Chapter 19.66 — SURFACE MINING AND RECLAMATION PLAN REGULATIONS

Perris Municipal Code · 2026-09 edition · updated 2026-09-27 · Perris

Sec. 19.66.010. - Purpose and intent.

The city recognizes that the extraction of minerals is essential to the continued economic well-being of the city and to the needs of society and that the reclamation of mined lands is necessary to prevent or minimize adverse effects on the environment and to protect the public health and safety. The city also recognizes that surface mining takes place in diverse areas where geologic, topographic, climatic, biological, and social conditions are significant and therefore, may vary accordingly. The purpose and intent of this chapter is to regulate surface mining operations as authorized by California's Surface Mining and Reclamation Act (SMARA) of 1975 (P.R.C. Sec. 2710 et seq.), as amended, hereinafter referred to as SMARA: P.R.C. § 2207; and the California Code of Regulations adopted pursuant thereto (14 Cal. Admin., S. § 3500 et seq.), to ensure that:

(1)

Prevent adverse effects. The adverse effects of surface mining operations will be prevented or minimized and that the reclamation of mined lands will provide for the beneficial, sustainable long-term productive use of the mined and reclaimed lands.

(2)

Encourage production and conservation. The production and conservation of minerals will be encouraged while eliminating hazards to public health and safety and avoiding or minimizing adverse effects on the environment, including, but not limited to, geologic subsidence, air pollution, water quality degradation, damage to biological resources, flooding, eroding, degradation of scenic quality, and noise pollution

(Code 1972, § 19.66.010)

Sec. 19.66.020. - Incorporation of SMARA and state regulations.

The provisions of the California Surface Mining and Reclamation Act of 1975 (P.R.C. Sec. 2710 et seq.), P.R.C. § 2207, and the California Code of Regulations implementing the Act (14 Cal. Admin., § 3500 et seq.), hereinafter referred to as the state regulations, as either may be amended from time to time, are made a part of this chapter by reference with the same force and effect as if the provisions therein were specifically and fully set out herein, excepting that when the provisions of this chapter are more restrictive than conflicting state provisions, this chapter shall prevail.

(Code 1972, § 19.66.020)

Sec. 19.66.030. - Applicability.

(a)

Requirements for conditional use permit. Unless exempted by provisions of this chapter, an approved conditional use permit as provided under chapter 19.61 shall be required for all surface mining operations in all zoning districts in which surface mining is allowed, and shall be required for the expansion or substantial change of operation of any surface mine for which such expansion or changes have not been thereby approved, including any operation which meets the definition of a "nonconforming use" pursuant to chapter 19.08.

(b)

Requirement for reclamation plans. A reclamation plan shall be required for all surface mining operations in all zoning districts in which surface mining is allowed, as well as for those portions of existing surface mining operations conducted after January 1, 1976, unless a reclamation plan was approved by the city prior to that date and the person submitting that plan has accepted responsibility for carrying out the plan. Nothing in this chapter shall be construed as requiring the filing of a reclamation plan for, or the reclamation of, mined lands on which surface mining operations were conducted legally and in compliance with all applicable city regulations prior to January 1, 1976.

(Code 1972, § 19.66.030)

Sec. 19.66.040. - Exemptions.

(a)

Reclamation plan. A reclamation plan shall not be required for any of the following activities:

(1)

Excavations or grading conducted for farming or on-site construction or for the purpose of restoring land following a flood or natural disaster (SMARA, § 2714(a)).

(2)

Prospecting or, or the extraction of, minerals for commercial purposes and the removal of overburden in total amounts of less than 1,000 cubic yards in any one location of one acre or less (SMARA, § 2714(b)).

(3)

Surface mining operations that are required by federal law in order to protect a mining claim, if such operations are conducted solely for that purpose (SMARA, § 2714(c)).

(b)

Other. Such other surface mining operations what the state mining and geology board determines to be of an infrequent nature and which involve only minor surface disturbances (SMARA, § 2714(d)).

(Code 1972, § 19.66.040)

Sec. 19.66.050. - Contents of applications for conditional use permits for surface…

reclamation plans.

(a)

Conditional use permit and supplemental application. In addition to the conditional use permit (CUP) application required in chapter 19.61, all applications for CUPs for surface mining operations shall contain the surface mining application supplement required by the planning and community development department. As many copies of the CUP and surface mining application supplement may be required shall be submitted to the department of planning and community development.

(b)

Copies. As many copies of the reclamation plan application as may be required shall be submitted in conjunction with all applications for CUPs for surface mining operations. For surface mining operations that are exempt from a CUP pursuant to this chapter, the reclamation plan application shall include information concerning the mining operation that is required for processing the reclamation plan.

(c)

Environmental forms. Applications shall include the necessary environmental review forms and information prescribed by the planning and community development department.

(d)

Review for completeness. The planning and community development department will review the application package for completeness and shall, within 30 days after receipt, either accept the application as complete for the purpose of initiating permit processing or return the application as incomplete with an explanation of where the application is deficient. Resubmittal of the revised application is deficient. Resubmittal of the revised application shall start a new review time frame.

(Code 1972, § 19.66.050)

Sec. 19.66.060. - Processing.

(a)

Notification. Within 30 days of acceptance of an application for a conditional use permit for surface mining operations and/or a reclamation plan as complete, the planning and community development department shall notify the state geologist of the filing of the application (SMARA, Sec. 2774(e)). Whenever mining operations are proposed in the 100-year flood plain of any stream, as shown in Zone A of the flood insurance rate maps issued by the Federal Emergency Management Agency, and within one mile, upstream or downstream, of any state highway bridge, the planning and community development department shall also notify the state department of transportation that the application has been received (SMARA, § 2770.5).

(b)

Environmental review and staff review.

(1)

The planning and community development department shall process the application through environmental review pursuant to the California Environmental Quality Act (CEQA) and the city's environmental review guidelines.

(2)

Subsequent to the appropriate environmental review, the planning and community development department shall prepare a staff report with recommendations for consideration by the city council. The city's staff review committee shall assist the planning and community development department in developing appropriate recommendations.

(c)

City council review and approval.

(1)

The city council shall hold at least one public hearing on the conditional use permit and/or reclamation plan. Prior to final approval of a reclamation plan, financial assurances (as provided in this chapter), or any amendments to a reclamation plan, the city council shall certify to the state geologist that the reclamation plan complied with the applicable requirements of the state regulations and submit the plan, assurances, or amendments to the state geologist for review (SMARA, § 2774(c)). The city council may conceptually approve the reclamation plan before submittal to the state geologist. If a conditional use permit is being processed concurrently with the reclamation plan, the city council may also conceptually approve the CUP at this time. However, the city council may defer action on the CUP until taking final action on the reclamation plan. If necessary to comply with permit processing deadlines, the city council may conditionally approve the CUP with the condition that the planning and community development department shall not issue the CUP for the mining operation until financial assurances have been approved by the state geologist and final action has been taken on the reclamation plan.

(2)

The state geologist shall have 45 days to prepare written comments on the reclamation plan, if the state geologist chooses (SMARA, § 2774(d)). The city council shall evaluate written comments received from the state geologist during the 45-day comment period. Staff shall prepare a written response describing the disposition of the major issues raised by the state for the city council's approval. In particular, when the city council's position is at variance with the recommendations and objections raised in the state geologist's comments, the written response shall address, in detail, why specific comments and suggestions were not accepted (SMARA, § 2774(d)). Copies of any written comments received and responses prepared by the city council shall be promptly forwarded to the operator.

(d)

Final action. The city council shall then take final action to approve, conditionally approve or deny the conditional use permit and/or reclamation plan. The planning and community development department shall forward a copy of each approved conditional use permit for mining operations and/or approved reclamation plan to the state geologist.

(e)

Annual reports. Surface mining operators shall forward an annual status report to the state geologist and city planning and community development department on a date established by the state geologist upon forms furnished by the state mining and geology board (P.R.C. § 2207 (a)—(g)).

(Code 1972, § 19.66.060)

Sec. 19.66.070. - Performance standards for reclamation plans.

(a)

Minimum Standards. All new or revised reclamation plans shall conform to minimum statewide performance standards required pursuant to SMARA § 2773(b), as adopted by the state mining and geology board, including, but not limited to, wildlife habitat, backfilling, re-vegetation, drainage, agricultural land reclamation, equipment removal, stream protection, topsoil salvage and waste management.

(b)

Additional standards. The city may impose additional performance standards developed either in review of individual projects, as warranted or through the formulation and adoption of city-wide performance standards.

(Code 1972, § 19.66.070)

Sec. 19.66.080. - Phasing of reclamation.

Phasing of reclamation (see also section 9.60.120). Reclamation activities shall be phased with respect to the phasing of the mining operation and shall be initiated at the earliest possible time on those portions of the mined lands that will not be subject to further disturbance (SMARA, § 2772(f)). Interim reclamation may also be required for mined lands that have been disturbed and will be disturbed again in future operations. Reclamation may be done on an annual basis, or in stages compatible with continued operations, or on completion of all excavation, removal or fill as approved by the city. Each phase of reclamation shall be

specifically described in the reclamation plan and shall include the beginning and expected ending dates for each phase; all reclamation activities required; criteria for measuring completion of specific reclamation activities; and estimated costs as provided in section 19.66.100. The city shall approve the reclamation schedule.

(Code 1972, § 19.66.080)

Sec. 19.66.090. - Findings for approval.

(a)

General compliance. In addition to the findings for approval of conditional use permits contained in chapter 19.54, approval of conditional use permits for surface mining operations shall include a finding that the project complies with the provisions of state regulations.

(b)

Reclamation plans. For reclamation plans, the following findings shall be required:

(1)

That the reclamation plan complies with section 2772, 2773 and 2773.1 of SMARA and any other applicable provisions.

(2)

That the reclamation plan complies with applicable requirements of the state regulations (14 Cal Admin., § 3500 et seq.).

(3)

That the reclamation plan and potential use of reclaimed land pursuant to the plan are consistent with this chapter and the city's general plan and any applicable resource plan or element.

(4)

That, through the reclamation plan, all significant adverse impacts on lands to be reclaimed as a result of the surface mining operations are mitigated to the maximum extent feasible.

(5)

That the land and/or resources such as water bodies to be reclaimed will be restored to a condition that is compatible with and blends with the surrounding natural environment, topography and other resources, or that suitable off-site development will compensate for related disturbances to resource values.

(6)

That the reclamation plan will restore the mined lands to a usable condition which is readily adaptable for alternative land uses consistent with the general plan and applicable resource plan.

(7)

That a written response to the state geologist has been prepared, describing the disposition of major issues raised by the state geologist. Where the city's position is at variance with the recommendations and objections raised by the state geologist, said response shall address, in detail, why specific comments and suggestions were not accepted (SMARA, § 2772(d)).

(Code 1972, § 19.66.090)

Sec. 19.66.100. - Financial assurances for reclamation plans.

(a)

Securities. In order to ensure that reclamation will proceed in accordance with the approved reclamation plan, the city shall require as a condition of approval one or more forms of security which will be released upon satisfactory performance. The applicant may post security in the form of a corporate surety bond, trust fund, irrevocable letter of credit from an accredited financial institution, a certificate of time deposit as part of an approved trust fund, or other method acceptable to the city and the state geologist as specified in statewide regulations adopted by the Mining and Geology Board. Financial assurances shall be made payable to the city and the state geologist (SMARA, § 2773.1(a)(4)).

(b)

Utilization of securities. Financial assurances will be required to ensure compliance with elements of the reclamation plan, including, but not limited to, re-vegetation and landscaping requirements; restoration of aquatic or wildlife habitat; protection of archaeological sites; restoration of water bodies and water quality; slope stability and erosion and drainage control; disposal of hazardous materials; and other mitigation measures. Financial assurances for such elements of the plan shall be monitored by the planning and community development department.

(c)

Amount of security. The amount of the financial assurances shall be based upon the estimated costs of reclamation for each year or phase stipulated in the reclamation plan, including any maintenance of reclaimed areas as may be required. Cost estimates shall be prepared by licensed engineers and/or other qualified professionals retained by the operator and approved by the planning director. Financial assurances may be based upon estimates, including, but not necessarily limited to, the volume of earth moved (cubic yards) for each year or phase of reclamation. Financial assurances to ensure compliance with re-vegetation, restoration of water bodies, restoration of aquatic or wildlife habitat, and any other applicable element of the reclamation plan shall be based upon cost estimates that include, but may not be limited to, labor, equipment, materials, mobilization of equipment, administration and reasonable profit by a commercial operator other than the permittee.

(d)

Cost projections. In projecting the costs of financial assurances, it shall be assumed without prejudice or insinuation that the surface mining operation could be abandoned by an operator and, consequently, the city or state may need to contract with a third-party commercial company for mobilization and reclamation of the site.

(e)

Annual increments. Where reclamation is accomplished in annual increments, the amount of financial assurances required for any one year shall be adjusted annually and shall be adequate to cover the full estimated costs for reclamation of any land projected to be in a disturbed condition from mining operations by the end of the following year. The estimated costs shall be the amount required to complete the reclamation on all areas that will not be subject to further disturbance, and to provide interim reclamation, as necessary, for any partially excavated areas in accordance with the reclamation plan. Financial assurances for each year shall be released upon successful completion of reclamation (including any maintenance required) of all areas that will not be subject to further disturbance and upon the operator filing additional financial assurances for the succeeding year. Financial assurances for all subsequent years of the operation shall be handled in the same manner.

(f)

Multiple year increments. Financial assurances for reclamation that is accomplished in multiple-year phases shall be handled in the same manner as described for annual reclamation.

(Code 1972, § 19.66.100)

Sec. 19.66.110. - Inspections.

The planning and community development department shall arrange for inspection of a surface mining operation within six months of receipt of the annual report required in section 9.60.050, to determine whether the surface mining operation is in compliance with the approved conditional use permit and/or reclamation plan, and the state regulations (SMARA, § 2774(b)). In no event shall less than one inspection be conducted in any calendar year. Said inspections may be made by a state calendar year. Said inspections may be made by a state-registered geologist, state-registered civil engineer, state-licensed landscape architect, state registered forester or other qualified specialists, as selected by the planning and community development department. All inspection shall be conducted using a form provided by the state mining and geology board. The planning and community development department shall notify the state geologist within 30 days of completion of the inspection that the inspection has been conducted and shall forward a copy of said inspection notice and any supporting documentation to the mining operator. The operator shall be solely responsible for the reasonable cost of such inspection.

(Code 1972, § 19.66.110)

Sec. 19.66.120. - Interim management plans.

(a)

Submittal of interim plans. Within 90 days of a surface mining operation becoming idle, as defined in chapter 19.08, the operator shall submit to the planning and community development department an interim management plan (SMARA, § 2770(h)). Financial assurances for idle operations shall be continued as addressed in the reclamation plan or as otherwise approved through the idle mine's interim management plan.

(b)

City council review. Within 60 days of receipt of the interim management plan, or a longer period mutually agreed upon by the planning and community development department and the operator, the city council shall review and approve or deny the plan in accordance with this chapter. The operator shall have 30 days or a longer period mutually agreed upon by the operator and the planning and community development department to submit a revised plan. The city council shall approve or deny the revised interim plan within 60 days of receipt.

(c)

Duration. The interim management plan may remain in effect for a period not to exceed five years, at which time the city council may renew the plan for another period not to exceed five years or require the surface mining operator to commence reclamation in accordance with its approved reclamation plan.

(Code 1972, § 19.66.120)

Sec. 19.66.130. - Time limited for commencement of use of conditional use permit for…

operations.

The time limit for commencing a surface mining operation that is permitted pursuant to this section shall be as provided in chapter 19.61.

(Code 1972, § 19.66.130)

Sec. 19.66.140. - Violation and penalties.

If the planning and community development department, based upon an annual inspection or otherwise confirmed by an inspection of the mining operation, determines that a surface mining operation is not in compliance with this chapter, the applicable permit and/or the reclamation plan, the city shall follow the procedures set forth in SMARA, §§ 2774.1 and 2774.s concerning violations and penalties, as well as those provisions of section 19.61.060 for revocation and/or abandonment of a conditional use permit which are not preempted by SMARA.

(Code 1972, § 19.66.140)

Sec. 19.66.150. - Reserved.

Sec. 19.66.160. - Fees.

The city shall establish such fees as it deems necessary to cover the reasonable costs incurred implements this chapter and the state regulations, including, but not limited to, processing of applications, annual reports, inspections, monitoring, enforcement and compliance.

(Code 1972, § 19.66.160)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Perris Municipal Code
Perris Municipal Code
  1. Title 1 — GENERAL PROVISIONS
  2. Chapter 2.03 — MAYOR
  3. Chapter 2.04 — CITY COUNCIL
  4. Chapter 2.05 — TERM LIMITS FOR ELECTED OFFICIALS
  5. Chapter 2.06 — CITY COUNCIL ELECTIONS BY DISTRICT
  6. Chapter 2.08 — CITY MANAGER
  7. Chapter 2.09 — CITY CLERK
  8. Chapter 2.10 — DIRECTOR OF FINANCE
  9. Chapter 2.12 — RESERVED
  10. Chapter 2.16 — SALARIES
  11. Chapter 2.20 — LAW ENFORCEMENT
  12. Chapter 2.24 — FIRE DEPARTMENT
  13. Chapter 2.28 — PUBLIC LIBRARY
  14. Chapter 2.30 — PUBLIC SAFETY COMMISSION
  15. Chapter 2.36 — PARK AND RECREATION COMMISSION
  16. Chapter 2.37 — PLANNING COMMISSION
  17. Chapter 2.40 — REDEVELOPMENT AGENCY
  18. Chapter 2.41 — INDUSTRIAL DEVELOPMENT AUTHORITY
  19. Chapter 2.44 — DISASTER RELIEF
  20. Chapter 2.50 — PERSONNEL POLICIES
  21. Chapter 2.52 — PUBLIC EMPLOYEES' RETIREMENT SYSTEM
  22. Chapter 2.56 — CANDIDATE FILING FEE
  23. Chapter 2.57 — GENERAL MUNICIPAL ELECTIONS
  24. Chapter 2.58 — ELECTRONIC FILING OF CAMPAIGN DISCLOSURE STATEM…
  25. Chapter 3.04 — RESERVED
  26. Chapter 3.08 — GAS TAX STREET IMPROVEMENT FUND
  27. Chapter 3.12 — TRANSFER OF CITY TAX FUNCTIONS
  28. Chapter 3.16 — SALES AND USE TAX
  29. Chapter 3.20 — REAL PROPERTY TRANSFER TAX
  30. Chapter 3.24 — TRANSIENT OCCUPANCY TAX
  31. Chapter 3.28 — RESERVED.
  32. Chapter 3.32 — PURCHASING SYSTEM
  33. Chapter 3.36 — HOME FINANCING PROGRAM
  34. Chapter 3.40 — MARIJUANA TAX
  35. Chapter 5.04 — BUSINESS LICENSES GENERALLY
  36. Chapter 5.06 — SOLICITORS
  37. Chapter 5.08 — EXEMPTIONS
  38. Chapter 5.12 — FEES FOR CERTAIN BUSINESSES AND OCCUPATIONS
  39. Chapter 5.14 — AMUSEMENT CENTER
  40. Chapter 5.16 — ADVERTISING ALONG FREEWAYS
  41. Chapter 5.17 — FOOD TRUCKS
  42. Chapter 5.18 — SIDEWALK VENDING
  43. Chapter 5.20 — AMBULANCE SERVICES
  44. Chapter 5.24 — HANDBILLS
  45. Chapter 5.28 — VEHICLES FOR HIRE AND TOW TRUCK SERVICE
  46. Chapter 5.32 — YARD SALES
  47. Chapter 5.36 — STATE LICENSES
  48. Chapter 5.38 — SHORT-TERM RENTALS
  49. Chapter 5.40 — USED GOODS DEALERS
  50. Chapter 5.44 — BINGO
  51. Chapter 5.46 — SWAP MEETS
  52. Chapter 5.48 — FORTUNETELLING, PALMISTRY, ETC.
  53. Chapter 5.49 — FILMING PERMITS
  54. Chapter 5.50 — ADULT-ORIENTED BUSINESSES
  55. Chapter 5.51 — TOBACCO LICENSING
  56. Chapter 5.54 — MEDICAL MARIJUANA DISPENSARY REGULATORY PROGRAM
  57. Chapter 5.58 — COMMERCIAL MARIJUANA OPERATIONS REGULATORY PROG…
  58. Chapter 5.60 — PUBLIC ART FEE
  59. Chapter 7.02 — PUBLIC NUISANCES
  60. Chapter 7.04 — NUISANCES
  61. Chapter 7.06 — PROPERTY MAINTENANCE
  62. Chapter 7.08 — ABATEMENT OF WEEDS AND RUBBISH
  63. Chapter 7.09 — CHARGE RATE FOR FIRE SERVICES
  64. Chapter 7.12 — FIREWORKS
  65. Chapter 7.14 — SMOKING REGULATIONS FOR CITY FACILITIES AND CIT…
  66. Chapter 7.16 — RUBBISH COLLECTION AND DISPOSAL
  67. Chapter 7.17 — SPECIFIC REGULATIONS FOR ORGANIC WASTE DISPOSAL…
  68. Chapter 7.18 — REGULATION OF FOOD ESTABLISHMENTS AND FOOD FACI…
  69. Chapter 7.20 — FOOD HANDLERS
  70. Chapter 7.22 — USE OF PARK AND RECREATION FACILITIES
  71. Chapter 7.24 — USE OF PUBLIC PROPERTY
  72. Chapter 7.26 — GRAFFITI; REMOVAL
  73. Chapter 7.28 — SHOPPING CARTS
  74. Chapter 7.30 — ABANDONED VEHICLES
  75. Chapter 7.32 — CONTROL OF FLIES
  76. Chapter 7.34 — NOISE CONTROL
  77. Chapter 7.36 — OFF-HIGHWAY VEHICLE OPERATION REGULATIONS
  78. Chapter 7.38 — VIOLATION; PENALTY
  79. Chapter 7.40 — TRANSPORTATION DEMAND MANAGEMENT
  80. Chapter 7.42 — LANDSCAPE MAINTENANCE
  81. Chapter 7.44 — CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
  82. Chapter 7.46 — DEFAULT BEVERAGES OFFERED IN CHILDREN'S MEALS
  83. Chapter 7.48 — PERSONAL MARIJUANA CULTIVATION
  84. Chapter 7.50 — HEALTHY OPTIONS AT CHECKOUT
  85. Chapter 7.52 — PROHIBITED CAMPING AND ENCAMPMENT REMOVAL PROCE…
  86. Chapter 7.54 — VECTOR CONTROL
  87. Title 8 — ANIMALS
  88. Chapter 8.01 — ANIMALS GENERALLY
  89. Chapter 8.02 — DOGS AND CATS
  90. Chapter 8.03 — ABANDONED, NEGLECTED AND CRUELLY TREATED ANIMALS
  91. Chapter 8.04 — POTENTIALLY DANGEROUS, DANGEROUS, AND VICIOUS A…
  92. Chapter 8.05 — NOISY ANIMALS
  93. Title 9 — PUBLIC PEACE, SAFETY AND MORALS
  94. Chapter 9.20 — DICE AND CARD GAMES
  95. Chapter 9.23 — BLINDER RACKS
  96. Chapter 9.28 — DISTURBING THE PEACE
  97. Chapter 9.32 — INTOXICATION
  98. Chapter 9.34 — CHARGE FOR POLICE RESPONSE TO LARGE PARTIES, GA…
  99. Chapter 9.40 — PUBLIC PROPERTY
  100. Chapter 9.42 — DISPOSITION OF UNCLAIMED PROPERTY
  101. Chapter 9.44 — ZERO TOLERANCE ZONES; VACANT HOMES; ARSON OR VA…
  102. Chapter 9.50 — CHARGE FOR PROCESSING OF TRUANT JUVENILES
  103. Chapter 9.51 — CONSUMPTION OF TOBACCO, ALCOHOL, ALCOHOLIC BEVE…
  104. Chapter 9.52 — TRUANCY OF MINORS
  105. Chapter 9.56 — DANGEROUS WEAPONS
  106. Chapter 9.60 — BURGLARY AND ROBBERY ALARM REGULATIONS
  107. Chapter 9.65 — AGGRESSIVE SOLICITATION
  108. Chapter 9.70 — UNLAWFUL POSSESSION OF A CATALYTIC CONVERTER
  109. Chapter 10.04 — DEFINITIONS
  110. Chapter 10.08 — ENFORCEMENT
  111. Chapter 10.12 — AUTHORITY OF POLICE
  112. Chapter 10.16 — TRAFFIC SIGNS AND SIGNALS
  113. Chapter 10.20 — DRIVING RULES
  114. Chapter 10.24 — STOPPING, STANDING, PARKING
  115. Chapter 10.25 — PARKING FOR PERSONS WITH DISABILITIES
  116. Chapter 10.28 — STOP OR YIELD INTERSECTIONS
  117. Chapter 10.36 — SPEED LIMITS
  118. Chapter 10.40 — TRUCK ROUTES
  119. Chapter 10.42 — PARKING RESTRICTIONS ON COMMERCIAL AND OTHER V…
  120. Chapter 10.44 — RESERVED
  121. Chapter 12.04 — STREET AND SIDEWALK GRADES
  122. Chapter 12.08 — CONSTRUCTION OF STREET IMPROVEMENTS
  123. Chapter 12.12 — EXCAVATIONS AND ENCROACHMENTS
  124. Chapter 12.16 — VIOLATION; PENALTY
  125. Chapter 13.04 — UNDERGROUND UTILITY INSTALLATIONS
  126. Chapter 13.12 — TELEVISION SYSTEMS
  127. Chapter 13.16 — VIOLATION; PENALTY
  128. Chapter 14.04 — WATER USE REGULATIONS
  129. Chapter 14.06 — RESERVED
  130. Chapter 14.08 — WATER RATES
  131. Chapter 14.10 — BACKFLOW AND CROSS-CONNECTION PREVENTION PROGRAM
  132. Chapter 14.12 — SEWAGE; DEFINITIONS
  133. Chapter 14.16 — SEWAGE DISPOSAL GENERAL REGULATIONS
  134. Chapter 14.20 — CONNECTIONS TO PUBLIC SEWER
  135. Chapter 14.22 — STORMWATER/URBAN RUNOFF MANAGEMENT AND DISCHAR…
  136. Chapter 14.24 — USE OF PUBLIC SEWERAGE SYSTEM
  137. Chapter 14.28 — CHARGES AND FEES
  138. Chapter 14.32 — SEWER CONSTRUCTION BY DEVELOPERS
  139. Chapter 14.36 — DESIGN CRITERIA FOR SEWER CONSTRUCTION
  140. Chapter 14.40 — ENFORCEMENT; DAMAGES
  141. Chapter 14.44 — VIOLATION; PENALTY
  142. Chapter 14.50 — WELL MONITORING, DRILLING AND ABANDONMENT STAN…
  143. Chapter 15.01 — PURPOSE AND METHODS
  144. Chapter 15.02 — DEFINITIONS
  145. Chapter 15.03 — GENERAL PROVISIONS
  146. Chapter 15.04 — ADMINISTRATION
  147. Chapter 15.05 — PROVISIONS FOR FLOOD HAZARD REDUCTION
  148. Chapter 15.06 — VARIANCE PROCEDURE
  149. Chapter 15.07 — ALLUVIAL FAN ADVISORY
  150. Chapter 16.04 — ENFORCEMENT OF BUILDING REGULATIONS
  151. Chapter 16.08 — BUILDING, PLUMBING AND OTHER CODES ADOPTED
  152. Article I — IN GENERAL
  153. Article II — MECHANICAL CODE
  154. Article III — PLUMBING CODE
  155. Article IV — OTHER TECHNICAL CODES
  156. Chapter 16.12 — UNSAFE BUILDINGS
  157. Chapter 16.16 — ADDITIONAL BUILDING REGULATIONS
  158. Chapter 16.20 — MOVING BUILDINGS
  159. Chapter 16.22 — CONSTRUCTION LOCATED NEAR ARTERIALS, RAILROADS…
  160. Chapter 16.24 — VIOLATION; PENALTY
  161. Chapter 16.25 — ELECTRIC VEHICLE CHARGING STATIONS
  162. Title 18 — SUBDIVISIONS
  163. Chapter 18.04 — GENERAL PROVISIONS
  164. Chapter 18.08 — SUBDIVISION REGULATIONS
  165. Chapter 18.09 — CONDOMINIUMS
  166. Chapter 18.12 — PROCEDURE
  167. Chapter 18.16 — PARCEL MAPS; PROCEDURE
  168. Chapter 18.18 — VESTING TENTATIVE MAPS
  169. Chapter 18.19 — DEVELOPMENT AGREEMENTS
  170. Chapter 18.20 — FINAL MAP REQUIREMENTS
  171. Chapter 18.21 — MERGER OF CONTIGUOUS LOTS
  172. Chapter 18.22 — LOT LINE ADJUSTMENTS
  173. Chapter 18.23 — PARCEL MAPS FOR URBAN LOT SPLITS
  174. Chapter 18.24 — DEDICATION AND IMPROVEMENTS
  175. Chapter 18.28 — IMPROVEMENT SECURITY
  176. Chapter 18.32 — RESERVATIONS AND FEES
  177. Chapter 18.36 — ADJUSTMENT PLATS
  178. Chapter 18.38 — CORRECTION AND AMENDMENT OF MAPS
  179. Chapter 18.40 — REVERSION TO ACREAGE
  180. Chapter 18.44 — ENFORCEMENT; PENALTY; CERTIFICATES OF COMPLIANCE
  181. Chapter 18.48 — VIOLATION; PENALTY
  182. Title 19 — ZONING
  183. Chapter 19.01 — AUTHORITY
  184. Chapter 19.02 — GENERAL PROVISIONS
  185. Chapter 19.08 — DEFINITIONS
  186. Chapter 19.20 — A-1 ZONE (LIGHT AGRICULTURAL/INTERIM DESIGNATI…
  187. Chapter 19.21 — R-20,000 SINGLE-FAMILY RESIDENTIAL 20,000 SQUA…
  188. Chapter 19.22 — R-10,000 SINGLE-FAMILY RESIDENTIAL 10,000 SQUA…
  189. Chapter 19.23 — R-8,400 SINGLE-FAMILY RESIDENTIAL 8,400 SQUARE…
  190. Chapter 19.24 — R-7,200 SINGLE-FAMILY RESIDENTIAL 7,200 SQUARE…
  191. Chapter 19.25 — R-6,000 SINGLE-FAMILY RESIDENTIAL 6,000 SQUARE…
  192. Chapter 19.26 — MFR-14 MULTI-FAMILY RESIDENTIAL 3,000 SQUARE F…
  193. Chapter 19.28 — MFR-22 MULTI-FAMILY RESIDENTIAL 1,950 SQUARE F…
  194. Chapter 19.29 — ACCESSORY BUILDINGS AND STRUCTURES FOR RESIDEN…
  195. Chapter 19.30 — SB 9 HOUSING DEVELOPMENTS AND URBAN LOT SPLITS
  196. Chapter 19.32 — R-4 DISTRICT (MOBILEHOME PARKS)
  197. Chapter 19.36 — CN ZONE (COMMERCIAL NEIGHBORHOOD)
  198. Chapter 19.38 — CC ZONE (COMMERCIAL COMMUNITY)
  199. Chapter 19.40 — DOWNTOWN DESIGN OVERLAY ZONE DISTRICT
  200. Chapter 19.43 — PO ZONE (PROFESSIONAL OFFICE)
  201. Chapter 19.44 — INDUSTRIAL ZONES
  202. Chapter 19.47 — OS ZONE (OPEN SPACE)
  203. Chapter 19.48 — P ZONE (PUBLIC/SEMI-PUBLIC FACILITIES/UTILITIES)
  204. Chapter 19.49 — ADOPTION PROCEDURE FOR SPECIFIC PLANS
  205. Chapter 19.50 — DEVELOPMENT PLAN REQUIREMENTS
  206. Chapter 19.51 — MARCH ARB/IP AIRPORT OVERLAY ZONE (MAOZ)
  207. Chapter 19.54 — AUTHORITY AND REVIEW PROCEDURES
  208. Chapter 19.55 — AMENDMENTS AND CHANGES OF DISTRICT BOUNDARIES
  209. Chapter 19.56 — PUBLIC HEARING PROCEDURES
  210. Chapter 19.57 — DENSITY BONUSES
  211. Chapter 19.58 — RECREATIONAL VEHICLE PARKS
  212. Chapter 19.59 — PLANNED DEVELOPMENT (PD) OVERLAY ZONE
  213. Chapter 19.60 — TEMPORARY ACTIVITIES AND USES
  214. Chapter 19.61 — CONDITIONAL USE PERMITS
  215. Chapter 19.62 — VARIANCES
  216. Chapter 19.63 — STREET NAMING REQUIREMENTS
  217. Chapter 19.65 — ALCOHOLIC BEVERAGE SALES REGULATIONS
  218. Chapter 19.66 — SURFACE MINING AND RECLAMATION PLAN REGULATIONS
  219. Chapter 19.68 — FEES
  220. Chapter 19.69 — PARKING AND LOADING STANDARDS
  221. Chapter 19.70 — LANDSCAPING
  222. Chapter 19.71 — URBAN FORESTRY ESTABLISHMENT AND CARE
  223. Chapter 19.72 — ENFORCEMENT, LEGAL PROCEDURE AND PENALTIES
  224. Chapter 19.74 — AGRICULTURAL PRESERVE PROCEDURES
  225. Chapter 19.75 — SIGN REGULATIONS
  226. Chapter 19.76 — BEVERAGE CONTAINER RECYCLING COLLECTION CENTERS
  227. Chapter 19.77 — BOARD OF ZONING ADJUSTMENT
  228. Chapter 19.78 — VIOLATION/PENALTY
  229. Chapter 19.80 — NONCONFORMING BUILDINGS AND USES
  230. Chapter 19.81 — ACCESSORY DWELLING UNITS AND JUNIOR ACCESSORY …
  231. Chapter 19.82 — DISTRICTS AND MAP
  232. Chapter 19.83 — CHILD CARE FACILITIES
  233. Chapter 19.84 — RESIDENTIAL CARE FACILITIES
  234. Chapter 19.85 — WIRELESS TELECOMMUNICATION FACILITIES
  235. Chapter 19.86 — SENIOR HOUSING OVERLAY ZONE (SHO)
  236. Chapter 19.87 — REASONABLE ACCOMMODATIONS IN HOUSING
  237. Chapter 19.88 — SHORT-TERM RENTALS PERMITTED
  238. Chapter 19.89 — HOUSING OPPORTUNITY AREAS—OVERLAY ZONE (HOAO)
  239. Chapter 19.92 — NO NET LOSS/DENSITY BONUS PROGRAM
  240. Chapter 20.01 — GENERAL PROVISIONS
  241. Chapter 7 — A of the 2013 California Building Code, Materials …
  242. Chapter 20.02 — ADMINISTRATION
  243. Chapter 20.03 — LIQUEFIED PETROLEUM GASES
  244. Chapter 20.04 — CERTAIN ACTIVITIES PROHIBITED
  245. Chapter 20.06 — PENALTY FOR VIOLATION
  246. Chapter 21.01 — GENERAL PROVISIONS
  247. Chapter 21.02 — JUST CAUSE REQUIREMENTS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.