§ 6.14.101. Definitions.

  • A. "Applicant" means any individual, firm, limited liability company, association, partnership, political subdivision, government agency, municipality, industry, public or private corporation, or any other entity whatsoever who applies to the city for the applicable permits to undertake any construction, demolition, or renovation project within the city, unless otherwise specifically exempted by law.

  • B. "Compliance official" means the public works director or his/her designee.

  • C. "Construction" means the building of any structure or any portion thereof including any tenant improvements to an existing facility or structure.

  • D. "Construction and demolition debris" means used or discarded materials removed from premises during construction or renovation of a structure resulting from construction, remodeling, repair, or demolition operations on any pavement, house, commercial building, or other structure.

  • E. "Conversion rate" means the rate set forth in the standardized conversion rate table approved by the city pursuant to this chapter for use in estimating the volume or weight of materials identified in a waste management plan (WMP).

  • F. "Covered project" shall have the meaning set forth in Section 6.14.102(A).

  • G. "Deconstruction" means the systematic removal of usage items from a structure.

  • H. "Demolition" means the decimating, razing, ruining, tearing down or wrecking of any facility, structure, pavement or building, whether in whole or in part, whether interior or exterior.

  • I. "Divert" means to use material for any purpose other than disposal in a landfill.

  • J. "Diversion requirement" means adherence to the most current diversion rate in accordance with the most updated state requirements by weight of the total construction and demolition debris generated by a project via reuse or recycling, unless the applicant has been granted an infeasible exemption pursuant to Section 6.14.106, in which case the diversion requirement shall be the maximum feasible diversion rate established by the solid waste manager for the project.

  • K. "Noncovered project" shall have the meaning set forth in Section 6.14.102(C).

  • L. "Project" means any activity which requires an application for a building or demolition permit or any similar permit from the city.

  • M. "Renovation" means any change, addition, or modification in an existing structure.

  • N. "Reuse" means further or repeated use of construction or demolition debris.

  • O. "Salvage" means the controlled removal of construction or demolition debris from a permitted building or demolition site for the purpose of recycling, reuse or storage for later recycling or reuse.

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

PATTERSON CODE

§ 6.14.101

§ 6.14.103

  • P. "Waste management plan (WMP)" means a completed waste management plan (WMP) form, approved by the city for the purpose of compliance with this chapter, submitted by the applicant for any covered or noncovered project.

  • (Ord. 775 § 1 (part), 2015; Ord. 818 (part), 2019)

§ 6.14.102. Threshold for covered projects.

  • A. Covered Projects. All construction and renovation projects within the city, which meet the California Green Building Standard requirements, shall comply with this chapter. The cost of the project shall be the valuation ascribed to the project by the building official. In addition, all demolition projects having a total footage of more than one thousand square feet shall be a covered project. Failure to comply with any of the terms of this chapter shall subject the project applicant to the full range of enforcement mechanisms set forth in Sections 6.14.105(C)(3) and 6.14.108.

  • B. City-Sponsored Projects. All city-sponsored construction and renovation projects within the city, the costs of which are, or are projected to be, greater than or equal to one hundred thousand dollars ("covered projects"), shall comply with this chapter. The cost of the project shall be the valuation attributed to the permit issued by the building department. In addition, all demolition projects having a total square footage of more than one thousand square feet shall be a covered project. These city-sponsored covered projects shall submit a waste management plan to the solid waste manager prior to beginning any construction or demolition activities and shall be subject to all applicable provisions of this chapter with the exception of Section 6.14.105(C)(3).

  • C. Noncovered Projects. Applicants for construction, demolition, and renovation projects within the city whose permit valuations meet the California Green Building Standard requirements ("noncovered projects") shall be encouraged to divert at least the minimum required percentage set out by the California Green Building Code.

  • D. Compliance as a Condition of Approval. Compliance with the provisions of this chapter shall be listed as a condition of approval on any building or demolition permit issued for a covered project.

  • (Ord. 775 § 1 (part), 2015; Ord. 818 (part), 2019)

§ 6.14.103. Submission of waste management plan.

  • A. Waste Management Plan Forms. Applicants for building or demolition permits involving any covered project shall complete and submit a waste management plan on a WMP form approved by the city for this purpose as part of the application packet for the building or demolition permit. The completed WMP shall indicate all of the following:

    1. The estimated volume or weight of project construction and demolition debris, by materials type, to be generated;

    2. The maximum volume or weight of such materials that can feasibly be diverted via reuse or recycling;

    3. The vendor or facility that the applicant proposes to use to collect or receive that material; and

    4. The estimated volume or weight of construction and demolition debris that will be

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

HEALTH AND SAFETY

§ 6.14.103

§ 6.14.105

landfilled.

  • B. Calculating Volume and Weight of Debris. In estimating the volume or weight of materials identified in the WMP, the applicant shall use the standardized conversion rates approved by the city for this purpose.

  • C. Deconstruction. In preparing the WMP, applicants for building or demolition permits involving the removal of all or part of an existing structure shall deconstruct, to the maximum extent feasible, and shall make the materials generated thereby available for salvage.

  • (Ord. 775 § 1 (part), 2015; Ord. 818 (part), 2019)

§ 6.14.104. Review of waste management plan.

  • A. Approval. Notwithstanding any other provision of this code, no building or demolition permit shall be issued for any covered project unless and until the solid waste manager has approved the WMP. Approval shall not be required, however, where an emergency demolition is required to protect the public health, welfare or safety as determined by the chief building official. The solid waste manager shall only approve a WMP if he or she first determines that both of the following conditions have been met:

    1. The WMP provides all of the information set forth in Section 6.14.103(A); and

    2. The WMP indicates that at least fifty percent by weight of all construction and demolition debris generated by the project will be diverted.

If the solid waste manager determines that these conditions have been met, he or she shall mark the WMP "Approved," return a copy of the WMP to the applicant, and notify the building department that the WMP has been approved.

  • B. Nonapproval. If the solid waste manager determines that the WMP is incomplete or fails to indicate that at least fifty percent by weight of all construction and demolition debris generated by the project will be reused or recycled, he or she shall either:

    1. Return the WMP to the applicant marked "Denied," including a statement of reasons, and so notify the building department; or
  1. Return the WMP to the applicant marked "Further Explanation Required."

(Ord. 775 § 1 (part), 2015; Ord. 818 (part), 2019)

§ 6.14.105. Compliance with waste management plan.

  • A. Documentation. Prior to receiving a certificate of occupancy for the project, the applicant shall submit to the solid waste manager documentation that the diversion requirement for the project has been met. The diversion requirement shall be that the applicant has diverted the percentage of the total construction and demolition debris generated by the project via reuse or recycling that has been specified and required by the state of California, unless the applicant has been granted an infeasible exemption pursuant to Section 6.14.106, in which case the diversion requirement shall be the maximum feasible diversion rate established by the solid waste manager for the project. This documentation shall include all of the following:

    1. Receipts from the vendor or facility which collected or received each material

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA § 6.14.105

PATTERSON CODE

§ 6.14.106

showing the actual weight or volume of that material;

  1. A copy of the previously approved WMP for the project adding the actual volume or weight of each material diverted and landfilled;

  2. Any additional information the applicant believes is relevant to determining its efforts to comply in good faith with this chapter.

  • B. Weighing of Wastes. Applicants shall make reasonable efforts to ensure that all construction and demolition debris diverted or landfilled is measured and recorded using the most accurate method of measurement available. To the extent practical, all construction and demolition debris shall be weighed by measurement on scales. Such scales shall be in compliance with all regulatory requirements for accuracy and maintenance. For construction and demolition debris for which weighing is not practical due to small size or other considerations, a volumetric measurement shall be used. For conversion of volumetric measurements to weight, the applicant shall use the standardized conversion rates approved by the city for this purpose.

  • C. Determination of Compliance. The solid waste manager shall review the information submitted under subsection A of this section and determine whether the applicant has complied with the diversion requirement, as follows:

    1. Full Compliance. If the solid waste manager determines that the applicant has fully complied with the diversion requirements applicable to the project, he or she shall approve the WMP and inform the building division that a certificate of occupancy can be issued.
  1. Substantial Compliance. If the solid waste manager determines that the diversion requirement has not been achieved, he or she shall determine on a case-by-case basis whether the applicant has made a good faith effort and is in substantial compliance with this chapter. In making this determination, the solid waste manager shall consider the availability of markets for the construction and demolition debris landfilled, the size of the project, and the documented efforts of the applicant to divert construction and demolition debris. If the solid waste manager determines that the applicant has made a good faith effort to comply with this chapter and is in substantial compliance, he or she shall approve the WMP and inform the building division that a certificate of occupancy can be issued.

    1. Noncompliance. If the solid waste manager determines that the applicant is not in substantial compliance with this chapter, or if the applicant fails to submit the documentation required by subsection A of this section, then the applicant shall pay a civil penalty as prescribed in Section 6.14.108.
  • D. Falsification of Records. If the applicant deliberately provides false or misleading data to the city in violation of this chapter, the applicant may be subject to penalties in addition to those specified in Section 6.14.108. In any civil enforcement action, administrative or judicial, the city shall be entitled to recover its attorneys' fees and costs from an applicant who is determined by a court of competent jurisdiction to have violated this chapter.

  • E. Final Approval. All conditions of this chapter shall be met prior to final approval by the building division.

  • (Ord. 775 § 1 (part), 2015; Ord. 818 (part), 2019)

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

HEALTH AND SAFETY

§ 6.14.106

§ 6.14.107

§ 6.14.106. Infeasible exemption.

  • A. Application. If an applicant for a covered project experiences unique circumstances that the applicant believes make it infeasible to comply with the diversion requirement, the applicant may apply for an exemption at the time that he or she submits the WMP required under Section 6.14.103(A). The applicant shall indicate on the WMP the maximum rate of diversion he or she believes is feasible for each material and the specific circumstances that he or she believes make it infeasible to comply with the diversion requirement.

  • B. Meeting with Solid Waste Manager. The solid waste manager shall review the information supplied by the applicant and may meet with the applicant to discuss possible ways of meeting the diversion requirement. The solid waste manager may request that staff from the Stanislaus County regional solid waste planning agency or designee attend this meeting or may require the applicant to request a separate meeting with Stanislaus County regional solid waste planning agency staff. Based on the information supplied by the applicant and, if applicable, Stanislaus County regional solid waste planning agency staff or designee, the solid waste manager shall determine whether it is possible for the applicant to meet the diversion requirement.

  • C. Granting of Exemption. If the solid waste manager determines that it is infeasible for the applicant to meet the diversion requirement due to unique circumstances, he or she shall determine the maximum feasible diversion rate for each material and shall indicate this rate on the WMP submitted by the applicant. The solid waste manager shall return a copy of the WMP to the applicant marked "Approved for Infeasible Exemption" and shall notify the building division that the WMP has been approved.

  • D. Denial of Exemption. If the solid waste manager determines that it is possible for the applicant to meet the diversion requirement, he or she shall so inform the applicant in writing. The applicant shall have thirty days to resubmit a WMP form in full compliance with Section 6.14.103(A). If the applicant fails to resubmit the WMP, or if the resubmitted WMP does not comply with Section 6.14.103(A), the solid waste manager shall deny the WMP in accordance with Section 6.14.104(B).

  • (Ord. 775 § 1 (part), 2015; Ord. 818 (part), 2019)

§ 6.14.107. Appeals.

  • A. Contents of Appeals. An appeal of the solid waste manager's decision may be made to the city manager in writing not longer than ten days after the solid waste manager's decision. The decision of the city manager shall be final. The appellant must specifically state in the notice of appeal:

    1. The name and address of the appellant and appellant's interest in the decision;

    2. The nature of the decision appealed from and/or the conditions appealed from;

    3. A clear, complete, but brief statement of the reasons why, in the opinion of the appellant, the decision or the conditions imposed were unjustified or inappropriate; and

    4. The specific facts of the matter in sufficient detail to notify the city. The appeal shall not be stated in generalities.

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

PATTERSON CODE

§ 6.14.107

§ 6.14.108

  • B. Acceptance of Appeal. An appeal shall not be accepted by the city manager unless it is complete.

  • (Ord. 775 § 1 (part), 2015; Ord. 818 (part), 2019)

§ 6.14.108. Civil penalties.

  • A. Civil Penalty. If the solid waste manager, or, upon appeal, the city manager, determines that an applicant is in noncompliance as described in Section 6.14.105(C)(3), the applicant shall pay a civil penalty in the amount calculated as two percent of the total project valuation. Until the civil penalty is paid, a certificate of occupancy may be withheld by the building division.

  • B. Enforcement. The city attorney is authorized to bring a civil action in any court of competent jurisdiction to recover such civil penalties for the city of Patterson.

  • (Ord. 775 § 1 (part), 2015; Ord. 818 (part), 2019)

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

HEALTH AND SAFETY

§ 6.15.010

§ 6.15.020

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Patterson Municipal Code
Patterson Municipal Code
  1. Title 1
  2. Title 2
  3. Chapter 2.34 — DISPOSAL OF UNCLAIMED PROPERTY
  4. Chapter 2.04 — CITY OFFICE
  5. Chapter 2.08 — CITY COUNCIL MEETINGS
  6. Chapter 2.10 — COUNCIL MEMBER ELECTIONS BY DISTRICT
  7. Chapter 2.12 — COMPENSATION OF CITY OFFICIALS
  8. Chapter 2.14 — CITY ATTORNEY
  9. Chapter 2.16 — CITY MANAGER
  10. Chapter 2.18 — FINANCE DIRECTOR
  11. Chapter 2.20 — SUPERINTENDENT OF STREETS
  12. Chapter 2.22 — POLICE DEPARTMENT
  13. Chapter 2.24 — FIRE DEPARTMENT
  14. Chapter 2.28 — LAW ENFORCEMENT OFFICER TRAINING
  15. Chapter 2.34 — DISPOSAL OF UNCLAIMED PROPERTY
  16. Chapter 2.36 — EMERGENCY SERVICES
  17. Chapter 2.40 — PLANNING COMMISSION
  18. Chapter 2.44 — INDUSTRIAL DEVELOPMENT AUTHORITY
  19. Chapter 2.48 — ECONOMIC STRATEGIC COMMISSION
  20. Chapter 2.50
  21. Chapter 2.52 — PARKS AND RECREATION COMMISSION
  22. Chapter 2.54 — BEAUTIFICATION COMMITTEE
  23. Chapter 2.60 — REDEVELOPMENT AGENCY AND PLAN
  24. Chapter 2.70 — SENIOR COMMISSION
  25. Title 3
  26. Chapter 3.12 — FUNDS
  27. Chapter 3.16
  28. Chapter 3.20 — SALES AND USE TAX
  29. Chapter 3.24 — REAL PROPERTY TRANSFER TAX
  30. Chapter 3.28 — GENERAL GOVERNMENT IMPACT FEE
  31. Chapter 3.40
  32. Chapter 3.44 — CLAIMS PROCEDURES
  33. Chapter 3.48 — COMMUNITY FACILITIES IMPACT FEE
  34. Chapter 3.52 — PUBLIC SAFETY IMPACT FEE
  35. Chapter 3.56 — GENERAL PLAN REIMBURSEMENT FEE
  36. Chapter 3.64 — NEW DEVELOPMENT IMPACT FEES
  37. Chapter 3.68 — TRANSIENT OCCUPANCY TAX
  38. Chapter 3.70
  39. Title 5
  40. Chapter 5.04 — BUSINESS LICENSES GENERALLY
  41. Chapter 5.08 — PEDDLERS AND SOLICITORS
  42. Chapter 5.09 — MASSAGE ESTABLISHMENTS
  43. Chapter 5.10
  44. Chapter 5.11 — GARAGE SALES
  45. Chapter 5.12 — TAXICABS—VEHICLES FOR HIRE
  46. Chapter 5.14 — CANNABIS BUSINESS TAX[2 ]
  47. Chapter 5.16 — TELEVISION ANTENNA ERECTION
  48. Chapter 5.20 — POOL AND BILLIARDS—CARD ROOMS
  49. Chapter 5.24 — INTOXICATING LIQUORS
  50. Chapter 5.30 — BINGO GAMES
  51. Chapter 5.38
  52. Chapter 5.40 — ALARM RESPONSE
  53. Chapter 5.44 — JUNK DEALERS AND SCRAP METAL RECYCLERS
  54. Title 6
  55. Chapter 6.04 — RESTAURANTS
  56. Chapter 6.08 — MILK AND MILK PRODUCTS
  57. Chapter 6.10 — SMOKING POLLUTION CONTROL
  58. Chapter 6.12 — GARBAGE REMOVAL
  59. Chapter 6.13 — CURBSIDE RECYCLING PROGRAM
  60. Chapter 6.14 — CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING PR…
  61. Chapter 6.15
  62. Chapter 6.16 — PROPERTY MAINTENANCE
  63. Chapter 6.18 — NEGLECTED VACANT STRUCTURES
  64. Chapter 6.20 — MISTLETOE ABATEMENT
  65. Chapter 6.24
  66. Chapter 6.28 — FIREWORKS SALES AND DISCHARGE
  67. Chapter 6.29
  68. Chapter 6.32 — TRAILERS
  69. Chapter 6.36 — DRUG PARAPHERNALIA
  70. Chapter 6.40 — HAZARDOUS MATERIALS
  71. Chapter 6.48 — RIGHT TO FARM
  72. Chapter 6.50 — GRAFFITI
  73. Chapter 6.52 — MEDICAL MARIJUANA DISPENSARIES (Repealed by Ord…
  74. Chapter 6.53 — REGULATING SMOKING AND TOBACCO PRODUCT USE IN C…
  75. Chapter 6.56 — CANNABIS BUSINESS PROGRAM
  76. Chapter 6.57
  77. Chapter 6.58 — CANNABIS CAMPUS PILOT PROGRAM
  78. Title 7
  79. Chapter 7.58 — ANIMALS IN RESIDENTIAL AREAS
  80. Chapter 7.04 — GENERAL PROVISIONS
  81. Chapter 7.14
  82. Chapter 7.16
  83. Chapter 7.28 — DANGEROUS ANIMALS
  84. Chapter 7.36 — RABIES CONTROL
  85. Chapter 7.44 — DEAD OR ABANDONED ANIMALS
  86. Chapter 7.48 — VIOLATION—PENALTY
  87. Chapter 7.50 — ANIMAL SERVICE FEES
  88. Chapter 7.54 — BREEDING AND TRANSFERRING OF DOGS AND CATS, AND…
  89. Chapter 7.58 — ANIMALS IN RESIDENTIAL AREAS
  90. Title 9
  91. Chapter 9.04 — FIRE HYDRANTS
  92. Chapter 9.08 — USE OF WATER DURING FIRES
  93. Chapter 9.12 — POLICE DOGS
  94. Chapter 9.14 — STREET GANGS
  95. Chapter 9.16 — GAMBLING
  96. Chapter 9.18 — INDECENT EXPOSURE
  97. Chapter 9.20 — ADULT-RELATED ESTABLISHMENTS
  98. Article II
  99. Article III
  100. Article IV — Miscellaneous Provisions
  101. Chapter 9.24 — BILL POSTING AND PAINTING ON PROPERTY
  102. Chapter 9.26 — SHOPPING CART REGULATIONS
  103. Chapter 9.27 — UNATTENDED COLLECTION BIN PERMIT
  104. Chapter 9.28 — FORTUNETELLING
  105. Chapter 9.32 — MINOR'S CURFEW
  106. Chapter 9.34 — DISPLAY OF ADULT MATTER TO MINORS
  107. Chapter 9.35
  108. Chapter 9.36 — WEAPONS
  109. Chapter 9.40 — FIREARMS POSSESSION AND FIRING
  110. Chapter 9.43 — HEALTH AND HYGIENE
  111. Chapter 9.50 — CAMPING WITHIN CITY LIMITS
  112. Chapter 9.54
  113. Chapter 9.55 — SEX OFFENDER RESIDENCY RESTRICTIONS
  114. Title 10
  115. Chapter 10.04 — GENERAL TRAFFIC REGULATIONS—PENALTIES
  116. Chapter 10.06 — GENERAL PARKING RESTRICTIONS
  117. Chapter 10.12 — PARKING, STOPPING AND STANDING
  118. Chapter 10.16 — PARKING AREAS OF CITY
  119. Chapter 10.20 — LOADING AND UNLOADING—ALLEYS—BUS AND TAXI STOPS
  120. Chapter 10.22 — OVERSIZED VEHICLES
  121. Chapter 10.24 — ABANDONED VEHICLES
  122. Chapter 10.28
  123. Article I — Licensing And Sale
  124. Chapter 10.32 — TRUCK ROUTES
  125. Chapter 10.34 — INTERSTATE TRUCK TERMINALS AND ROUTES
  126. Chapter 10.36 — TRAINS BLOCKING STREETS
  127. Chapter 10.40 — SPEED LIMITS
  128. Chapter 10.42 — FUNERAL PROCESSIONS
  129. Title 12
  130. Chapter 12.04 — EXCAVATIONS
  131. Chapter 12.06 — STREET TRENCH CUT COST RECOVERY FEE
  132. Chapter 12.08 — OBSTRUCTIONS TO STREETS
  133. Chapter 12.12 — SIDEWALK AND CURB CONSTRUCTION[1 ]
  134. Chapter 12.14
  135. Chapter 12.16 — TREES
  136. Chapter 12.20 — ENCROACHMENT REGULATIONS
  137. Chapter 12.24 — PARK REGULATIONS
  138. Chapter 12.30 — SKATE PARK FACILITY
  139. Title 13
  140. Chapter 13.02 — SANITARY CODE
  141. Article XI — Miscellaneous Provisions
  142. Article XI — Miscellaneous Provisions
  143. Chapter 13.04 — SEWER EXTENSIONS
  144. Chapter 13.08 — OUTSIDE SEWER CONNECTIONS
  145. Chapter 13.24 — WATER SYSTEM
  146. Chapter 13.28
  147. Title 15
  148. Chapter 15.04 — CALIFORNIA BUILDING CODE
  149. Chapter 15.08 — FIRE HAZARD SEVERITY ZONES
  150. Chapter 15.20 — CALIFORNIA FIRE CODE
  151. Chapter 15.24 — MOVING BUILDINGS
  152. Chapter 15.04 — CALIFORNIA BUILDING CODE
  153. Chapter 15.06 — CALIFORNIA ENERGY CODE[1 ]
  154. Chapter 15.08 — FIRE HAZARD SEVERITY ZONES[2 ]
  155. Chapter 15.12 — PLUMBING CODE (Repealed by Ord. 798)
  156. Chapter 15.14 — CALIFORNIA PLUMBING CODE
  157. Division II — Organization and Enforcement
  158. Chapter 15.18 — CALIFORNIA ELECTRICAL CODE
  159. Chapter 15.20 — CALIFORNIA FIRE CODE
  160. Chapter 15.22 — ELEVATOR SAFETY CODE (Repealed by Ord. 798)
  161. Chapter 15.24 — MOVING BUILDINGS
  162. Chapter 15.26
  163. Chapter 15.28 — SWIMMING POOLS (Repealed by Ord. 798)
  164. Chapter 15.30 — SWIMMING POOL, SPA AND HOT TUB CODE
  165. Chapter 15.32 — SIGNS AND SIGN STRUCTURES
  166. Chapter 15.36 — HOUSING CODE
  167. Chapter 1 — TITLE AND SCOPE
  168. Chapter 2 — ENFORCEMENT
  169. Chapter 3 — PERMITS AND INSPECTIONS
  170. Chapter 4 — DEFINITIONS
  171. Chapter 5 — SPACE AND OCCUPANCY STANDARDS
  172. Chapter 6 — STRUCTURAL REQUIREMENTS
  173. Chapter 7 — MECHANICAL AND ELECTRICAL REQUIREMENTS
  174. Chapter 8 — EXITS
  175. Chapter 9 — FIRE PROTECTION
  176. Chapter 10 — SUBSTANDARD BUILDINGS
  177. Chapter 11 — NOTICES AND ORDERS OF BUILDING OFFICIAL
  178. Chapter 12 — APPEAL
  179. Chapter 15.38 — HISTORICAL BUILDING CODE
  180. Chapter 15.39 — CALIFORNIA EXISTING BUILDING CODE
  181. Chapter 15.42 — CALIFORNIA MECHANICAL CODE
  182. Part II — Organization and Enforcement
  183. Chapter 15.44 — DANGEROUS BUILDINGS CODE
  184. Chapter 1 — TITLE AND SCOPE
  185. Chapter 2 — ENFORCEMENT
  186. Chapter 3 — DEFINITIONS
  187. Chapter 4 — NOTICES AND ORDERS OF BUILDING OFFICIAL
  188. Chapter 5 — APPEAL
  189. Chapter 15.46 — CALIFORNIA RESIDENTIAL CODE
  190. Division II — ADMINISTRATION
  191. Chapter 15.48 — WATER-EFFICIENT LANDSCAPE
  192. Chapter 15.50
  193. Chapter 15.52 — UNIFORM ADMINISTRATIVE CODE
  194. Chapter 15.54 — CALIFORNIA ADMINISTRATIVE CODE
  195. Chapter 15.56 — CALIFORNIA REFERENCE STANDARD CODE
  196. Chapter 15.58 — ADA STANDARDS FOR ACCESSIBLE DESIGN
  197. Chapter 15.59
  198. Chapter 15.60
  199. Title 16
  200. Chapter 16.44 — DEDICATION—PARK AND RECREATION
  201. Chapter 16.38 — DEDICATIONS AND IMPROVEMENTS GENERALLY
  202. Chapter 16.50 — AGRICULTURAL MITIGATION POLICY
  203. Chapter 16.72 — ENVIRONMENTAL IMPACT, AND GRADING AND EROSION …
  204. Chapter 16.04 — CITATION, AUTHORITY AND PURPOSE
  205. Chapter 16.12 — GENERAL PROVISIONS
  206. Chapter 16.20
  207. Chapter 16.24 — TENTATIVE PARCEL MAPS
  208. Chapter 16.28 — TENTATIVE SUBDIVISION MAPS
  209. Chapter 16.32 — ACTION ON TENTATIVE MAP
  210. Chapter 16.36 — FINAL MAP
  211. Chapter 16.38 — DEDICATIONS AND IMPROVEMENTS GENERALLY
  212. Chapter 16.40
  213. Chapter 16.42 — IMPROVEMENT SECURITY
  214. Chapter 16.44 — DEDICATION—PARK AND RECREATION
  215. Chapter 16.48 — DEDICATION—SCHOOL SITE
  216. Chapter 16.50
  217. Chapter 16.52
  218. Chapter 16.60 — MONUMENTS
  219. Chapter 16.64 — DRAINAGE, SEWER AND WATER FACILITIES
  220. Chapter 16.68 — SOIL REPORTS
  221. Chapter 16.72
  222. Chapter 16.74 — LOT LINE ADJUSTMENT
  223. Chapter 16.76 — REVERSION TO ACREAGE
  224. Chapter 16.77 — MERGER OF SUBSTANDARD LOTS
  225. Chapter 16.88 — APPEALS
  226. Chapter 16.92 — PLANNING COMMISSION
  227. Chapter 16.96 — VIOLATIONS—PENALTY
  228. Chapter 16.100 — VESTING TENTATIVE MAP
  229. Title 17
  230. Chapter 17.04 — GENERAL PROVISIONS
  231. Chapter 17.08 — DEFINITIONS
  232. Chapter 17.12 — PROVISIONS FOR FLOOD HAZARD REDUCTION
  233. Chapter 17.16 — ADMINISTRATION
  234. Title 18
  235. Chapter 18.02 — PURPOSE AND APPLICABILITY
  236. Chapter 18.16 — PLANNING DIRECTOR DECISIONS
  237. Chapter 18.12 — LAND USE AND DEVELOPMENT APPROVAL
  238. Chapter 18.58 — EMERGENCY SHELTER OVERLAY ZONE
  239. Division IV — SITE DEVELOPMENT
  240. Chapter 18.70 — FENCES, WALLS, AND SCREENING
  241. Chapter 18.80 — LIGHTING
  242. Chapter 18.88 — DENSITY BONUS AND AFFORDABLE HOUSING INCENTIVES
  243. Chapter 18.84 — WIRELESS COMMUNICATIONS
  244. Division V — DEFINITIONS
  245. Chapter 18.02 — PURPOSE AND APPLICABILITY
  246. Chapter 18.04 — ADMINISTRATIVE RESPONSIBILITY
  247. Chapter 18.06 — RULES AND INTERPRETATION
  248. Chapter 18.08 — ENFORCEMENT
  249. Chapter 18.12 — LAND USE AND DEVELOPMENT APPROVAL
  250. Chapter 18.14 — GENERAL APPLICATION PROCESSING
  251. Chapter 18.16 — PLANNING DIRECTOR DECISIONS
  252. Chapter 18.18 — PLANNING COMMISSION DECISIONS
  253. Chapter 18.20 — CITY COUNCIL DECISIONS
  254. Chapter 18.30 — ESTABLISHMENT OF ZONING DISTRICTS
  255. Chapter 18.34 — LAND USE CLASSIFICATION
  256. Chapter 18.38 — RESIDENTIAL DISTRICTS
  257. Chapter 18.42 — COMMERCIAL AND MEDICAL/PROFESSIONAL OFFICE DIS…
  258. Chapter 18.46 — INDUSTRIAL DISTRICTS
  259. Chapter 18.50 — PUBLIC/QUASI-PUBLIC AND PARKS AND RECREATION D…
  260. Chapter 18.54 — OVERLAY DISTRICTS
  261. Chapter 18.58 — EMERGENCY SHELTER OVERLAY ZONE
  262. Chapter 18.60 — GENERAL DEVELOPMENT STANDARDS
  263. Chapter 18.62 — ACCESSORY STRUCTURES
  264. Chapter 18.63 — CHILD CARE PROVISIONS
  265. Chapter 18.64 — HOME OCCUPATIONS
  266. Chapter 18.66 — SECOND UNITS
  267. Chapter 18.68 — LIVE/WORK UNITS
  268. Chapter 18.70 — FENCES, WALLS, AND SCREENING
  269. Chapter 18.72 — OUTDOOR SALES, STORAGE AND SEATING
  270. Chapter 18.73 — PUBLIC ART
  271. Chapter 18.74 — INTEGRATED DEVELOPMENT
  272. Chapter 18.76 — PARKING AND LOADING
  273. Chapter 18.78 — LANDSCAPING
  274. Chapter 18.80 — LIGHTING
  275. Chapter 18.82 — SIGNS
  276. Chapter 18.84 — WIRELESS COMMUNICATIONS
  277. Chapter 18.86 — INCLUSIONARY HOUSING
  278. Chapter 18.88 — DENSITY BONUS AND AFFORDABLE HOUSING INCENTIVES
  279. Chapter 18.89 — REASONABLE ACCOMMODATION
  280. Chapter 18.90 — TEMPORARY USES
  281. Chapter 18.92 — DRUG OR ALCOHOL ABUSE TREATMENT FACILITIES
  282. Chapter 18.94 — NONCONFORMING USES AND STRUCTURES
  283. Chapter 18.95
  284. Chapter 18.96 — LAND USE DEFINITIONS
  285. Chapter 18.98 — GENERAL DEFINITIONS
  286. Title SR
  287. § SR-2. Administration and Personnel.
  288. § SR-3. Revenue and Finance.
  289. § SR-4. Business Licenses, Taxes and Regulations.
  290. § SR-5. Animals.
  291. § SR-6. Health and Safety.
  292. § SR-7. Public Peace, Morals and Welfare.
  293. § SR-8. Vehicles and Traffic.
  294. § SR-9. Streets, Sidewalks and Public Places.
  295. § SR-10. Public Services.
  296. § SR-11. Buildings and Construction.
  297. § SR-12. Subdivisions.
  298. § SR-14. Environment.
  299. Title OL

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.