Article II — Additional Requirements for Excavations
Sacramento Municipal Code · 2026-09 edition · updated 2026-09-30 · Sacramento
12.12.130 Permit requirements for excavations.¶
12.12.140 Permit-Requirements.¶
12.12.150 Restoration of pavement.¶
12.12.160 Opening, backfilling and paving trenches.¶
12.12.170 Repair of sunken pavement over excavation.¶
12.12.180 Newly-constructed or resurfaced streets—moratorium period.¶
12.12.190 Coordination of excavations.¶
12.12.200 Appeal of director's decision-Protest of trench cut cost recovery fee.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code