600.04: PROJECT REVIEW COMMITTEE:
Porterville Zoning Code · 2026-07 edition · updated 2026-07-09 · Porterville
The project review committee consists of the zoning administrator, city planner, city engineer, chief building official, and fire chief or their designees. The project review committee shall review development proposals for the following projects through the project review process:
A. All new or additions of five hundred (500) square feet or more to commercial or industrial structures;
B. Multi-family residential developments of four (4) or more units or consisting of two (2) or more structures;
C. A change of occupancy as deemed necessary by the Chief Building Official, or where the new occupant is in a different use classification than the former occupant;
D. Any project that requires a discretionary approval, including, but not limited to, conditional use permits, variances, zoning change, general plan amendment, subdivision, and annexation; and
E. Preliminary review of a map application.
(Ord. 1801, 12-3-2013; amd. Ord. 1881, 4-6-2021)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Porterville Zoning Code
- Series 100 — INTRODUCTORY PROVISIONS
- Series 200 — BASE DISTRICTS
- Series 300 — ADDITIONAL USE AND DEVELOPMENT REGULATIONS
- Series 400 — LAND DIVISIONS
- Series 500 — OVERLAY DISTRICTS
-
▸ Series 600 — ADMINISTRATION AND PERMITS
Overview-
▸ Article 600 — PLANNING AGENCY
- Article 601 — COMMON PROCEDURES
- Article 602 — ZONING CONFORMANCE REVIEW
- Article 603 — HILLSIDE DEVELOPMENT PERMIT
- Article 604 — CONDITIONAL USE PERMITS
- Article 605 — TEMPORARY USE PERMITS
- Article 606 — VARIANCES
- Article 607 — AMENDMENTS TO GENERAL PLAN
- Article 608 — AMENDMENTS TO ZONING MAP AND TEXT
- Article 609 — DEVELOPMENT AGREEMENTS
- Article 610 — ADJUSTMENTS
- Article 611 — ENVIRONMENTAL REVIEW
- Article 612 — APPEALS
- Article 613 — ENFORCEMENT
-
- Series 700 — GENERAL TERMS