Skip to content

Chapter 15 — SUBDIVISIONS›Article VI — DEVELOPMENT FEE PROCEDURES›Division 4 — PLANNED WATER FACILITIES FEES

SEC. 15-206. MASTER PLAN OF WATER FACILITIES.

Oxnard Planning Code · 2026-07 edition · updated 2026-09-23 · Oxnard

The master plan of water facilities for the city contains an estimate of the total costs of constructing the water facilities required by the plan and a map of the area covered by the plan, showing the location of the facilities. The fees imposed by this division shall be based on the master plan of water facilities. The costs estimated in the master plan of water facilities shall be adjusted to reflect current costs.

(`64 Code, Sec. 27-89.41) (Ord. No. 2258)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Oxnard Planning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.