§ 13.10.445. Baseline monitoring reports.

  • (1) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determined under 40 CFR 403.6(a)(4), whichever is later, existing significant industrial users subject to such categorical pretreatment standards, and currently discharging to or scheduled to discharge to the POTW, shall be required to submit to the City a report which contains the information listed in subsection (2) of this section. At least 90 days prior to commencement of their discharge, new sources, and sources that become industrial users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the City a report which contains the information listed in subsection (2) of this section. A new source shall also be required to report the method of pretreatment it intends to use to meet applicable pretreatment standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged.

  • (2) The industrial user shall submit the information required by this section including:

    • (a) Identifying Information. The name and address of the facility including the name of the operator and owners.

    • (b) Wastewater Discharge Permits. A list of any environmental control wastewater discharge permits held by or for the facility.

    • (c) Description of Operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes.

    • (d) Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e).

    • (e) Measurement of Pollutants.

      • (i) Identify the categorical pretreatment standards applicable to each regulated process.

      • (ii) Submit the results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the City) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and long-term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operation and shall be analyzed in accordance with procedures set out in RDMC § 13.10.454.

      • (iii) Sampling must be performed in accordance with procedures set out in RDMC § 13.10.455.

    • (f) Certification. A statement reviewed by the industrial user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirement.

    • (g) Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in RDMC § 13.10.446, and signed by an authorized representative as defined by RDMC § 13.10.010.

    • (h) Signature and Certification. All baseline monitoring reports must be signed and certified in accordance with RDMC § 13.10.437(2).

  • (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.446. Compliance schedule progress report.

The following conditions shall apply to the schedule required by RDMC § 13.10.445. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, beginning and conducting routine operation). No increment referred to above shall exceed nine months. The industrial user shall submit a progress report to the City Manager or designee no later than 14 days following each date in the schedule and the final date of compliance. The report shall include at a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the industrial user to return to the established schedule. In no event shall more than nine months elapse between such progress reports to the City Manager or designee. (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.447. Report on compliance with categorical pretreatment standard deadlines.

Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any industrial user subject to such pretreatment standards and requirements shall submit to the City a report containing the information described in RDMC § 13.10.445(2)(d) through (f). For industrial users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the industrial user's long-term production rate. For all other industrial users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the industrial user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with RDMC § 13.10.437(2). (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.448. Periodic compliance reports.

  • (1) Any significant industrial user subject to a pretreatment standard shall, at a frequency determined by the City Manager or designee, but in no case less than once per year (in

December), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by such pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with RDMC § 13.10.437(2).

  • (2) All wastewater samples must be representative of the industrial user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of an industrial user to keep its monitoring facility in good working order shall not be grounds for the industrial user to claim that sample results are unrepresentative of its discharge.

  • (3) If an industrial user subject to the reporting requirement in and of this section monitors any pollutant more frequently than required by the POTW, using the procedure prescribed in RDMC § 13.10.454 and § 13.10.455, the results of this monitoring shall be included in the report.

  • (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.449. Reports of changed conditions.

Each industrial user is required to notify the City Manager or designee of any planned significant changes to the industrial user's operations or system which might alter the nature, quality or volume of its wastewater at least 45 days before the change.

  • (1) The City Manager or designee may require the industrial user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application.

  • (2) No industrial user shall implement the planned changed conditions until and unless the City Manager or designee has responded to the industrial user's notice.

  • (3) For purposes of this requirement, flow increases of 10 percent or greater, and the discharge of any previously unreported pollutants, shall be deemed significant.

  • (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.450. Reports of potential problems.

  • (1) In the case of any discharge including, but not limited to, accidental discharge of nonroutine, episodic nature, a noncustomary batch discharge, or a slug load which may cause potential problems for the POTW (including a violation of the prohibited discharge standards of this chapter), it is the responsibility of the industrial user to immediately telephone and notify the City of the incident. This notification shall include the location of discharge, type of waste, concentration and volume, if known, and corrective action taken by the industrial user.

  • (2) Within five days following such discharge, the industrial user shall, unless waived by the City Manager or designee, submit a detailed written report describing the causes of the discharge and the measures to be taken by the industrial user to prevent similar future occurrences. Such notification shall not relieve the industrial user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the industrial user of any fines, civil penalties, or other liability which may be imposed by this chapter.

  • (3) Failure to notify the City of potential problem discharges shall be deemed a separate violation of this chapter.

  • (4) A notice shall be permanently posted on the industrial user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in subsection (1) of this section. Employers shall ensure that all employees, who may cause or suffer such a discharge to occur, are advised of the emergency notification procedure.

  • (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.451. Reports from nonsignificant industrial users.

All industrial users not subject to categorical pretreatment standards and not required to obtain a wastewater discharge permit shall provide appropriate reports to the City as the City Manager or designee may require.

(Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.452. Notice of violation – Repeat sampling and reporting.

If sampling performed by an industrial user indicates a violation, the industrial user must notify the City within 24 hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the City within 30 days after becoming aware of the violation. The industrial user is not required to resample if the POTW performs monitoring at the industrial user's location at least once a month, or if the POTW performs sampling between the industrial user's initial sampling and when the industrial user receives the results of this sampling.

(Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.453. Notification of the discharge of hazardous waste.

  • (1) Any industrial user who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional Waste Management Division Director, and State hazardous waste authorities in writing of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the names of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the industrial user discharges more than 10 kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent information is known and readily available to the industrial users: an identification of the hazardous constituents contained in the wastes, an estimation of the mass of constituents in the waste stream expected to be discharged during the following 12 months. All notifications must take place no later than 30 days after the discharge commences. Any notification under this subsection (1) need be submitted only once for each hazardous waste discharged. However, notifications of changed discharges must be submitted under RDMC § 13.10.449. The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements of RDMC § 13.10.445, § 13.10.447 and § 13.10.448.

  • (2) In the case of any new regulations under Section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the industrial user must notify the POTW, the EPA Regional Waste Management Waste Division Director, and State hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations.

  • (3) In the case of any notification made under this section, the industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.

  • (4) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this chapter, a permit issued thereunder, or any applicable Federal or State law.

  • (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.454. Analytical requirements.

All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report, shall be performed in accordance with the techniques prescribed in 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by the EPA.

(Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.455. Sample collection – Determination of noncompliance.

  • (1) Sample Collection.

    • (a) Except as indicated in subsections (1)(b) and (c) of this section, the industrial user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the City Manager or designee. Where time-proportional composite sampling or grab sampling is authorized by the City, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides, the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the City, as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits.

    • (b) Samples for oil and grease, temperature, pH, cyanide, phenols, toxicity, sulfides, and volatile organic chemicals must be obtained using grab collection techniques.

    • (c) For sampling required in support of baseline monitoring and 90-day compliance reports required in RDMC § 13.10.445 and § 13.10.446, a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the City Manager or designee may authorize a lower minimum. For the reports required by RDMC § 13.10.448, the industrial user is required to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements.

  • (2) Determination of Noncompliance. The City Manager or designee may use a grab sample to determine noncompliance with pretreatment standards.

  • (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

§ 13.10.456. Record keeping.

Industrial users shall retain, and make available for inspection and copying, all records and information required to be retained under this chapter. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning compliance with this chapter, or where the industrial user has been specifically notified of a longer retention period by the City Manager or designee. (Ord. 286, 2012; Ord. 322 § 1, 2014)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Rio Dell Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.