Skip to content

Title 4›Chapter 12.12

Article II — Additional Requirements for Excavations

Sacramento Municipal Code · 2026-09 edition · updated 2026-09-30 · Sacramento

12.12.130 Permit requirements for excavations.

12.12.140 Permit-Requirements.

12.12.150 Restoration of pavement.

12.12.160 Opening, backfilling and paving trenches.

12.12.170 Repair of sunken pavement over excavation.

12.12.180 Newly-constructed or resurfaced streets—moratorium period.

12.12.190 Coordination of excavations.

12.12.200 Appeal of director's decision-Protest of trench cut cost recovery fee.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Sacramento Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.