Chapter 7 — GRADING, EROSION AND SEDIMENT CONTROL
§ 8-7
Placerville Municipal Code · 2026-09 edition · updated 2026-09-27 · Placerville
8-7-21: Applications, Plans And Specifications¶
8-7-65: Security Required¶
8-7-1: TITLE:¶
8-7-2: PURPOSE:¶
8-7-3: SCOPE:¶
8-7-4: DEFINITIONS:¶
8-7-5: GENERAL REQUIREMENTS; GRADING PERMIT REQUIRED:¶
8-7-6: EXEMPTIONS:¶
8-7-7: GENERAL REQUIREMENTS FOR GRADING:¶
8-7-8: WATER OBSTRUCTION:¶
8-7-9: CONSTRUCTION IN PUBLIC RIGHTS OF WAY:¶
8-7-10: HAZARDS:¶
8-7-11: ADMINISTRATION:¶
8-7-12: APPLICATION PROCEDURE:¶
8-7-13: COMPLIANCE WITH CEQA:¶
8-7-14: REFERRAL TO OTHER PUBLIC AGENCIES:¶
8-7-15: PERMIT CONDITIONS:¶
8-7-16: PERMISSION OF OTHER AGENCIES OR OWNERS:¶
8-7-17: LOCATION OF PROPERTY LINES:¶
8-7-18: TIME LIMITS:¶
8-7-19: VALIDITY:¶
8-7-20: APPEALS:¶
8-7-21: APPLICATION, PLANS AND SPECIFICATIONS:¶
8-7-22: PRELIMINARY GRADING PLANS:¶
8-7-23: FINAL GRADING PLANS; ENGINEER REQUIRED:¶
8-7-24: FINAL GRADING PLANS; ENGINEER NOT REQUIRED:¶
8-7-25: MODIFICATION OF APPROVED PLANS:¶
8-7-26: SEASONAL REQUIREMENTS:¶
8-7-27: DISTRIBUTION AND USE OF APPROVED PLANS:¶
8-7-28: GENERAL PERMIT REQUIREMENTS:¶
8-7-29: FEES:¶
8-7-30: GEOTECHNICAL STUDY REQUIRED:¶
8-7-31: STUDIES:¶
8-7-32: REPORTS; GENERAL:¶
8-7-33: SOIL/GEOLOGIC STUDY REPORT:¶
8-7-34: FINAL REPORT:¶
8-7-35: CHANGED CONDITIONS:¶
8-7-36: SPECIAL INSPECTION:¶
8-7-37: NONCOMPLIANCE NOTIFICATION BY GEOTECHNICAL ENGINEER OR CIVIL ENGINEER COMPETENT…¶
8-7-38: PERIODIC PROGRESS REPORTS BY PRIVATE GEOTECHNICAL ENGINEER OR CIVIL ENGINEER…¶
8-7-39: PROGRESS REPORT BY PERMITTEE:¶
8-7-40: SUBMIT AS BUILT PLANS:¶
8-7-41: PERFORMANCE OF WORK; INSPECTION:¶
8-7-42: OTHER RESPONSIBILITIES OF PERMITTEE:¶
8-7-43: TRANSFER OF PERMIT:¶
8-7-44: DESIGN AND REVIEW FOR MASS PAD GRADING:¶
8-7-45: EXCAVATION:¶
8-7-46: EXCAVATION SLOPE:¶
8-7-47: FILL PLACEMENT:¶
8-7-48: FILL COMPACTION:¶
8-7-49: GROUND PREPARATION FOR FILL PLACEMENT:¶
8-7-50: FILL SLOPES:¶
8-7-51: SLOPE FENCING:¶
8-7-52: ADJACENT STRUCTURES PROTECTION:¶
8-7-53: SETBACKS:¶
8-7-54: DRAINAGE; GENERAL:¶
8-7-55: DRAINAGE; DISPOSAL REQUIREMENTS:¶
8-7-56: DRAINAGE; WATER ACCUMULATION:¶
8-7-57: DRAINAGE PROTECTION OF ADJOINING PROPERTY:¶
8-7-58: DRAINAGE CONTROL:¶
8-7-59: SUBSURFACE DRAINAGE:¶
8-7-60: EROSION AND SEDIMENT CONTROL:¶
8-7-61: EMERGENCY CONDITIONS:¶
8-7-62: EROSION AND SEDIMENT CONTROL PLANS:¶
8-7-63: VEHICULAR WAYS; GENERAL:¶
8-7-64: VEHICULAR WAYS; DRAINAGE:¶
8-7-65: SECURITY REQUIRED:¶
8-7-66: ENFORCEMENT, SUSPENSION AND REVOCATION OF PERMIT:¶
8-7-67: CORRECTIVE WORK:¶
8-7-68: MISDEMEANOR VIOLATION:¶
8-7-69: NONEXCLUSIVE REMEDIES:¶
8-7-70: ENFORCEMENT OFFICIAL:¶
8-7-71: RIGHT OF ENTRY:¶
8-7-72: STOP WORK ORDERS:¶
8-7-73: LIABILITY:¶
8-7-74: DENIAL OF OTHER PERMITS AND INSPECTIONS:¶
8-7-75: SEVERABILITY:¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code