Article III — MOVING BUILDINGS
Redwood City Municipal Code · 2026-09 edition · updated 2026-09-27 · Redwood City
In this part
- Sec. 9.22. - DEFINITIONS:
- Sec. 9.23. - APPLICATION OF ARTICLE TO FACTORY-BUILT HOUSING:
- Sec. 9.24. - PERMIT REQUIRED TO MOVE BUILDING:
- Sec. 9.25. - APPLICATIONS FOR PERMIT TO MOVE BUILDING:
- Sec. 9.26. - NOTICE TO BE POSTED BY APPLICANT ON BUILDING PROPOSED TO BE MOVED:
- Sec. 9.27. - FINDINGS AND CONDITIONS FOR PERMIT TO MOVE BUILDING:
- Sec. 9.28. - INSPECTION BY BUILDING OFFICIAL:
- Sec. 9.29. - BOND REQUIRED:
- Sec. 9.30. - BUILDING PERMIT REQUIRED:
- Sec. 9.31. - DUTY TO CLEAR DEBRIS AND FILL IN EXCAVATION ON FORMER SITE:
- Sec. 9.32. - CONDITIONS PREREQUISITE TO OCCUPYING MOVED BUILDING:
- Sec. 9.33. - PERMIT TO MOVE BUILDING ON SAME LOT:
- Sec. 9.34. - PERMIT TO MOVE BUILDING IN CITY TO OUTSIDE CITY:
- Sec. 9.35. - ADMINISTRATION OF ARTICLE:
Get a plain-English answer with a citation back to this text.
Ask AI about this code