Chapter 15 — SUBDIVISIONS›Article VI — DEVELOPMENT FEE PROCEDURES›Division 4 — PLANNED WATER FACILITIES FEES
SEC. 15-206. MASTER PLAN OF WATER FACILITIES.
Oxnard Planning Code · 2026-07 edition · updated 2026-09-23 · Oxnard
The master plan of water facilities for the city contains an estimate of the total costs of constructing the water facilities required by the plan and a map of the area covered by the plan, showing the location of the facilities. The fees imposed by this division shall be based on the master plan of water facilities. The costs estimated in the master plan of water facilities shall be adjusted to reflect current costs.
(`64 Code, Sec. 27-89.41) (Ord. No. 2258)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Oxnard Planning Code
- Chapter 15 — SUBDIVISIONS
▸Chapter 15 — SUBDIVISIONS
Overview- Article I — GENERAL PROVISIONS
- Article II — MAPS
- Article III — PROCEDURES
- Article IV — DEDICATIONS AND RESERVATIONS
- Article V — IMPROVEMENTS AND STANDARDS
▸Article VI — DEVELOPMENT FEE PROCEDURES
Overview- Division 1 — IN GENERAL
- Division 2 — PLANNED DRAINAGE FACILITIES FEES
- Division 3 — PLANNED WASTEWATER FACILITIES FEES
▸Division 4 — PLANNED WATER FACILITIES FEES
- Division 5 — PLANNED TRAFFIC CIRCULATION FACILITIES FEES
- Division 6 — GROWTH REQUIREMENT CAPITAL FEES
- Division 7 — BRIDGE AND THOROUGHFARE FEES
- Division 8 — MOBILITY FEES
- Article VII — SOIL REPORTS
- Article VIII — REVERSION TO ACREAGE
- Article IX — IMPROVEMENT AGREEMENTS
- Article X — SECURITY AND SECURITY RELEASE
- Article XI — EFFECT OF APPROVALS