued pursuant to this Chapter.
§ 3-10-205. FORM OF APPLICATION—NEW TRAILER PARK.¶
In the case of a new trailer park the application shall be accompanied by:
(a) A description of the grounds upon which the trailer park is to be constructed.
(b) Five sets of plans, drawn to scale, of the proposed development showing the location of all buildings, electrical facilities, driveways, toilet facilities, showers, laundry facilities, slop sinks, hydrants, and other improvements including the location of water and sewer lines.
(c) A description of the water supply, ground drainage, and method of sewage disposal.
§ 3-10-210. FORM OF APPLICATION—EXISTING TRAILER PARK.¶
existing trailer park the application shall be accompanied by:
(a) A description of the grounds upon which buildings are to be moved, or which is to be used for camping purposes.
(b) Five sets of plans and specifications of the proposed addition, reconstruction, or movement.
(c) A description of the water supply, ground drainage, and method of sewage disposal.
§ 3-10-215. INSPECTION AND ISSUANCE OF PERMIT.¶
Within 10 days after the application, description, plans, and specifications, and required fee, if any, are filed and paid, an inspector of the City of San Leandro shall inspect the grounds upon which the applicant proposes to do the work for which he or she seeks a permit. The City shall issue a written permit to the applicant if, in its opinion:
(a) The grounds are satisfactory for the work proposed.
(b) The descriptions and plans and specifications filed indicate that the work proposed will meet the requirements of this Chapter.
§ 3-10-220. NOTICE OF CHANGE IN NAME.¶
The City shall be notified by the owner or operator of any trailer park of any change in the name of or the ownership or possession thereof. Said notice shall be in written form and shall be furnished within 30 days after any change in the name or transfer of ownership.
§ 3-10-225. POSTING OF PERMITS.¶
Permits for construction and operation shall be posted in a conspicuous place.
§ 3-10-230. EXPIRATION OF PERMITS/EXTENSIONS.¶
All permits as required in this Chapter for construction or reconstruction of a trailer park shall automatically expire within six months from the date of the issuance thereof in those cases where the construction or reconstruction has not been completed within said period; provided, however, that the City of San Leandro may extend the expiration date of said permit for a reasonable time.
§ 3-10-235. PERMIT FEE.¶
A permit fee of $1.00 per camp site shall be charged before any such permit shall be issued, and a renewal fee shall be paid each year during the existence of such permit and in the said amount of $1.00 per camp site maintained within the trailer park.
Get a plain-English answer with a citation back to this text.
Ask AI about this code