Chapter 5 — Development Standards
5.6. INDUSTRIAL AND INDUSTRIAL PARK ZONING
Sacramento County Zoning Code · 2026-06 edition · updated 2026-07-25 · Sacramento County
5.6.1. Purpose and Applicability ¶
The standards in this Section apply to:
Lots within the MP, M-1, and M-2 zones and lots created for industrial uses in other zoning districts where allowed, and,
All industrial projects including new construction, retrofitting, and remodeling of existing construction in all zones where permitted but not governed by other specific plan, special planning area, or neighborhood preservation area standards.
The standards in this Section are to be used in close concert with the County-wide Design Guidelines to achieve high quality projects that fit within the surrounding community.
Alternatives to these standards may be approved with a Special Development Permit if the intent and purpose of the standards and design guidelines are met.
5.6.2. Industrial and Industrial Park Development Standards ¶
[AMENDED 01-12-2019]
5.6.2.A. Development Standards Summary
Lots created within the industrial zoning districts or for industrial uses in other zoning districts where allowed, and all industrial projects, shall be subject to the development standards of Table 5.14, as follows:
- For the creation of new lots, the lot area requirement regulates minimum lot size and configuration for each zoning district and is not necessarily as optimum project design standards. Refer to the Countywide Design Guidelines for ways to provide compatibility, access and connectivity with surrounding neighborhoods.
Development of industrial projects in the industrial and industrial park zoning districts is subject to the applicable development standards in Table 5.14.
Development of industrial projects in non-industrial zoning districts is subject to the lot and development standards of the M-1 (Light Industrial) zone as summarized in Table 5.14.
All industrial development in subject to Design Review in accordance with the County-wide Design Guidelines.
Table 5.14 Industrial and Industrial Park Lot and Project Development Standards
This table has been split into multiple tables to comply with accessibility requirements. The following four tables shall all be referred to as a part of Table 5.14.
Lot Standards
| Required Development Standard | M-1 | M-2 | MP |
|---|---|---|---|
| Minimum Size (sq. ft) | 6,000 | 20,000 | 15,000 |
Yard Requirements, Building Height, and Landscaping Requirements
| Required Development | M-1 & M-2 | MP |
|---|---|---|
| Standard | ||
| Minimum Required Front and | 50 (Without PUPF) / 56 (With PUPF) | 25 (Without PUPF) / 31 |
| Side Street Yard (ft.) | (With PUPF) | |
| Minimum Required Interior | 0, 10 adjacent to agricultural zoning | 0, 10 adjacent to |
| Side and Rear Yard Adjacent | districts | agricultural zoning districts |
| to Non-Residential Use (ft.) | ||
| [1][2] | ||
| Minimum Required Interior | 24 (1-story); 100 (2-story and 3 story) | 24 (1-story); 100 (2-story |
| Side and Rear Yard Adjacent | and 3 story) | |
| to Single-Family Residential | ||
| Use (ft.) [2][3] | ||
| Projection Into Rear Yard | The main building may project into the | The main building may |
| required rear yard provided that an equal | project into the required | |
| area is provided as a yard or court within | rear yard provided that an | |
| the buildable portion of the lot. | equal area is provided as a | |
| yard or court within the |
| Required Development | M-1 & M-2 | MP |
|---|---|---|
| Standard | ||
| buildable portion of the | ||
| lot. | ||
| Maximum Building Height | 100 | 40 |
| (ft.) | ||
| Minimum Landscaping | Refer to Section 5.2.4, “Landscaping | Refer to Section 5.2.4, |
| Standards.” | “Landscaping Standards.” | |
| Landscaping in Visible Areas | All setback areas visible from public streets | All setback areas visible |
| and areas shall be landscaped, as required | from public streets and | |
| in Section 5.2.4. | areas shall be landscaped, | |
| as required in Section | ||
| 5.2.4. | ||
| Landscaping to Allow Front | Front yard depth may be reduced to a | 25 ft. (Without PUPF) / 18 |
| Yard Reduction/Minimum | minimum of 25 feet, and to a minimum of | ft. (With PUPF) |
| front yard landscaping | 31 feet for a right-of-way with a PUPF, | |
| between building and right- | provided that for each square foot of | |
| of-way | additional buildable area created by the | |
| application of this provision, an equivalent | ||
| square foot of landscape area is provided | ||
| in the corresponding street yard. | ||
| Exception for interior yard | No landscaping is required when located | No landscaping is required |
| areas adjacent to commercial | adjacent to commercial and industrial | when located adjacent to |
| or industrial zoning. | zoning districts. | commercial and industrial |
| zoning districts. |
All Other Requirements
| Development | Requirement |
|---|---|
| Standard | |
| Lighting | Site and street lighting shall enhance safety for employees, the public and pedestrians, |
| and shall comply with Section 5, Street Light Design of the Sacramento County |
| Development | Requirement |
|---|---|
| Standard | |
| Improvement Standards. Also, refer to Section 5.9.4.G. for Parking Lot Lighting | |
| standards | |
| Signage | Signs shall provide directions to building entry, wayfinding for autos, trucks and |
| pedestrians, and shall be integrated and designed at a quality consistent with the | |
| design of the project and shall comply with Chapter 5.10, Sign Regulations and the | |
| County’s Design Guidelines. | |
| Compliance with | All commercial activities, including truck loading, operation of machinery, and human |
| Noise Ordinance | activity areas, located within proximity of a residential or agricultural-residential zoning |
| (SCC Section | district shall comply with the County Noise Ordinance. If complaints are received and |
| 6.68) | non-compliance verified by the Environmental Management Department, then the |
| Planning Director may require the property owner to submit an acoustical study | |
| prepared by a qualified acoustical engineer. Said study shall provide recommended | |
| physical and operational measures to bring the property into compliance. | |
| The Planning Director may require compliance with such measures as a condition of | |
| the business license as provided for in SCC Section 4.06.090. This requirement shall | |
| be applicable to existing and new commercial uses. | |
| Circulation | Incorporate attractive and well-marked pedestrian networks that provide connectivity |
| and safe travel from the public rights-of-way and through parking areas. Design shall | |
| reflect the need for safely mixing and separating modes (i.e. trucks, autos, transit, | |
| pedestrians and bicyclists), while enhancing the pedestrian linkages to other | |
| buildings, transit and parking areas. | |
| Access | Provide cross-access between projects to the extent practicable to support mixed use |
| development, active design and walkability. | |
| Outdoor Storage | Within the buildable area of a lot, the outdoor storage of goods, if new or in good |
| [ADDED 01-12- | repair, may be allowed if completely screened from view in accordance with Section |
| 2019] | 5.2.5.D, “Commercial and Industrial Fences.” Such storage shall not block vehicular |
| or pedestrian pathways or be located in required parking or landscaped areas. |
Trash and Recycling Enclosures and Loading Docks
| Development Standard | Requirement |
|---|---|
| Minimum Setback from | 31 |
| Public Street (ft.) | |
| Minimum Setback from | 25 |
| residentially-zoned | |
| property, or property used | |
| for residential purposes | |
| (ft.) | |
| Minimum Setback from the | 15 |
| edge of pavement of a | |
| private street | |
| Required Gate Height | Six-foot minimum and eight-foot maximum required solid gate. |
| General Standards | All trash and recycling containers and enclosures shall be located within an |
| enclosed masonry area with a surrounding wall at least six feet high and no | |
| taller than eight feet in height, with an appropriate solid gate. | |
| Trash and recycling enclosure areas shall be designed to the County’s latest | |
| stormwater quality source control design standards. | |
| There shall be adequate area provided for recycling containers and | |
| enclosures. Recycling enclosures shall be located for functional use by | |
| occupants and by the disposal and hauling companies providing collection | |
| services. The appropriate authority can allow flexibility on the trash and | |
| recycling enclosure standards to facilitate the siting and provision of adequate | |
| space allocation for recycling collection and storage areas. | |
| Loading Docks - Setback | Loading docks shall be setback a minimum of 75 feet from the boundary of |
| property zoned or used for residential purposes, unless a reduced setback is | |
| allowed by a Special Development Permit approved by the Zoning | |
| Administrator. |
N/A = Not Applicable; PUPF = Public Utilities, Public Facilities easement (per Section 5.2.1)
[1] A side or rear yard is not required when the parcel within the M-1, M-2, or MP zone is adjacent to a rail line or spur track or abuts any of the following commercial and industrial zoness: SC, LC, GC, AC, TC, M-1, M-2, or MP.
[2] Exceptions for Parcels Adjacent to a Freeway or Scenic Corridor. If the rear yard or interior side yard abuts a freeway or scenic corridor, a minimum 15-foot rear or interior side yard setback shall be provided. The entire 15-foot setback shall be landscaped. A six-foot high fence constructed of wood, brick, rock, or other masonry material shall be used to screen storage yards. The fence shall extend along both sides of the exterior storage area for a distance of 100 feet perpendicular to the right-ofway to shield the stored materials from the view of oncoming traffic. No fence shall be required along the freeway right-of-way where the elevation of the freeway is more than eight feet above or below the grade of the adjacent property.
[3] Exceptions for Mechanical Equipment. Mechanical equipment may be located in the required rear yard or interior side yard provided that no structure or equipment shall occupy more than 200 square feet of the required yard area, or be located within five feet of any property boundary, or extend more than 12 inches above the finished grade. All vents, flues, doorways, or other openings shall be oriented away from the adjacent property boundary. Landscaping shall be provided to screen any portion of such use which extends above ground level.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Sacramento County Zoning Code
- Chapter 1 — General Provisions
- Chapter 2 — Zoning Districts
- Chapter 3 — Use Regulations
- Chapter 4 — Special and Combining Zoning Districts Sacramento …
-
▸ Chapter 5 — Development Standards
Overview- 5.1. INTRODUCTION
- 5.2. GENERAL STANDARDS AND EXCEPTIONS
- 5.3. AGRICULTURAL, AGRICULTURAL-RESIDENTIAL, AND RECREATIONAL …
- 5.4. RESIDENTIAL ZONING DISTRICTS
- 5.5. COMMERCIAL ZONING DISTRICTS
- 5.6. INDUSTRIAL AND INDUSTRIAL PARK ZONING
- 5.7. MIXED-USE ZONING DISTRICTS
- 5.8. [DELETED 07-16-2020]
- 5.9. OFF-STREET PARKING
- 5.10. SIGN REGULATIONS
- 5.11. FINDINGS FOR PROJECTS IN FLOOD HAZARD ZONES
- Chapter 6 — Administration
- Chapter 7 — Definitions and Acronyms
- Title IV — Interim Zones
- Title IX — Floodplain Management Ordinance