Part 2 — APPLICATION REQUIREMENTS
San Jose Municipal Code · 2026-09 edition · updated 2026-09-29 · San Jose
24.02.210 - Application.¶
A.
To obtain a permit an applicant shall file a completed application, in writing, on a form furnished by the building official for that purpose.
B.
Every such application shall:
Identify and describe the work to be covered by the permit for which application is made.
Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.
Indicate the use or occupancy for which the proposed work is intended.
Be accompanied by plans, diagrams, computations and specifications and other data as required in 24.02.220.
State the valuation of any new building or structure or any addition, remodeling or alteration to an existing building.
Be signed by the applicant, or the applicant's authorized agent.
Give such other data and information as may be required by the building official.
(Ord. 28166.)
24.02.220 - Submittal documents.¶
A.
Plans, specifications, engineering calculations, diagrams, soil investigation reports, special inspection and structural observation programs and other data shall constitute the submittal documents and shall be submitted in one (1) or more sets with each application for a permit.
B.
When such plans are not prepared by an architect or engineer, the building official may require the applicant submitting such plans or other data to demonstrate that state law does not require that the plans be prepared by a licensed architect or engineer.
C.
The building official may require plans, computations and specifications to be prepared and designed by an engineer or architect licensed by the state to practice as such even if not required by state law.
D.
Exception: The building official may waive the submission of plans, calculations, construction inspection requirements and other data if it is found that the nature of the work applied for is such that reviewing of plans is not necessary to obtain compliance with this title.
(Ord. 28166.)
24.02.230 - Information on plans and specifications.¶
A.
Plans and specifications shall be drawn to scale on electronic document or substantial paper and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that
it will conform to the provisions of this title and all relevant laws, ordinances, rules and regulations.
B.
Plans for buildings of other than Group R, Division 3 and Group U occupancies shall indicate how required structural and fire-resistive integrity will be maintained when a penetration will be made for electrical, mechanical, plumbing and communication conduits, pipes and similar systems.
(Ords. 28166, 28838, 29806.)
24.02.240 - Architect or engineer of record.¶
A.
When it is required that documents be prepared by an architect or engineer, the building official may require the owner to engage and designate on the building permit application an architect or engineer who shall act as the architect or engineer of record.
B.
If the circumstances require, the owner may designate a substitute architect or engineer of record who shall perform all of the duties required of the original architect or engineer of record.
C.
The building official shall be notified, in writing, by the owner if the architect or engineer of record is changed or is unable to continue to perform the duties.
D.
The architect or engineer of record shall be responsible for reviewing and coordinating all submittal documents prepared by others, including deferred submittal items, for compatibility with the design of the building.
(Ord. 28166.)
24.02.245 - Deferred submittals.¶
A.
For the purposes of this chapter, deferred submittals are defined as those portions of the design which are not submitted at the time of the application and which are to be submitted to the building official within a specified period.
B.
Deferral of any submittal items shall have prior approval of the building official. The architect or engineer of record shall list the deferred submittals on the plans and shall submit the deferred submittal documents together with any required additional fees for review by the building official prior to their installation.
C.
Submittal documents for deferred submittal items shall be submitted to the architect or engineer of record who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and that they have been found to be in general conformance with the design of the building.
D.
The deferred submittal items shall not be installed until their design and submittal documents have been approved by the building official.
(Ord. 28166.)
24.02.250 - Special inspection and observation program.¶
A.
When special inspection is required by CBC Chapter 17, the architect or engineer of record shall prepare an inspection program which shall be submitted to the building official for approval prior to issuance of the permit.
B.
The inspection program shall designate the portions of the work to have special inspection, the name or names of the individuals or firms who are to perform the special inspections and indicate the duties of the special inspectors.
C.
The special inspector shall be employed by the owner, the engineer or architect of record, or an agent of the owner, but not the contractor or any other person responsible for the work.
D.
When structural observation is required by CBC Chapter 17, the inspection program shall name the individuals or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur.
E.
The inspection program shall include samples of inspection reports and provide time limits for submission of reports.
(Ords. 28166, 29806.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code