Skip to content

Article VI — NONCONFORMING USES

SEC. 16-513. COMPUTATION OF TIME FOR REMOVAL OF STRUCTURE.

Oxnard Zoning Code · 2026-06 edition · updated 2026-09-23 · Oxnard

When setting a date by which a nonconforming structure shall be removed, the commission shall estimate the reasonable, unamortized value of the nonconforming structure and determine the time within which the owner of the building will realize the reasonable unamortized value.

(`64 Code, Sec. 34-121) (Ord. No. 734)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Oxnard Zoning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.