21.54.010 - Purpose and applicability.

This chapter establishes standards for the siting of all electrical, telephone, cable television, and similar distribution lines providing direct service to a development site.

(Ord. No. 1144 N.S., § 3(Exh. A), 10-1-2024)

Exceptions & meaning →

21.54.020 - General provisions.

A. All new utility service lines shall be under-grounded unless determined to be infeasible or unduly cost prohibitive as determined by the city engineer.

B. Transformers, control points, and other utility housings shall be located so as to minimize their visual impact and shall be screened in a manner approved by the review authority.

(Ord. No. 1144 N.S., § 3(Exh. A), 10-1-2024)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Paso Robles Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.