Title 17 — BUILDINGS AND CONSTRUCTION
Chapter 17.88 — ELECTRIC VEHICLE CHARGING STATIONS AND EXPEDITED BUILDING PERMIT
San Jose Municipal Code · 2026-09 edition · updated 2026-09-29 · San Jose
Get a plain-English answer with a citation back to this text.
Ask AI about this code