Skip to content

Chapter 14.22 — ELECTRIC UTILITY

Redding Municipal Code · 2026-09 edition · updated 2026-09-27 · Redding

14.22.005 - Authority.

14.22.010 - Main services underground.

14.22.020 - Meter installation—Location.

14.22.030 - Meter installation—Sockets.

14.22.040 - Entrance switches.

14.22.050 - Electric motors.

14.22.060 - Three-phase service.

14.22.070 - Four-wire delta installations.

14.22.080 - Location of point of service.

14.22.090 - Service entrance—Underground.

14.22.100 - Voltage checks.

14.22.110 - Temporary service connections.

14.22.120 - Relocation cost.

14.22.130 - Tree removal.

14.22.140 - Prerequisites for service connection.

14.22.150 - Interruptions in electric service.

14.22.160 - Separate service for each premises and resale of electricity.

14.22.170 - Rate establishment.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Redding Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.