Chapter 7 — GRADING, EROSION AND SEDIMENT CONTROL

§ 8-7

Placerville Municipal Code · 2026-09 edition · updated 2026-09-27 · Placerville

8-7-21: Applications, Plans And Specifications

8-7-65: Security Required

8-7-1: TITLE:

8-7-2: PURPOSE:

8-7-3: SCOPE:

8-7-4: DEFINITIONS:

8-7-5: GENERAL REQUIREMENTS; GRADING PERMIT REQUIRED:

8-7-6: EXEMPTIONS:

8-7-7: GENERAL REQUIREMENTS FOR GRADING:

8-7-8: WATER OBSTRUCTION:

8-7-9: CONSTRUCTION IN PUBLIC RIGHTS OF WAY:

8-7-10: HAZARDS:

8-7-11: ADMINISTRATION:

8-7-12: APPLICATION PROCEDURE:

8-7-13: COMPLIANCE WITH CEQA:

8-7-14: REFERRAL TO OTHER PUBLIC AGENCIES:

8-7-15: PERMIT CONDITIONS:

8-7-16: PERMISSION OF OTHER AGENCIES OR OWNERS:

8-7-17: LOCATION OF PROPERTY LINES:

8-7-18: TIME LIMITS:

8-7-19: VALIDITY:

8-7-20: APPEALS:

8-7-21: APPLICATION, PLANS AND SPECIFICATIONS:

8-7-22: PRELIMINARY GRADING PLANS:

8-7-23: FINAL GRADING PLANS; ENGINEER REQUIRED:

8-7-24: FINAL GRADING PLANS; ENGINEER NOT REQUIRED:

8-7-25: MODIFICATION OF APPROVED PLANS:

8-7-26: SEASONAL REQUIREMENTS:

8-7-27: DISTRIBUTION AND USE OF APPROVED PLANS:

8-7-28: GENERAL PERMIT REQUIREMENTS:

8-7-29: FEES:

8-7-30: GEOTECHNICAL STUDY REQUIRED:

8-7-31: STUDIES:

8-7-32: REPORTS; GENERAL:

8-7-33: SOIL/GEOLOGIC STUDY REPORT:

8-7-34: FINAL REPORT:

8-7-35: CHANGED CONDITIONS:

8-7-36: SPECIAL INSPECTION:

8-7-37: NONCOMPLIANCE NOTIFICATION BY GEOTECHNICAL ENGINEER OR CIVIL ENGINEER COMPETENT…

8-7-38: PERIODIC PROGRESS REPORTS BY PRIVATE GEOTECHNICAL ENGINEER OR CIVIL ENGINEER…

8-7-39: PROGRESS REPORT BY PERMITTEE:

8-7-40: SUBMIT AS BUILT PLANS:

8-7-41: PERFORMANCE OF WORK; INSPECTION:

8-7-42: OTHER RESPONSIBILITIES OF PERMITTEE:

8-7-43: TRANSFER OF PERMIT:

8-7-44: DESIGN AND REVIEW FOR MASS PAD GRADING:

8-7-45: EXCAVATION:

8-7-46: EXCAVATION SLOPE:

8-7-47: FILL PLACEMENT:

8-7-48: FILL COMPACTION:

8-7-49: GROUND PREPARATION FOR FILL PLACEMENT:

8-7-50: FILL SLOPES:

8-7-51: SLOPE FENCING:

8-7-52: ADJACENT STRUCTURES PROTECTION:

8-7-53: SETBACKS:

8-7-54: DRAINAGE; GENERAL:

8-7-55: DRAINAGE; DISPOSAL REQUIREMENTS:

8-7-56: DRAINAGE; WATER ACCUMULATION:

8-7-57: DRAINAGE PROTECTION OF ADJOINING PROPERTY:

8-7-58: DRAINAGE CONTROL:

8-7-59: SUBSURFACE DRAINAGE:

8-7-60: EROSION AND SEDIMENT CONTROL:

8-7-61: EMERGENCY CONDITIONS:

8-7-62: EROSION AND SEDIMENT CONTROL PLANS:

8-7-63: VEHICULAR WAYS; GENERAL:

8-7-64: VEHICULAR WAYS; DRAINAGE:

8-7-65: SECURITY REQUIRED:

8-7-66: ENFORCEMENT, SUSPENSION AND REVOCATION OF PERMIT:

8-7-67: CORRECTIVE WORK:

8-7-68: MISDEMEANOR VIOLATION:

8-7-69: NONEXCLUSIVE REMEDIES:

8-7-70: ENFORCEMENT OFFICIAL:

8-7-71: RIGHT OF ENTRY:

8-7-72: STOP WORK ORDERS:

8-7-73: LIABILITY:

8-7-74: DENIAL OF OTHER PERMITS AND INSPECTIONS:

8-7-75: SEVERABILITY:

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Placerville Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.