Chapter 2 — BUILDING CODE
San Juan Capistrano Municipal Code · 2026-07 edition · updated 2026-09-27 · San Juan Capistrano
Sections in this part
§ 8-2.03. Underground utilities required.¶
§ 8-2.04. Permitted hours of construction operation.¶
§ 8-2.05. Roof coverings.¶
§ 8-2.06. Excavation and grading.¶
§ 8-2.06.01. Scope of excavation and grading.¶
§ 8-2.06.02. Definitions of excavation and grading.¶
§ 8-2.07. Grading permit requirements.¶
§ 8-2.07.01. Grading permit application.¶
§ 8-2.07.02. Responsibility of permittee.¶
§ 8-2.08. Bonds.¶
§ 8-2.09. Bonding requirements for property restoration.¶
§ 8-2.10. Drainage, terracing, and on-site improvements.¶
§ 8-2.11. Grading inspection.¶
§ 8-2.12. Completion of work.¶
§ 8-2.13. Import or export.¶
§ 8-2.14. Denial, suspension, or revocation.¶
§ 8-2.15. Erosion control and water quality requirement systems.¶
§ 8-2.16. Erosion control and water quality requirement system maintenance.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code