Skip to content

Chapter 12.06 — STREET TRENCH CUT COST RECOVERY FEE

Patterson Municipal Code · 2026-07 edition · updated 2026-09-27 · Patterson

§ 12.06.010. Title.

This chapter shall be known as the "street trench cut cost recovery fee ordinance." (Ord. 840, 2020)

§ 12.06.020. Definitions.

"Applicant" shall mean any owner or duly authorized agent of such owner, who has submitted an application for a permit to excavate.

"Chapter" shall mean this chapter of the city of Patterson Municipal Code.

"City" shall mean the city of Patterson.

"City engineer" shall mean director of engineering or his/her designee.

"City street" shall mean any public right-of-way which has been accepted, or is hereafter accepted by the city council into the city road system pursuant to Section 941 of the California Streets and Highways Code.

"Council" shall mean the city council of the city of Patterson.

"Department" shall mean the department of public works.

"Director" shall mean the director of public works or his/her designee.

"Excavation" shall mean any opening in the surface or subsurface of the public right-of-way.

"Facility" or "facilities" shall mean any and all cables, cabinets, ducts, conduits, converters, equipment, drains, handholds, manholes, pipes, pipelines, splice boxes, surface location markers, tunnels, utilities, vaults, and other appurtenances or tangible things owned, leased, operated, or licensed by an owner or person, that are located or are proposed to be located in the public rightof-way.

"Owner" shall mean any person, including any agency, department, or subdivision of the city, who owns any facility or facilities that are or are proposed to be installed or maintained in the public right-of-way.

"Permit" or "permit to excavate" shall mean a permit to perform an excavation as it has been approved or may be amended or renewed by the department.

"Person" shall mean any natural person, corporation, partnership, or any governmental agency, including any agency, department, or subdivision of the county, the state of California, or the United States of America.

"Public right-of-way" shall mean the area across, along, beneath, in, on, over, under, upon, and within the dedicated public alleys, boulevards, courts, lanes, places, roads, sidewalks, streets, and ways within the city, as they now exist or hereafter will exist and which are or will be under the permitting jurisdiction of the department of public works.

"Seal coat" means a nonstructural road surface treatment designed to increase pavement life, such as a chip seal or a slurry seal.

"Square foot trench repair reimbursement fee" is a fee, the amount of which shall be set forth in the public works service or engineering fees schedule, as amended, determined based on similar

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

STREETS AND OTHER PUBLIC PLACES

§ 12.06.020

§ 12.06.060

fees charged by other public agencies.

"Structural improvements" means major road surface improvements such as road reconstruction or overlays.

"Trench influence area" shall mean an area three and one-half feet adjacent to the edge of the trench where the excavation occurs.

(Ord. 840, 2020)

§ 12.06.030. Purpose of trench cut cost recovery fee.

Excavations in paved streets owned and maintained by the city degrade and shorten the life of the surface of the streets, and this degradation increases the frequency and cost to the public of necessary resurfacing, maintenance and repair. These excavations cause degradation of the streets even where the excavations are refilled and repaired in conformity with applicable standards and requirements. It is appropriate that entities responsible for excavating into the city right-of-way bear the burden of the resulting cost of this degradation and shortened life of the surface rather than the taxpayers of the city. In addition, establishment of a trench cut cost recovery fee will create an incentive for utilities to coordinate excavations in the streets. This chapter shall not be construed to relieve those excavating into the city right-of-way of the obligation to fill, repair and properly maintain the location of the excavation. (Ord. 840, 2020)

§ 12.06.040. Establishment of trench cut cost recovery fee.

No person shall excavate in a public right-of-way without, in addition to all other requirements of this code, having first paid to the city a "trench cut cost recovery fee." The amount of this trench cut cost recovery fee shall be determined by reference to the tables attached as Exhibit A to the ordinance codified in this chapter, which tables may be modified annually (every January 1st) by the SF-Bay Area Construction Cost Index or by resolution and shall not exceed the reasonable cost necessary to mitigate the degradation to the public streets caused by such excavation. (Ord. 840, 2020)

§ 12.06.050. Variance from payment of trench cut cost recovery fee.

Any person subject to the trench cut cost recovery fee may request that the director waive the requirement of payment of the trench cut cost recovery fee due to individual circumstances that demonstrate, on a case-by-case basis, that the amount of the fee is not reasonably related to the projected impact of the proposed excavation. (Ord. 840, 2020)

§ 12.06.060. Exceptions.

  • A. Excavations in city streets scheduled for pavement structural improvements within two years of the date of excavation shall be exempt from the trench cut cost recovery fee.

  • B. No trench cut cost recovery fee shall be charged for underground utility district projects initiated by the city, or utility line relocations necessitated by city street work projects or by street vacations or abandonments.

  • C. No trench cut cost recovery fee shall be charged for excavations performed by or for the city public works department.

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

PATTERSON CODE

§ 12.06.060

§ 12.06.080

  • D. No trench cut cost recovery fee shall be charged with respect to excavation in a sidewalk or a concrete street.

  • E. No trench cut cost recovery fee shall be charged where the proposed work will include resurfacing of all or a significant portion of the public right-of-way where the excavation is made, and the city engineer approves the resurfacing. A "significant portion of the public right-of-way" means a surface area of the public right-of-way with minimum length and width dimensions as follows: length: twenty-five feet from the nearest edge of the excavation area; and width: the full width of each traffic lane if any portion of the lane is within the trench influence area.

  • F. No trench cut cost recovery fee shall be charged for repair work required by the city engineer.

  • (Ord. 840, 2020)

§ 12.06.070. Protest of trench cut cost recovery fee—Claims for refund—Appeals.

  • A. Any person required to pay a trench cut cost recovery fee pursuant to this chapter and not granted a variance pursuant to this chapter who desires to protest or otherwise challenge the imposition or amount of the fee shall tender to the city payment in full of the fee when due, accompanied by a written notice containing the following information:

    1. A statement that the required payment is tendered under protest; and

    2. A description of the factual and legal basis for the protest. If the person contends that the fee is inconsistent with the provisions of a contract, the written notice shall include a complete, executed copy of the contract along with a description of the claimed inconsistency.

  • B. Any person required to pay a trench cut cost recovery fee pursuant to this chapter, and who has complied with the fee protest provisions of subsection A of this section, may submit a claim for refund of the fee in the manner set forth in California Government Code Section 910 et seq. and within the time limits set forth in Government Code Section 911.2. In evaluating the claim, the city manager shall consider whether the claimant has established: (1) the claimant's excavation will not degrade and shorten the life of the surface of the street(s); (2) that the degradation of the street(s) will not increase the frequency and cost to the public of necessary resurfacing, maintenance and repair of the street(s); (3) that the imposition or amount of the trench cut cost recovery fee is inconsistent with a contract to which the claimant is a party; or (4) that the imposition or amount of the trench cut cost recovery fee required of the claimant is unlawful for another reason. If the city manager finds that future imposition of the trench cut cost recovery fee against the claimant would also be inconsistent with a contract to which the claimant is a party or would be unlawful for another reason, the claimant shall thereafter be exempt from the trench cut cost recovery fee, unless the city manager later finds on the basis of changed circumstances that the exemption should be revoked.

  • C. The validity or amount of a trench cut cost recovery fee shall not be contested in any action or proceeding unless the action or proceeding is commenced within ninety days after a claim is filed and denied pursuant to subsection B of this section.

  • (Ord. 840, 2020)

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

STREETS AND OTHER PUBLIC PLACES

§ 12.06.080

§ 12.06.090

§ 12.06.080. Utility master plans.

  • A. Any utility owning, operating or installing in a public right-of-way facilities providing water, sewer, gas, electric, communication, video or other utility services shall prepare and submit to the city engineer a utility master plan, in a format specified by the city engineer, that shows the location of the utility's existing facilities in public rights-of-way, and shows all of the utility's planned major utility work in public rights-of-way for the next year. Utilities shall submit an initial utility master plan no later than one hundred eighty days after the effective date of the ordinance adopting this section. Thereafter, each utility shall submit annually, on the first regular business day of August, a revised and updated utility master plan. A utility may extend its deadline to submit its utility master plan by a period not to exceed fifteen days by submitting written notice to the city engineer of the delay and identifying the reasons for the delay. As used in this subsection, the term "planned major utility works" refers to any and all future excavations planned by the utility when the utility master plan or update is submitted that will affect any public right-of-way for more than fifteen days; provided, that the utility shall not be required to show future excavations planned to occur more than a year after the date that the utility master plan or update is submitted.

  • B. The city engineer shall make all utility master plans submitted in accordance with subsection A of this section available for public inspection.

  • C. Prior to applying for an excavation permit, any person planning to excavate in the public rights-of-way shall review the utility master plans and the city's repaving plan on file with the city engineer and shall coordinate, to the extent practicable, with the utility and street work shown on such plans to minimize damage to, and avoid undue disruption and interference with, the use of public rights-of-way.

  • (Ord. 840, 2020)

§ 12.06.090. Moratorium.

  • A. Excavation in newly renovated public rights-of-way is prohibited for three years after filing of a notice of completion or acceptance of a new street or structural overlay of an entire street except as follows:

    1. Emergency which endangers life or property;

    2. Repair or modification to prevent interruption of essential utility services;

    3. Relocation work that is mandated by county, state or federal legislation or that is required by a city redevelopment agency project;

    4. Service for buildings or parcels where no other reasonable means of providing service exists, as determined by the city engineer;

    5. In a public right-of-way that the city has scheduled for overlay or reconstruction within two years after the date of excavation due to failure of the original pavement;

    6. For potholing to verify utility depth or location;

    7. Trenchless excavations greater than three feet in depth of cover over the utility facility not requiring a significant surface incision greater than industry bore pit standards may be allowed at the discretion of the city engineer;

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

PATTERSON CODE

§ 12.06.090

§ 12.06.100

  1. Excavations which are essential components of a regional project which will provide a substantial public benefit, such as extensions of water lines to enable delivery of new supplemental water supplies; or

  2. Other situations deemed by the city engineer to be in the best interest of the general public.

  • B. Where a permit is issued to excavate during the three-year period after filing of a notice of completion or acceptance of a new street or structural overlay of an entire street, payment of the trench cut cost recovery fee will be required regardless of whether the person has executed a pavement life performance warranty unless: (1) an emergency need to excavate arises from a natural disaster such as an earthquake; or (2) the excavation is necessary to accomplish relocation work that is mandated by city, county, state or federal legislation or that is required by a city redevelopment agency project; or (3) the utility or public agency provided timely notice of intention to excavate as provided in Section 12.06.100(E).

  • C. The moratorium on excavations to a newly renovated public right-of-way shall not apply if: (1) the only renovation undertaken to the right-of-way is a seal coat; or (2) the city pavement management plan does not identify the renovation at least three months prior to initiation of the renovation work.

  • D. The moratorium in subsection A of this section shall not apply if the structural overlay was completed prior to the effective date of the ordinance codified in this chapter.

  • (Ord. 840, 2020)

§ 12.06.100. Coordination with city.

  • A. Prior to applying for an excavation permit in the public rights-of-way, the city shall review, on behalf of the applicant, the city's anticipated repaving plans and the utility master plans on file with the city engineer. The applicant shall coordinate, to the extent practicable, with the utility and street work shown on such plans to minimize damage to, and avoid undue disruption and interference with, the public rights-of-way. Such coordination shall include:

    1. Whenever two or more parties (i.e., the city or any applicant) have proposed a major excavation in the same block, they shall meet and confer with the city regarding whether it is feasible to conduct a joint operation excavation. If the parties select a single contractor to do the joint work then the city engineer may direct that only a single trench cut cost recovery fee shall be charged.
  • B. To avoid future excavations and to reduce the number of street excavations, telecommunication companies shall be requested, when practical, to install spare conduits.

  • C. In order to encourage coordination of excavation and pavement scheduling and planning between the city and excavators, the city shall update at least annually its anticipated repaving plans. The anticipated repaving plans shall also identify the public rights-of-way which are then subject to the moratorium provisions of Section 12.06.090, and the moratorium expiration date for each such right-of-way. A copy of the anticipated repaving plans shall be available for review at the department of public works by any interested person.

  • D. The city engineer shall conduct a working group meeting at least once each year at which utilities and public agencies and other interested parties may meet to coordinate excavation

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

STREETS AND OTHER PUBLIC PLACES

§ 12.06.100

§ 12.06.120

and repaving schedules. The city engineer shall maintain a list of those requesting notice of the working group meeting, and, at least thirty days prior to the meeting date, shall mail notice of the time and location of the meeting to each person who has requested notice. If the initial working group meeting is not completed on the designated meeting date, the meeting may continue on a subsequent date as the director announces at the end of the first meeting.

  • E. Each year, the city engineer shall notify the utilities of the roads selected for overlay (the "annual overlay list"). Any utility or public agency may mail written notice to the city engineer of their intention to excavate in a public right-of-way that has been identified in the annual overlay list by identifying the location and dimensions of the planned excavation and the estimated commencement and completion dates of the work. The date of completion of the planned excavation shall be no later than three years after the date of notice of the annual overlay list. The notice of intention to excavate shall be mailed not more than sixty days after mailing of the annual overlay list. After receipt of a timely notice, the city may delay any anticipated repaving of the affected public right-of-way to a date after the planned excavation. If the city proceeds with repaving prior to the planned excavation, no trench cut cost recovery fee shall be charged to the utility or public agency for the planned excavation that is substantially consistent with the excavation described in the notice of intention to excavate. Nothing in this section affects the obligations of utilities or public agencies under a written pavement life performance warranty, nor does this section permit excavations otherwise prohibited by moratorium.

  • (Ord. 840, 2020)

§ 12.06.110. Repair of sunken pavement over excavation.

  • A. If the subsurface materials or pavement over or within the trench influence area becomes depressed or broken at any time, the person shall, within fourteen days of mailing of written notice from the city engineer, immediately inspect the depressed or broken area to ascertain the cause of the failure. The person shall make repairs to the installation or backfill and have the pavement restored in the manner and within the time period specified by the city engineer, but not to exceed thirty days. In the event the city engineer determines the pavement condition creates a road hazard, the city engineer may require the repair to be completed within forty-eight hours. A trench cut cost recovery fee shall not be charged for work performed under this section.

  • B. If the pavement is not restored as specified by the city engineer, unless delayed by conditions beyond the person's control, the city engineer may cause the work to be done after giving the person twenty-four hours' final notice. The person shall thereafter, upon written demand by city engineer, pay the city an amount calculated by multiplying the number of square feet of pavement restored by the square foot trench repair reimbursement fee set forth in the then most current public works service and capital improvement fees schedule. The person shall remain responsible for any future repairs of that portion of pavement over the excavation that was repaired by the city.

  • (Ord. 840, 2020)

§ 12.06.120. Creation of trench cut cost recovery fee fund.

There is created and established the "trench cut cost recovery fee fund." The fund is a restricted fund, and all funds deposited into the trench cut cost recovery fee fund shall be used solely for

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

PATTERSON CODE

§ 12.06.120

§ 12.06.140

the purposes identified in this chapter.

(Ord. 840, 2020)

§ 12.06.130. Deposit of moneys.

All funds received pursuant to the provisions of this chapter shall be placed in the trench cut cost recovery fee fund.

(Ord. 840, 2020)

§ 12.06.140. Expenditure of funds.

Funds maintained in the trench cut cost recovery fee fund shall only be expended for the maintenance, rehabilitation, resurfacing, administration and protection of the public rights-ofway that have been excavated after the effective date of the ordinance codified in this chapter, and for refunds of fees approved by the council.

(Ord. 840, 2020)

Downloaded from https://ecode360.com/PA4584 on 2026-07-07

City of Patterson, CA

STREETS AND OTHER PUBLIC PLACES

§ 12.08.010

§ 12.08.030

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Patterson Municipal Code
Patterson Municipal Code
  1. Title 1
  2. Title 2
  3. Chapter 2.34 — DISPOSAL OF UNCLAIMED PROPERTY
  4. Chapter 2.04 — CITY OFFICE
  5. Chapter 2.08 — CITY COUNCIL MEETINGS
  6. Chapter 2.10 — COUNCIL MEMBER ELECTIONS BY DISTRICT
  7. Chapter 2.12 — COMPENSATION OF CITY OFFICIALS
  8. Chapter 2.14 — CITY ATTORNEY
  9. Chapter 2.16 — CITY MANAGER
  10. Chapter 2.18 — FINANCE DIRECTOR
  11. Chapter 2.20 — SUPERINTENDENT OF STREETS
  12. Chapter 2.22 — POLICE DEPARTMENT
  13. Chapter 2.24 — FIRE DEPARTMENT
  14. Chapter 2.28 — LAW ENFORCEMENT OFFICER TRAINING
  15. Chapter 2.34 — DISPOSAL OF UNCLAIMED PROPERTY
  16. Chapter 2.36 — EMERGENCY SERVICES
  17. Chapter 2.40 — PLANNING COMMISSION
  18. Chapter 2.44 — INDUSTRIAL DEVELOPMENT AUTHORITY
  19. Chapter 2.48 — ECONOMIC STRATEGIC COMMISSION
  20. Chapter 2.50
  21. Chapter 2.52 — PARKS AND RECREATION COMMISSION
  22. Chapter 2.54 — BEAUTIFICATION COMMITTEE
  23. Chapter 2.60 — REDEVELOPMENT AGENCY AND PLAN
  24. Chapter 2.70 — SENIOR COMMISSION
  25. Title 3
  26. Chapter 3.12 — FUNDS
  27. Chapter 3.16
  28. Chapter 3.20 — SALES AND USE TAX
  29. Chapter 3.24 — REAL PROPERTY TRANSFER TAX
  30. Chapter 3.28 — GENERAL GOVERNMENT IMPACT FEE
  31. Chapter 3.40
  32. Chapter 3.44 — CLAIMS PROCEDURES
  33. Chapter 3.48 — COMMUNITY FACILITIES IMPACT FEE
  34. Chapter 3.52 — PUBLIC SAFETY IMPACT FEE
  35. Chapter 3.56 — GENERAL PLAN REIMBURSEMENT FEE
  36. Chapter 3.64 — NEW DEVELOPMENT IMPACT FEES
  37. Chapter 3.68 — TRANSIENT OCCUPANCY TAX
  38. Chapter 3.70
  39. Title 5
  40. Chapter 5.04 — BUSINESS LICENSES GENERALLY
  41. Chapter 5.08 — PEDDLERS AND SOLICITORS
  42. Chapter 5.09 — MASSAGE ESTABLISHMENTS
  43. Chapter 5.10
  44. Chapter 5.11 — GARAGE SALES
  45. Chapter 5.12 — TAXICABS—VEHICLES FOR HIRE
  46. Chapter 5.14 — CANNABIS BUSINESS TAX[2 ]
  47. Chapter 5.16 — TELEVISION ANTENNA ERECTION
  48. Chapter 5.20 — POOL AND BILLIARDS—CARD ROOMS
  49. Chapter 5.24 — INTOXICATING LIQUORS
  50. Chapter 5.30 — BINGO GAMES
  51. Chapter 5.38
  52. Chapter 5.40 — ALARM RESPONSE
  53. Chapter 5.44 — JUNK DEALERS AND SCRAP METAL RECYCLERS
  54. Title 6
  55. Chapter 6.04 — RESTAURANTS
  56. Chapter 6.08 — MILK AND MILK PRODUCTS
  57. Chapter 6.10 — SMOKING POLLUTION CONTROL
  58. Chapter 6.12 — GARBAGE REMOVAL
  59. Chapter 6.13 — CURBSIDE RECYCLING PROGRAM
  60. Chapter 6.14 — CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING PR…
  61. Chapter 6.15
  62. Chapter 6.16 — PROPERTY MAINTENANCE
  63. Chapter 6.18 — NEGLECTED VACANT STRUCTURES
  64. Chapter 6.20 — MISTLETOE ABATEMENT
  65. Chapter 6.24
  66. Chapter 6.28 — FIREWORKS SALES AND DISCHARGE
  67. Chapter 6.29
  68. Chapter 6.32 — TRAILERS
  69. Chapter 6.36 — DRUG PARAPHERNALIA
  70. Chapter 6.40 — HAZARDOUS MATERIALS
  71. Chapter 6.48 — RIGHT TO FARM
  72. Chapter 6.50 — GRAFFITI
  73. Chapter 6.52 — MEDICAL MARIJUANA DISPENSARIES (Repealed by Ord…
  74. Chapter 6.53 — REGULATING SMOKING AND TOBACCO PRODUCT USE IN C…
  75. Chapter 6.56 — CANNABIS BUSINESS PROGRAM
  76. Chapter 6.57
  77. Chapter 6.58 — CANNABIS CAMPUS PILOT PROGRAM
  78. Title 7
  79. Chapter 7.58 — ANIMALS IN RESIDENTIAL AREAS
  80. Chapter 7.04 — GENERAL PROVISIONS
  81. Chapter 7.14
  82. Chapter 7.16
  83. Chapter 7.28 — DANGEROUS ANIMALS
  84. Chapter 7.36 — RABIES CONTROL
  85. Chapter 7.44 — DEAD OR ABANDONED ANIMALS
  86. Chapter 7.48 — VIOLATION—PENALTY
  87. Chapter 7.50 — ANIMAL SERVICE FEES
  88. Chapter 7.54 — BREEDING AND TRANSFERRING OF DOGS AND CATS, AND…
  89. Chapter 7.58 — ANIMALS IN RESIDENTIAL AREAS
  90. Title 9
  91. Chapter 9.04 — FIRE HYDRANTS
  92. Chapter 9.08 — USE OF WATER DURING FIRES
  93. Chapter 9.12 — POLICE DOGS
  94. Chapter 9.14 — STREET GANGS
  95. Chapter 9.16 — GAMBLING
  96. Chapter 9.18 — INDECENT EXPOSURE
  97. Chapter 9.20 — ADULT-RELATED ESTABLISHMENTS
  98. Article II
  99. Article III
  100. Article IV — Miscellaneous Provisions
  101. Chapter 9.24 — BILL POSTING AND PAINTING ON PROPERTY
  102. Chapter 9.26 — SHOPPING CART REGULATIONS
  103. Chapter 9.27 — UNATTENDED COLLECTION BIN PERMIT
  104. Chapter 9.28 — FORTUNETELLING
  105. Chapter 9.32 — MINOR'S CURFEW
  106. Chapter 9.34 — DISPLAY OF ADULT MATTER TO MINORS
  107. Chapter 9.35
  108. Chapter 9.36 — WEAPONS
  109. Chapter 9.40 — FIREARMS POSSESSION AND FIRING
  110. Chapter 9.43 — HEALTH AND HYGIENE
  111. Chapter 9.50 — CAMPING WITHIN CITY LIMITS
  112. Chapter 9.54
  113. Chapter 9.55 — SEX OFFENDER RESIDENCY RESTRICTIONS
  114. Title 10
  115. Chapter 10.04 — GENERAL TRAFFIC REGULATIONS—PENALTIES
  116. Chapter 10.06 — GENERAL PARKING RESTRICTIONS
  117. Chapter 10.12 — PARKING, STOPPING AND STANDING
  118. Chapter 10.16 — PARKING AREAS OF CITY
  119. Chapter 10.20 — LOADING AND UNLOADING—ALLEYS—BUS AND TAXI STOPS
  120. Chapter 10.22 — OVERSIZED VEHICLES
  121. Chapter 10.24 — ABANDONED VEHICLES
  122. Chapter 10.28
  123. Article I — Licensing And Sale
  124. Chapter 10.32 — TRUCK ROUTES
  125. Chapter 10.34 — INTERSTATE TRUCK TERMINALS AND ROUTES
  126. Chapter 10.36 — TRAINS BLOCKING STREETS
  127. Chapter 10.40 — SPEED LIMITS
  128. Chapter 10.42 — FUNERAL PROCESSIONS
  129. Title 12
  130. Chapter 12.04 — EXCAVATIONS
  131. Chapter 12.06 — STREET TRENCH CUT COST RECOVERY FEE
  132. Chapter 12.08 — OBSTRUCTIONS TO STREETS
  133. Chapter 12.12 — SIDEWALK AND CURB CONSTRUCTION[1 ]
  134. Chapter 12.14
  135. Chapter 12.16 — TREES
  136. Chapter 12.20 — ENCROACHMENT REGULATIONS
  137. Chapter 12.24 — PARK REGULATIONS
  138. Chapter 12.30 — SKATE PARK FACILITY
  139. Title 13
  140. Chapter 13.02 — SANITARY CODE
  141. Article XI — Miscellaneous Provisions
  142. Article XI — Miscellaneous Provisions
  143. Chapter 13.04 — SEWER EXTENSIONS
  144. Chapter 13.08 — OUTSIDE SEWER CONNECTIONS
  145. Chapter 13.24 — WATER SYSTEM
  146. Chapter 13.28
  147. Title 15
  148. Chapter 15.04 — CALIFORNIA BUILDING CODE
  149. Chapter 15.08 — FIRE HAZARD SEVERITY ZONES
  150. Chapter 15.20 — CALIFORNIA FIRE CODE
  151. Chapter 15.24 — MOVING BUILDINGS
  152. Chapter 15.04 — CALIFORNIA BUILDING CODE
  153. Chapter 15.06 — CALIFORNIA ENERGY CODE[1 ]
  154. Chapter 15.08 — FIRE HAZARD SEVERITY ZONES[2 ]
  155. Chapter 15.12 — PLUMBING CODE (Repealed by Ord. 798)
  156. Chapter 15.14 — CALIFORNIA PLUMBING CODE
  157. Division II — Organization and Enforcement
  158. Chapter 15.18 — CALIFORNIA ELECTRICAL CODE
  159. Chapter 15.20 — CALIFORNIA FIRE CODE
  160. Chapter 15.22 — ELEVATOR SAFETY CODE (Repealed by Ord. 798)
  161. Chapter 15.24 — MOVING BUILDINGS
  162. Chapter 15.26
  163. Chapter 15.28 — SWIMMING POOLS (Repealed by Ord. 798)
  164. Chapter 15.30 — SWIMMING POOL, SPA AND HOT TUB CODE
  165. Chapter 15.32 — SIGNS AND SIGN STRUCTURES
  166. Chapter 15.36 — HOUSING CODE
  167. Chapter 1 — TITLE AND SCOPE
  168. Chapter 2 — ENFORCEMENT
  169. Chapter 3 — PERMITS AND INSPECTIONS
  170. Chapter 4 — DEFINITIONS
  171. Chapter 5 — SPACE AND OCCUPANCY STANDARDS
  172. Chapter 6 — STRUCTURAL REQUIREMENTS
  173. Chapter 7 — MECHANICAL AND ELECTRICAL REQUIREMENTS
  174. Chapter 8 — EXITS
  175. Chapter 9 — FIRE PROTECTION
  176. Chapter 10 — SUBSTANDARD BUILDINGS
  177. Chapter 11 — NOTICES AND ORDERS OF BUILDING OFFICIAL
  178. Chapter 12 — APPEAL
  179. Chapter 15.38 — HISTORICAL BUILDING CODE
  180. Chapter 15.39 — CALIFORNIA EXISTING BUILDING CODE
  181. Chapter 15.42 — CALIFORNIA MECHANICAL CODE
  182. Part II — Organization and Enforcement
  183. Chapter 15.44 — DANGEROUS BUILDINGS CODE
  184. Chapter 1 — TITLE AND SCOPE
  185. Chapter 2 — ENFORCEMENT
  186. Chapter 3 — DEFINITIONS
  187. Chapter 4 — NOTICES AND ORDERS OF BUILDING OFFICIAL
  188. Chapter 5 — APPEAL
  189. Chapter 15.46 — CALIFORNIA RESIDENTIAL CODE
  190. Division II — ADMINISTRATION
  191. Chapter 15.48 — WATER-EFFICIENT LANDSCAPE
  192. Chapter 15.50
  193. Chapter 15.52 — UNIFORM ADMINISTRATIVE CODE
  194. Chapter 15.54 — CALIFORNIA ADMINISTRATIVE CODE
  195. Chapter 15.56 — CALIFORNIA REFERENCE STANDARD CODE
  196. Chapter 15.58 — ADA STANDARDS FOR ACCESSIBLE DESIGN
  197. Chapter 15.59
  198. Chapter 15.60
  199. Title 16
  200. Chapter 16.44 — DEDICATION—PARK AND RECREATION
  201. Chapter 16.38 — DEDICATIONS AND IMPROVEMENTS GENERALLY
  202. Chapter 16.50 — AGRICULTURAL MITIGATION POLICY
  203. Chapter 16.72 — ENVIRONMENTAL IMPACT, AND GRADING AND EROSION …
  204. Chapter 16.04 — CITATION, AUTHORITY AND PURPOSE
  205. Chapter 16.12 — GENERAL PROVISIONS
  206. Chapter 16.20
  207. Chapter 16.24 — TENTATIVE PARCEL MAPS
  208. Chapter 16.28 — TENTATIVE SUBDIVISION MAPS
  209. Chapter 16.32 — ACTION ON TENTATIVE MAP
  210. Chapter 16.36 — FINAL MAP
  211. Chapter 16.38 — DEDICATIONS AND IMPROVEMENTS GENERALLY
  212. Chapter 16.40
  213. Chapter 16.42 — IMPROVEMENT SECURITY
  214. Chapter 16.44 — DEDICATION—PARK AND RECREATION
  215. Chapter 16.48 — DEDICATION—SCHOOL SITE
  216. Chapter 16.50
  217. Chapter 16.52
  218. Chapter 16.60 — MONUMENTS
  219. Chapter 16.64 — DRAINAGE, SEWER AND WATER FACILITIES
  220. Chapter 16.68 — SOIL REPORTS
  221. Chapter 16.72
  222. Chapter 16.74 — LOT LINE ADJUSTMENT
  223. Chapter 16.76 — REVERSION TO ACREAGE
  224. Chapter 16.77 — MERGER OF SUBSTANDARD LOTS
  225. Chapter 16.88 — APPEALS
  226. Chapter 16.92 — PLANNING COMMISSION
  227. Chapter 16.96 — VIOLATIONS—PENALTY
  228. Chapter 16.100 — VESTING TENTATIVE MAP
  229. Title 17
  230. Chapter 17.04 — GENERAL PROVISIONS
  231. Chapter 17.08 — DEFINITIONS
  232. Chapter 17.12 — PROVISIONS FOR FLOOD HAZARD REDUCTION
  233. Chapter 17.16 — ADMINISTRATION
  234. Title 18
  235. Chapter 18.02 — PURPOSE AND APPLICABILITY
  236. Chapter 18.16 — PLANNING DIRECTOR DECISIONS
  237. Chapter 18.12 — LAND USE AND DEVELOPMENT APPROVAL
  238. Chapter 18.58 — EMERGENCY SHELTER OVERLAY ZONE
  239. Division IV — SITE DEVELOPMENT
  240. Chapter 18.70 — FENCES, WALLS, AND SCREENING
  241. Chapter 18.80 — LIGHTING
  242. Chapter 18.88 — DENSITY BONUS AND AFFORDABLE HOUSING INCENTIVES
  243. Chapter 18.84 — WIRELESS COMMUNICATIONS
  244. Division V — DEFINITIONS
  245. Chapter 18.02 — PURPOSE AND APPLICABILITY
  246. Chapter 18.04 — ADMINISTRATIVE RESPONSIBILITY
  247. Chapter 18.06 — RULES AND INTERPRETATION
  248. Chapter 18.08 — ENFORCEMENT
  249. Chapter 18.12 — LAND USE AND DEVELOPMENT APPROVAL
  250. Chapter 18.14 — GENERAL APPLICATION PROCESSING
  251. Chapter 18.16 — PLANNING DIRECTOR DECISIONS
  252. Chapter 18.18 — PLANNING COMMISSION DECISIONS
  253. Chapter 18.20 — CITY COUNCIL DECISIONS
  254. Chapter 18.30 — ESTABLISHMENT OF ZONING DISTRICTS
  255. Chapter 18.34 — LAND USE CLASSIFICATION
  256. Chapter 18.38 — RESIDENTIAL DISTRICTS
  257. Chapter 18.42 — COMMERCIAL AND MEDICAL/PROFESSIONAL OFFICE DIS…
  258. Chapter 18.46 — INDUSTRIAL DISTRICTS
  259. Chapter 18.50 — PUBLIC/QUASI-PUBLIC AND PARKS AND RECREATION D…
  260. Chapter 18.54 — OVERLAY DISTRICTS
  261. Chapter 18.58 — EMERGENCY SHELTER OVERLAY ZONE
  262. Chapter 18.60 — GENERAL DEVELOPMENT STANDARDS
  263. Chapter 18.62 — ACCESSORY STRUCTURES
  264. Chapter 18.63 — CHILD CARE PROVISIONS
  265. Chapter 18.64 — HOME OCCUPATIONS
  266. Chapter 18.66 — SECOND UNITS
  267. Chapter 18.68 — LIVE/WORK UNITS
  268. Chapter 18.70 — FENCES, WALLS, AND SCREENING
  269. Chapter 18.72 — OUTDOOR SALES, STORAGE AND SEATING
  270. Chapter 18.73 — PUBLIC ART
  271. Chapter 18.74 — INTEGRATED DEVELOPMENT
  272. Chapter 18.76 — PARKING AND LOADING
  273. Chapter 18.78 — LANDSCAPING
  274. Chapter 18.80 — LIGHTING
  275. Chapter 18.82 — SIGNS
  276. Chapter 18.84 — WIRELESS COMMUNICATIONS
  277. Chapter 18.86 — INCLUSIONARY HOUSING
  278. Chapter 18.88 — DENSITY BONUS AND AFFORDABLE HOUSING INCENTIVES
  279. Chapter 18.89 — REASONABLE ACCOMMODATION
  280. Chapter 18.90 — TEMPORARY USES
  281. Chapter 18.92 — DRUG OR ALCOHOL ABUSE TREATMENT FACILITIES
  282. Chapter 18.94 — NONCONFORMING USES AND STRUCTURES
  283. Chapter 18.95
  284. Chapter 18.96 — LAND USE DEFINITIONS
  285. Chapter 18.98 — GENERAL DEFINITIONS
  286. Title SR
  287. § SR-2. Administration and Personnel.
  288. § SR-3. Revenue and Finance.
  289. § SR-4. Business Licenses, Taxes and Regulations.
  290. § SR-5. Animals.
  291. § SR-6. Health and Safety.
  292. § SR-7. Public Peace, Morals and Welfare.
  293. § SR-8. Vehicles and Traffic.
  294. § SR-9. Streets, Sidewalks and Public Places.
  295. § SR-10. Public Services.
  296. § SR-11. Buildings and Construction.
  297. § SR-12. Subdivisions.
  298. § SR-14. Environment.
  299. Title OL

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.