Division 6 — REPORTING REQUIREMENTS
Oxnard Municipal Code · 2026-09 edition · updated 2026-09-27 · Oxnard
SEC. 19-70. MONITORING FACILITIES.
(A) All users required to obtain an IWD permit shall furnish, install and properly maintain a monitoring facility for wastewater sampling. This monitoring facility shall be of a design or configuration approved by the city manager, who may require flow measurement equipment, automatic flow proportional sampling equipment and automatic wastewater analysis and data recording equipment.
(B) Each user, as a part of its application for obtaining an IWD permit, shall propose a suitable location and design for the wastewater monitoring facility. Upon approval of the monitoring facility by the city manager, the user shall perform wastewater monitoring at this facility. The monitoring facility shall be located so as to be safe and accessible to city employees, and shall be constructed in accordance with the city's requirements, and all applicable local building codes and other local construction requirements. The user's proposal for a wastewater monitoring facility shall comply with the city's design requirements and shall be reviewed and approved by the city manager. Plans for all wastewater monitoring facilities, including flow measurement and sampling systems, determined by the city manager to require engineering design, shall be prepared and signed by a civil, chemical or mechanical engineer registered in the State or a registered engineer of other suitable discipline as determined by the city manager.
(C) The user's wastewater sampling analysis and flow measurement procedures, equipment, and results shall be subject to inspection by the city manager at any time. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times by the user.
(D) Failure of a user to keep approved wastewater monitoring facilities clean and in good working order shall not be grounds for the user to claim that any sample results are unrepresentative of the user's wastewater. Flow measurement systems shall be regularly maintained and calibrated in accordance with guidelines established by the city manager.
(`64 Code, Sec. 25-48) (Ord. No. 2494)
SEC. 19-71. BASELINE MONITORING REPORTS.
(A) Within either 180 days after the effective date of a categorical pretreatment standard by an agency with the appropriate jurisdiction and authority to adopt categorical pretreatment standards, or within 180 days after the final administrative decision on a category determination under 40 CFR Part 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the system shall submit to the city manager a report which contains the information listed in subsection (C) below.
iction and authority to adopt categorical pretreatment standards, or within 180 days after the final administrative decision on a category determination under 40 CFR Part 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the system shall submit to the city manager a report which contains the information listed in subsection (C) below.
(B) At least 90 days prior to commencement of discharge, new sources, and sources that become categorical users subsequent to the promulgation of applicable categorical standard, shall submit to the city manager a report which contains the information listed in subsection (C) below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source shall also give estimates of anticipated flow and quantity of pollutants discharged.
(C) Users described above shall submit the information set forth below, and all such submittals must be signed and certified in accordance with section19-55 of this chapter:
(1) The name and address of the facility, including the name of the operator and owner;
(2) A list of any environmental control permits held by or for the facility;
(3) A brief description of the nature, average rate of production, and standard industrial classifications of the operation carried out by the user including a schematic
process diagram that indicates points of discharge to the system from the regulated processes;
(4) Information showing the measured average daily and maximum daily flow, in gallons per day, to the system from regulated process streams and other streams,
as necessary, to allow use of the combined waste stream formula set out in 40 CFR Part 403.6(e);
(5) (a) The categorical pretreatment standards applicable to each regulated process;
(b) The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or the city manager, of regulated
pollutants in the discharge from each regulated process including instantaneous, daily maximum, and long-term average concentrations, or mass, where required;
(c) The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section19-79 of this article. Sampling
shall be performed in accordance with procedures set out in section 19-80 of this article.
(6) A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met
on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements;
(7) If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the user shall provide the city manager with the shortest schedule by which the user shall complete such additional pretreatment and/or O&M. The completion date shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in section 19-72 of this article;
(8) Any other relevant information requested by the city manager; and
(9) Signed and certified baseline monitoring reports in accordance with section 19-71 of this article.
(`64 Code, Sec. 25-49) (Ord. No. 2494, 2761, 2875)
SEC. 19-72. COMPLIANCE SCHEDULES.
The following conditions shall apply to the schedule required by section19-71(C)(7) of this article:
(A) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation;
(B) No increment referred to above shall exceed nine months;
(C) The user shall submit a progress report to the city manager no later than 14 days following each date in the schedule and the final date of compliance including, at a minimum, whether user complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and
(D) In no event shall more than nine months elapse between such progress reports to the city manager.
(`64 Code, Sec. 25-50) (Ord. No. 2494)
SEC. 19-73. REPORT ON COMPLIANCE WITH CATEGORICAL PRETREATMENT STANDARD DEADLINE.
Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the system, any user subject to such pretreatment standards and requirements shall submit to the city manager a report containing the information described in section 19-71(C)(4) through (6). For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR Part 403.6(c), this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with section 19-55 of this article.
(`64 Code, Sec. 25-51) (Ord. No. 2494)
SEC. 19-74. PERIODIC COMPLIANCE REPORTS.
(A) All significant industrial users shall, at a frequency determined by the city manager, but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge that are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a BMP or pollution prevention alternative, the user must submit documentation required by the city manager of the pretreatment standard necessary to determine the compliance status of the user. All periodic compliance reports must be signed and certified in accordance with section 19-55 of this article.
(B) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.
(C) If a user, subject to the reporting requirement in this section, monitors any pollutant more frequently than required by the city manager, using the procedures prescribed in section 19-79 of this article, the results of this monitoring shall be included in the report sent to the city manager.
(`64 Code, Sec. 25-52) (Ord. No. 2494, 2761)
SEC. 19-75. REPORT OF CHANGED CONDITIONS.
(A) Each user shall notify the city manager of any planned significant changes to the user's operations or system which might alter the nature, quality or volume of its wastewater at least 30 days before the change.
(B) The city manager may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of an IWD permit application under sections or 19-54 or 19-55 of this article, if necessary.
(C) The city manager may issue an IWD permit under section19-56 of this article, or modify an existing IWD permit under section19-60 of this article in response to changed conditions or anticipated changed conditions.
(D) For purposes of this section, significant changes include, but are not limited to, flow increases of 25% or greater, and the discharge of any previously unreported pollutants.
(E) (1) An IU shall notify the POTW, the EPA Regional Waste Management Division Director, and State hazardous waste authorities in writing of any discharge into the POTW of a substance, which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must inlcude the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the IU discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent such information is known and readily available to the IU: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. All notifications must take place within 180 days after the effective date of this rule. Industrial users who commence discharging after the effective date of this rule shall provide the notification no later than 180 days after the discharge of the listed or characteristic hazardous waste. Any notification under this subsection need by submitted only once for each hazardous waste discharged. However, notifications of changed discharges must be submitted under 40 CFR 403.12(j). The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements of 40 CFR 403.12(b), (d), and (e).
(2) Dischargers are exempt from the requirements of subsection (E)(1) of this section during a calendar month in which they discharge no more than 15 kilograms
of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of non- acute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the IU discharges more than such quantities of any hazardous waste do not require additional notification.
(3) In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a
hazardous waste, the IU must notify the POTW, the EPA Regional Waste Management Waste Division Director, and State hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations.
(4) In the case of any notification made under subsection (E) of this section, the IU shall certify that it has a program in place to reduce the volume and toxicity of
hazardous wastes generated to the degree it has determined to be economically practical.
(`64 Code, Sec. 25-53) (Ord. No. 2494, 2875)
SEC. 19-76. REPORTS OF POTENTIAL PROBLEMS.
(A) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, or a slug load, which may cause potential problems for the system, the user shall immediately telephone and notify the city manager of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user.
(B) Within five days following such discharge, the user shall, unless this requirement is waived by the city manager, submit a detailed written report describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability that may be incurred as a result of damage to the system, natural resources, or any other damage to person or property, nor shall such notification relieve the user of any fines, penalties, or other liability that may be imposed by this article or any other applicable provision of federal, State or local law.
(C) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in subsection (A) above. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification procedure.
(D) Significant industrial users are required to notify the city manager immediately of any changes at its facility affecting the potential for a slug discharge.
(`64 Code, Sec. 25-54) (Ord. No. 2494, 2761)
SEC. 19-77. REPORTS FROM UNPERMITTED USERS.
All users not required to obtain an IWD permit shall provide appropriate reports as the city manager may require.
(`64 Code, Sec. 25-55) (Ord. No. 2494)
SEC. 19-78. NOTICE OF VIOLATION; REPEAT SAMPLING AND REPORTING.
If a user's sampling indicates a violation, the user shall notify the city manager within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the city manager within 30 days after becoming aware of the violation. The user is not required to resample if the city manager conducts monitoring at the user's facility at least once a month, or if the city manager samples between the user's initial sampling and when the user receives the results of this sampling. If the city performed the sampling and analysis in lieu of the industrial user, the city will perform the repeat sampling and analysis unless the city notifies the industrial user of the violation and requires the user to perform the repeat sampling and analysis.
(`64 Code, Sec. 25-56) (Ord. No. 2494, 2761)
SEC. 19-79. ANALYTICAL REQUIREMENTS.
All pollutant analyses, including sampling techniques, to be submitted as part of an IWD permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses shall be performed in accordance with procedures approved by the EPA.
(`64 Code, Sec. 25-57) (Ord. No. 2494)
SEC. 19-80. SAMPLE COLLECTION.
(A) Except as indicated in subsection (B) below, the user shall collect wastewater samples using flow proportional composite collection techniques. In the event flow proportional sampling is infeasible, the city manager may authorize the use of time proportional sampling. Where time-proportional composite sampling or grab sampling is authorized by the city manager, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the
laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the city manager, as appropriate. In addition, grab samples may be required to show compliance with instantaneous discharge limits.
(B) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds shall be obtained using grab collection techniques.
(C) For sampling required in support of baseline monitoring and 90-day compliance reports required in section19-71 and 19-73 (40 CFR 403.12(b) and (d)), a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the city manager may authorize a lower minimum. For the reports required by section 19-74 (40 CFR 403.12(e) and 403.12(h)), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance by with applicable pretreatment standards and requirements.
historical sampling data do not exist; for facilities for which historical sampling data are available, the city manager may authorize a lower minimum. For the reports required by section 19-74 (40 CFR 403.12(e) and 403.12(h)), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance by with applicable pretreatment standards and requirements.
(D) Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula of 40 CFR 403.6(e) in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to the city.
(`64 Code, Sec. 25-58) (Ord. No. 2494, 2761, 2875)
SEC. 19-81. MONITORING CHARGES.
The city manager may recover the city's expenses incurred in collecting and analyzing samples of the user's discharge and may collect such charges in the manner specified in division 11 of this article.
(`64 Code, Sec. 25-59) (Ord. No. 2494)
SEC. 19-82. TIMING.
Written reports, applications, notices, and all mailings shall be deemed to have been submitted on the date postmarked. For reports that are not mailed, postage prepaid, into a mail facility serviced by the United States mail, the date of receipt of the report shall govern.
(`64 Code, Sec. 25-60) (Ord. No. 2494)
SEC. 19-83. RECORD KEEPING.
Users subject to the reporting requirements of this article shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this article and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with BMPs established under section 19-26(C). Records shall include the date, exact place, method, and time of sampling and the name of the person taking the samples, the dates analyses were performed, who performed the analyses, the analytical techniques or methods used, and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the city or where the user has been specifically notified of a longer retention period by the city manager.
(`64 Code, Sec. 25-61) (Ord. No. 2494, 2761)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Oxnard Municipal Code
- Article I — GENERAL PROVISIONS
- Article II — UTILITY BILLING HEARINGS; CRIMINAL VIOLATIONS OF …
- Article III — JUDICIAL REVIEW
- Article IV — MUNICIPAL ELECTIONS
- Article V — ADMINISTRATIVE HEARINGS
- Article II — UTILITY BILLING HEARINGS; CRIMINAL VIOLATIONS OF …
- Article III — JUDICIAL REVIEW
- Article IV — MUNICIPAL ELECTIONS
- Article V — ADMINISTRATIVE HEARINGS
- Article I — LEGISLATIVE BODIES
- Division 1 — GENERAL PROVISIONS
- Division 2 — CITIZEN ADVISORY GROUPS; GENERAL
- Division 3 — SENIOR SERVICES COMMISSION
- Division 4 — COMMUNITY RELATIONS COMMISSION
- Division 5 — LIBRARY BOARD
- Division 6 — PARKS AND RECREATION AND COMMUNITY SERVICES COMMI…
- Division 7 — PLANNING COMMISSION
- Division 8 — RELOCATION APPEALS BOARD
- Division 9 — YOUTH COMMISSION
- Division 10 — COMMISSION ON HOMELESSNESS
- Division 11 — CULTURAL ARTS COMMISSION
- Division 1 — CITY ATTORNEY
- Division 2 — CITY CLERK
- Division 3 — CITY MANAGER
- Division 4 — CITY TREASURER
- Division 5 — DIRECTOR FINANCE DEPARTMENT
- Division 6 — FIRE
- Division 7 — POLICE DEPARTMENT
- Article IV — SUNSHINE ORDINANCE
- Article V — TRANSPARENCY IN PUBLIC CONTRACTS AND FINANCIAL REP…
- Article VI — CAMPAIGN FINANCE REFORMS
- Article VII — PROHIBITION ON ACCEPTANCE OF GIFTS FROM CITY CON…
- Article VIII — PROHIBITION OF CITY SUBSIDY OF COMMUNITY FACILI…
- Division 1 — CITY COUNCIL
- Division 2 — COMMUNITY DEVELOPMENT COMMISSION
- Division 3 — HOUSING AUTHORITY
- Division 4 — REDEVELOPMENT AGENCY
- Article II — COMMISSIONS/COMMITTEES
- Division 2 — CITIZEN ADVISORY GROUPS; GENERAL
- Division 3 — SENIOR SERVICES COMMISSION
- Division 4 — COMMUNITY RELATIONS COMMISSION
- Division 5 — LIBRARY BOARD
- Division 6 — PARKS AND RECREATION AND COMMUNITY SERVICES COMMI…
- Division 7 — PLANNING COMMISSION
- Division 8 — RELOCATION APPEALS BOARD
- Division 9 — YOUTH COMMISSION
- Division 10 — COMMISSION ON HOMELESSNESS
- Division 11 — CULTURAL ARTS COMMISSION
- Division I — CITY ATTORNEY
- Division 2 — CITY CLERK
- Division 3 — CITY MANAGER
- Division 4 — CITY TREASURER
- Division 5 — DIRECTOR OF FINANCE
- Division 6 — FIRE
- Division 7 — POLICE DEPARTMENT
- Article IV — SUNSHINE ORDINANCE
- Article V — TRANSPARENCY IN PUBLIC CONTRACTS AND
- Article VI — CAMPAIGN FINANCE REFORMS
- Article VII — PROHIBITION ON ACCEPTANCE OF GIFTS FROM
- Article VIII — PROHIBITION OF CITY SUBSIDY OF COMMUNITY FACILI…
- Article II — EMPLOYER-EMPLOYEE RELATIONS
- Article III — EMPLOYER-EMPLOYEE RELATIONS FOR NON-FIRE AND NON…
- Article II — EMPLOYER-EMPLOYEE RELATIONS
- Article III — EMPLOYER-EMPLOYEE RELATIONS FOR NON-FIRE AND NON-
- Article I — CITYWIDE PURCHASING SYSTEM POLICY
- Article II — PUBLIC PROJECTS
- Article III — CONTRACTING FOR PROFESSIONAL SERVICES
- Article IV — PURCHASING AND CONTRACTING FOR GOODS, SUPPLIES, E…
- Article V — ADDITIONAL PURCHASING AND CONTRACT PROCEDURES
- Article I — CITYWIDE PURCHASING SYSTEM POLICY
- Article II — PUBLIC PROJECTS
- Article III — CONTRACTING FOR PROFESSIONAL SERVICES
- Article IV — PURCHASING AND CONTRACTING FOR GOODS, SUPPLIES,
- Article V — ADDITIONAL PURCHASING AND CONTRACT PROCEDURES
- Division 1 — GENERALLY
- Division 2 — DOMESTICATED ANIMALS
- Article II — DOGS AND CATS
- Division 2 — LICENSING
- Division 3 — RABIES VACCINATION
- Article III — IMPOUNDMENT
- Article IV — WILD ANIMAL CONTROL
- Article I — DOMESTICATED ANIMAL CONTROL
- Division 2 — DOMESTICATED ANIMALS
- Article II — DOGS AND CATS
- Division 2 — LICENSING
- Division 3 — RABIES VACCINATION
- Article III — IMPOUNDMENT
- Article IV — WILD ANIMAL CONTROL
- Article II — ABANDONED MOTOR VEHICLES
- Article III — CIVIL FINES AND PROPERTY DISPOSAL
- Article IV — CURFEW
- Article V — GRAFFITI
- Article VI — LARGE PARTIES, GATHERINGS OR ASSEMBLAGES ON PRIVA…
- Article VII — NEWSRACKS
- Article VIII — OFFENSES
- Article IX — PROPERTY CONSERVATION
- Article X — SHOPPING CARTS
- Article XI — SOUND REGULATION
- Division 1 — IN GENERAL
- Division 2 — REGULATION OF VESSELS
- Division 3 — REGULATION OF CONDUCT
- Article XIII — GRANDFATHERED ESTABLISHMENTS SELLING ALCOHOLIC …
- Article XIV — REGULATION OF PRIVATE PATROL OPERATORS, PROPRIET…
- Article XV — PUBLIC LIBRARY RULES OF CONDUCT AND EXCLUSION PRO…
- Article XVII — REGULATION OF SMOKING
- Article XVIII — ORMOND BEACH REGULATIONS
- Article XIX — RECORDING NOTICES OF VIOLATIONS
- Article XX — REGULATIONS ON CAMPING
- Article XXI — PARK AND PARK FACILITY EXCLUSION
- Article XXII — PROHIBITION ON AGGRESSIVE PANHANDLING AND SOLIC…
- Article XXIII — BRIDGE JUMPING PROHIBITED
- Article XXIV — SINGLE-USE FOODWARE ACCESSORIES AND STANDARD CO…
- Article XXV — PROHIBITION OF DESIGNATED EXPANDED POLYSTYRENE P…
- Article XXVI — ELECTION SIGNS
- Article XXVII — REGULATION OF NITROUS OXIDE
- Article XXVIII — CITY SKATEBOARD PARK REGULATIONS
- Article II — ABANDONED MOTOR VEHICLES
- Article III — CIVIL FINES AND PROPERTY DISPOSAL
- Article IV — CURFEW
- Article V — GRAFFITI
- Article VI — LARGE PARTIES, GATHERINGS OR ASSEMBLAGES ON
- Article VII — NEWSRACKS
- Article VIII — OFFENSES
- Article IX — PROPERTY CONSERVATION
- Article X — SHOPPING CARTS
- Article XI — SOUND REGULATION
- Article XII — INLAND WATERWAYS
- Division 2 — REGULATION OF VESSELS
- Division 3 — REGULATION OF CONDUCT
- Article XIII — GRANDFATHERED ESTABLISHMENTS SELLING ALCOHOLIC
- Article XIV — REGULATION OF PRIVATE PATROL OPERATORS,
- Article XV — PUBLIC LIBRARY RULES OF CONDUCT AND EXCLUSION
- Article XVI — RESERVED
- Article XVII — REGULATION OF SMOKING
- Article XVIII — ORMOND BEACH REGULATIONS
- Article XIX — RECORDING NOTICES OF VIOLATIONS
- Article XX — REGULATIONS ON CAMPING
- Article XXI — PARK AND PARK FACILITY EXCLUSION
- Article XXII — PROHIBITION ON AGGRESSIVE PANHANDLING
- Article XXIII — BRIDGE JUMPING PROHIBITED
- Article XXIV — SINGLE-USE FOODWARE ACCESSORIES AND STANDARD
- Article XXV — PROHIBITION OF DESIGNATED EXPANDED POLYSTYRENE P…
- Article XXVI — ELECTION SIGNS
- Article XXVII — REGULATION OF NITROUS OXIDE
- Article XXVIII — CITY SKATEBOARD PARK REGULATIONS
- Article II — CRUISING
- Article III — MOTOR VEHICLES/MOTORCYCLES ON PRIVATE OR PUBLIC …
- Article IV — PARKING
- Division 2 — VIOLATION
- Division 3 — PRIVATE PARKING
- Article V — DUTIES OF POLICE OFFICERS AND TRAFFIC ENGINEER
- Article VI — TOWING SERVICES
- Article VII — AMBULANCES
- Article II — CRUISING
- Article III — MOTOR VEHICLES/MOTORCYCLES ON PRIVATE OR PUBLIC
- Article IV — PARKING
- Division 2 — VIOLATION
- Division 3 — PRIVATE PARKING
- Article V — DUTIES OF POLICE OFFICERS AND TRAFFIC ENGINEER
- Article VI — TOWING SERVICES
- Article VII — AMBULANCES
- Article II — BENCHES
- Article II — BENCHES
- Article I — BUSINESS TAX CERTIFICATES
- Division 2 — RATES
- Division 3 — PEDDLERS, CANVASSERS AND SOLICITORS
- Division 4 — RULES AND ENFORCEMENT
- Division 1 — SECURITY ALARMS (POLICE)
- Division 2 — ALARM SYSTEM PERMITS
- Division 3 — SECURITY ALARM SYSTEM STANDARDS
- Division 4 — EXCESSIVE FALSE ALARMS
- Division 5 — SUSPENSION OR REVOCATION OF SECURITY ALARM PERMIT
- Division 6 — ENFORCEMENT
- Division 7 — CONFIDENTIALITY
- Division 8 — GOVERNMENT IMMUNITY
- Division 9 — FIRE ALARMS
- Article III — ARCADES
- Article IV — DANCE PERMIT PROCEDURES
- Article V — DANCES
- Article VI — ENTERTAINMENT
- Article VII — FILMING
- Article VIII — PERMITS TO SELL FIREARMS
- Article IX — MASSAGE
- Article X — POOL HALLS
- Article XI — TAXICABS
- Article XII — JOLLY JUMPS
- Division 1 — UNIFIED PROGRAM GENERAL PROVISIONS
- Division 2 — HAZARDOUS WASTE CONTROL
- Division 3 — HAZARDOUS WASTE ON-SITE TREATMENT
- Division 4 — HAZARDOUS MATERIALS RELEASE RESPONSE PLANS AND IN…
- Division 5 — UNDERGROUND STORAGE OF HAZARDOUS SUBSTANCES
- Division 6 — ABOVEGROUND STORAGE OF PETROLEUM
- Article XIV — TOBACCO RETAILERS
- Article XVI — CANNABIS BUSINESS TAX
- Article XVII — COMMERCIAL CANNABIS ACTIVITY
- Article I — BUSINESS TAX CERTIFICATES
- Division 2 — RATES
- Division 3 — PEDDLERS, CANVASSERS AND SOLICITORS
- Division 4 — RULES AND ENFORCEMENT
- Division 1 — SECURITY ALARMS (POLICE)
- Division 2 — ALARM SYSTEM PERMITS
- Division 3 — SECURITY ALARM SYSTEM STANDARDS
- Division 4 — EXCESSIVE FALSE ALARMS
- Division 5 — SUSPENSION OR REVOCATION OF SECURITY ALARM PERMIT
- Division 7 — CONFIDENTIALITY
- Division 8 — GOVERNMENT IMMUNITY
- Division 9 — FIRE ALARMS
- Article III — ARCADES
- Article IV — DANCE PERMIT PROCEDURES
- Article V — DANCES
- Article VI — ENTERTAINMENT
- Article VII — FILMING
- Article VIII — PERMITS TO SELL FIREARMS
- Article IX — MASSAGE
- Article X — POOL HALLS
- Article XI — TAXICABS
- Article XII — JOLLY JUMPS
- Division 1 — UNIFIED PROGRAM GENERAL PROVISIONS
- Division 2 — HAZARDOUS WASTE CONTROL
- Division 3 — HAZARDOUS WASTE ON-SITE TREATMENT
- Division 4 — HAZARDOUS MATERIALS RELEASE RESPONSE PLANS AND IN…
- Division 5 — UNDERGROUND STORAGE OF HAZARDOUS SUBSTANCES
- Division 6 — ABOVEGROUND STORAGE OF PETROLEUM
- Article XIV — TOBACCO RETAILERS
- Article XV — RESERVED
- Article XVI — CANNABIS BUSINESS TAX
- Article XVII — COMMERCIAL CANNABIS ACTIVITY
- Article I — OXNARD COMPLIANCE FEES
- Article I — A. OXNARD TOURISM MARKETING DISTRICT
- Article II — TRANSIENT OCCUPANCY TAX
- Article III — TAX FOR PURPOSE OF PARKS, MUSIC AND ADVERTISING
- Article IV — PARK AND ACQUISITION AND DEVELOPMENT TAX
- Article V — WATER AND STREET FUNDS
- Article I — OXNARD COMPLIANCE FEES
- Article I — A. OXNARD TOURISM MARKETING DISTRICT
- Article II — TRANSIENT OCCUPANCY TAX
- Article III — TAX FOR PURPOSE OF PARKS, MUSIC AND ADVERTISING
- Article IV — PARK ACQUISITION AND DEVELOPMENT TAX
- Article V — WATER AND STREET FUNDS
- Article II — CALIFORNIA BUILDING CODE
- Article III — CALIFORNIA RESIDENTIAL CODE
- Article IV — CALIFORNIA GREEN BUILDING STANDARDS CODE
- Article VI — CALIFORNIA HISTORICAL BUILDING CODE
- Article VII — CALIFORNIA ELECTRICAL CODE
- Article VIII — CALIFORNIA EXISTING BUILDING CODE
- Article IX — CALIFORNIA MECHANICAL CODE
- Article X — CALIFORNIA REFERENCED STANDARDS CODE
- Article XI — CALIFORNIA PLUMBING CODE
- Article XII — CALIFORNIA ENERGY CODE
- Article XV — CALIFORNIA FIRE CODE
- Article XVI — FIRE SPRINKLERS
- Article XIX — FIRE HAZARD SEVERITY ZONE MAPS
- Article XX — REPORT OF BUILDING RECORDS
- Article XXI — MOVING OF BUILDINGS
- Article XXII — SWIMMING POOL PROVISIONS
- Article XXIII — BEACH CONSTRUCTION
- Article XXIV — SMALL RESIDENTIAL ROOFTOP SOLAR SYSTEMS
- Article XXV — ELECTRIC VEHICLE CHARGING STATION PERMITTING
- Article XXVI — TENANT RELOCATION ASSISTANCE
- Article XXVII — SAFE HOMES SAFE FAMILIES REPEAT OFFENDER PROGRAM
- Article XXVIII — SUBSTANDARD AND IMPROPER OCCUPANCY CONDITIONS
- Article XXIX — PROPERTY MAINTENANCE AND ABATEMENT CODES
- Article II — CALIFORNIA BUILDING CODE
- Article III — CALIFORNIA RESIDENTIAL CODE
- Article IV — CALIFORNIA GREEN BUILDING
- Article V — RESERVED
- Article VI — CALIFORNIA HISTORICAL BUILDING CODE
- Article VII — CALIFORNIA ELECTRICAL CODE
- Article VIII — CALIFORNIA EXISTING BUILDING CODE
- Article IX — CALIFORNIA MECHANICAL CODE
- Article X — CALIFORNIA REFERENCED STANDARDS CODE
- Article XI — CALIFORNIA PLUMBING CODE
- Article XII — CALIFORNIA ENERGY CODE
- Article XIII — CALIFORNIA WILDLAND-URBAN
- Article XV — CALIFORNIA FIRE CODE
- Article XVI — FIRE SPRINKLERS
- Article XIX — FIRE HAZARD SEVERITY ZONE MAPS
- Article XX — REPORT OF BUILDING RECORDS
- Article XXI — MOVING OF BUILDINGS
- Article XXII — SWIMMING POOL PROVISIONS
- Article XXIII — BEACH CONSTRUCTION
- Article XXIV — SMALL RESIDENTIAL ROOFTOP SOLAR SYSTEMS
- Article XXV — ELECTRIC VEHICLE CHARGING STATION PERMITTING
- Article XXVI — TENANT RELOCATION ASSISTANCE
- Article XXVII — SAFE HOMES SAFE FAMILIES REPEAT OFFENDER
- Article XXVIII — SUBSTANDARD AND IMPROPER OCCUPANCY CONDITIONS
- Article XXIX — PROPERTY MAINTENANCE AND ABATEMENT CODES
- Article II — MAPS
- Division 2 — SUBDIVISION AND PARCEL MAPS
- Article III — PROCEDURES
- Division 2 — TENTATIVE SUBDIVISION MAPS
- Division 3 — FINAL MAPS AND PARCEL MAPS
- Division 4 — REQUIREMENTS OF APPROVAL
- Division 5 — DEVELOPMENT PLAN REVIEW
- Division 1 — PUBLIC EASEMENTS
- Division 2 — CONTRIBUTION OF PARK SITES
- Division 3 — RESERVATION OF SITES
- Division 4 — SCHOOL FACILITIES
- Division 1 — REQUIRED IMPROVEMENTS
- Division 2 — STANDARDS
- Article VI — DEVELOPMENT FEE PROCEDURES
- Division 2 — PLANNED DRAINAGE FACILITIES FEES
- Division 3 — PLANNED WASTEWATER FACILITIES FEES
- Division 4 — PLANNED WATER FACILITIES FEES
- Division 5 — PLANNED TRAFFIC CIRCULATION FACILITIES FEES
- Division 6 — GROWTH REQUIREMENT CAPITAL FEES
- Division 7 — BRIDGE AND THOROUGHFARE FEES
- Division 8 — MOBILITY FEES
- Article VII — SOIL REPORTS
- Article VIII — REVERSION TO ACREAGE
- Article IX — IMPROVEMENT AGREEMENTS
- Article X — SECURITY AND SECURITY RELEASE
- Article XI — EFFECT OF APPROVALS
- Article II — MAPS
- Division 2 — SUBDIVISION AND PARCEL MAPS
- Article III — PROCEDURES
- Division 2 — TENTATIVE SUBDIVISION MAPS
- Division 3 — FINAL MAPS AND PARCEL MAPS
- Division 4 — REQUIREMENTS OF APPROVAL
- Division 5 — DEVELOPMENT PLAN REVIEW
- Division 1 — PUBLIC EASEMENTS
- Division 2 — CONTRIBUTION OF PARK SITES
- Division 3 — RESERVATION OF SITES
- Division 4 — SCHOOL FACILITIES
- Division 1 — REQUIRED IMPROVEMENTS
- Division 2 — STANDARDS
- Article VI — DEVELOPMENT FEE PROCEDURES
- Division 2 — PLANNED DRAINAGE FACILITIES FEES
- Division 3 — PLANNED WASTEWATER FACILITIES FEES
- Division 4 — PLANNED WATER FACILITIES FEES
- Division 5 — PLANNED TRAFFIC CIRCULATION FACILITIES FEES
- Division 6 — GROWTH REQUIREMENT CAPITAL FEES
- Division 7 — BRIDGE AND THOROUGHFARE FEES
- Division 8 — MOBILITY FEES
- Article VII — SOIL REPORTS
- Article VIII — REVERSION TO ACREAGE
- Article IX — IMPROVEMENT AGREEMENTS
- Article X — SECURITY AND SECURITY RELEASE
- Article XI — EFFECT OF APPROVALS
- Article II — DEFINITIONS
- Article III — ZONES, USES AND REQUIREMENTS
- Division 2 — RESIDENTIAL ZONES
- Division 7 — COMMERCIAL ZONES
- Division 10 — DOWNTOWN ZONES
- Division 11 — INDUSTRIAL ZONES
- Division 17 — PLANNED DEVELOPMENT (ADDITIVE) ZONE
- Division 18 — LOT SIZE ADDITIVE
- Division 19 — AIRPORT HAZARD OVERLAY ZONE
- Division 1 — GENERAL REQUIREMENTS
- Division 2 — PROHIBITIONS
- Division 1 — ADULT BUSINESSES
- Division 2 — ATTACHED DWELLING UNIT DEVELOPMENT STANDARDS
- Division 3 — BED AND BREAKFAST USES
- Division 4 — COMMUNITY HOUSING CONVERSIONS
- Division 5 — COMMUNITY OWNERSHIP UNITS
- Division 6 — HOME OCCUPATIONS
- Division 7A — DENSITY BONUS AND RELATED INCENTIVES AND CONCESS…
- Division 7C — AFFORDABLE HOUSING -AHP AND -AHD ADDITIVE ZONES
- Division 8 — INCENTIVES TO CONVERT APARTMENTS TO AFFORDABLE CO…
- Division 9 — LARGE FAMILY DAY CARE HOMES
- Division 10 — SINGLE ROOM OCCUPANCY
- Division 11 — PLANNED RESIDENTIAL GROUPS
- Division 12 — RESIDENTIAL PLANNED UNIT DEVELOPMENTS
- Division 13 — ACCESSORY DWELLING UNITS
- Division 14 — SIGNIFICANT HERITAGE FEATURES
- Division 15 — TEMPORARY USES
- Division 16 — WIRELESS COMMUNICATION FACILITIES
- Division 17 — REASONABLE ACCOMMODATION
- Division 18 — EMERGENCY SHELTERS
- Division 19 — FIREARM AND AMMUNITION SALES
- Division 20 — FIREARM RANGES
- Article VI — NONCONFORMING USES
- Division 1 — ZONE CLEARANCE PERMIT
- Division 1A — SITE PLAN REVIEW PERMIT
- Division 2 — DEVELOPMENT DESIGN REVIEW PERMIT
- Division 3 — SPECIAL USE PERMIT
- Division 4 — MODIFICATIONS TO PLANNING PERMITS
- Division 5 — VARIANCES
- Article VIII — CHANGE OF BOUNDARIES AND USES
- Article IX — ADVERTISING SIGNS
- Division 2 — PERMITS AND SPECIFICATIONS
- Division 3 — SIGN REGULATIONS IN SPECIFIC ZONES
- Division 4 — SIGN REGULATIONS APPLICABLE TO ALL ZONES
- Division 1 — GENERAL
- Division 2 — PARKING SPACE AND LOADING REQUIREMENTS
- Division 3 — VEHICLE TRIP REDUCTION
- Division 4 — PARKING AREA DESIGN
- Division 5 — RELIEF FROM PARKING REQUIREMENTS
- Article XI — SHORT-TERM RENTAL UNITS
- Article III — ZONES, USES AND REQUIREMENTS
- Division 2 — RESIDENTIAL ZONES
- Division 7 — COMMERCIAL ZONES
- Division 10 — DOWNTOWN ZONES
- Division 11 — INDUSTRIAL ZONES
- Division 11 — DIVISION 16. C-R COMMUNITY RESERVE ZONE
- Division 17 — PLANNED DEVELOPMENT (ADDITIVE) ZONE
- Division 18 — LOT SIZE ADDITIVE
- Division 19 — AIRPORT HAZARD OVERLAY ZONE
- Division 1 — GENERAL REQUIREMENTS
- Division 2 — PROHIBITIONS
- Division 1 — ADULT BUSINESSES
- Division 2 — ATTACHED DWELLING UNIT DEVELOPMENT STANDARDS
- Division 3 — BED AND BREAKFAST USES
- Division 4 — COMMUNITY HOUSING CONVERSIONS
- Division 5 — COMMUNITY OWNERSHIP UNITS
- Division 6 — HOME OCCUPATIONS
- Division 7A — DENSITY BONUS AND RELATED INCENTIVES AND CONCESS…
- Division 7C — AFFORDABLE HOUSING -AHP AND -AHD ADDITIVE ZONES
- Division 8 — INCENTIVES TO CONVERT APARTMENTS TO AFFORDABLE CO…
- Division 9 — LARGE FAMILY DAY CARE HOMES
- Division 10 — SINGLE ROOM OCCUPANCY.
- Division 11 — PLANNED RESIDENTIAL GROUPS
- Division 12 — RESIDENTIAL PLANNED UNIT DEVELOPMENTS
- Division 13 — ACCESSORY DWELLING UNITS
- Division 14 — SIGNIFICANT HERITAGE FEATURES
- Division 15 — TEMPORARY USES
- Division 16 — WIRELESS COMMUNICATION FACILITIES
- Division 17 — REASONABLE ACCOMMODATION
- Division 18 — EMERGENCY SHELTERS
- Division 19 — FIREARM AND AMMUNITION SALES
- Division 20 — FIREARM RANGES
- Article VI — NONCONFORMING USES
- Division 1 — ZONE CLEARANCE PERMIT
- Division 1A — SITE PLAN REVIEW PERMIT
- Division 2 — DEVELOPMENT DESIGN REVIEW PERMIT
- Division 3 — SPECIAL USE PERMIT
- Division 4 — MODIFICATIONS TO PLANNING PERMITS
- Division 5 — VARIANCES
- Article VIII — CHANGE OF BOUNDARIES AND USES
- Article IX — ADVERTISING SIGNS
- Division 2 — PERMITS AND SPECIFICATIONS
- Division 3 — SIGN REGULATIONS IN SPECIFIC ZONES
- Division 4 — SIGN REGULATIONS APPLICABLE TO ALL ZONES
- Division 1 — GENERAL
- Division 2 — PARKING SPACE AND LOADING REQUIREMENTS
- Division 3 — VEHICLE TRIP REDUCTION
- Division 4 — PARKING AREA DESIGN
- Division 5 — RELIEF FROM PARKING REQUIREMENTS
- Article XI — SHORT-TERM RENTAL UNITS
- Article II — COASTAL SUB-ZONES
- Article III — SPECIFIC COASTAL DEVELOPMENT AND RESOURCE STANDA…
- Article IV — GENERAL COASTAL DEVELOPMENT AND RESOURCE STANDARDS
- Article V — ADMINISTRATION
- Article VI — TRANSFER OF DEVELOPMENT RIGHTS
- Article II — COASTAL SUB-ZONES
- Article III — SPECIFIC COASTAL DEVELOPMENT AND RESOURCE
- Article IV — GENERAL COASTAL DEVELOPMENT AND RESOURCE
- Article V — ADMINISTRATION
- Article VI — TRANSFER OF DEVELOPMENT RIGHTS
- Article II — ADMINISTRATION
- Article III — PERMIT, APPEAL AND VARIANCE PROCEDURES
- Article IV — PROVISIONS FOR FLOOD HAZARD REDUCTION
- Article II — ADMINISTRATION
- Article III — PERMIT, APPEAL AND VARIANCE PROCEDURES
- Article IV — PROVISIONS FOR FLOOD HAZARD REDUCTION
- Article I — SEWERAGE SYSTEM; WASTEWATER DISPOSAL
- Division 2 — WASTEWATER COLLECTION/CONVEYANCE SYSTEM
- Division 3 — WASTEWATER INTRODUCTION INTO THE CITY'S MUNICIPAL…
- Division 4 — PRETREATMENT OF INDUSTRIAL WASTEWATER
- Division 5 — INDUSTRIAL WASTEWATER DISCHARGE PERMIT SYSTEM
- Division 6 — REPORTING REQUIREMENTS
- Division 7 — COMPLIANCE MONITORING
- Division 8 — ADMINISTRATIVE ENFORCEMENT REMEDIES
- Division 9 — JUDICIAL ENFORCEMENT REMEDIES
- Division 10 — SUPPLEMENTAL ENFORCEMENT ACTION
- Division 11 — MISCELLANEOUS PROVISIONS
- Article II — SOLID WASTE AND RECYCLING
- Division 2 — REMOVAL AND DISPOSAL OF SOLID WASTE
- Division 3 — COLLECTION AND CHARGES
- Division 4 — RECYCLABLE AND ORGANIC MATERIALS
- Division 5 — EXCLUDED WASTES, INCLUDING HAZARDOUS MATERIALS
- Division 7 — RATES AND FEES
- Division 1 — ENCROACHMENTS AND EXCAVATIONS
- Division 2 — STREET NUMBERING
- Division 3 — USE OF CITY STREETS AND HIGHWAYS BY OVERWEIGHT VE…
- Article I — SEWERAGE SYSTEM; WASTEWATER DISPOSAL
- Division 2 — WASTEWATER COLLECTION/CONVEYANCE SYSTEM
- Division 3 — WASTEWATER INTRODUCTION INTO THE CITY'S MUNICIPAL…
- Division 4 — PRETREATMENT OF INDUSTRIAL WASTEWATER
- Division 5 — INDUSTRIAL WASTEWATER DISCHARGE PERMIT SYSTEM
- Division 6 — REPORTING REQUIREMENTS
- Division 7 — COMPLIANCE MONITORING
- Division 8 — ADMINISTRATIVE ENFORCEMENT REMEDIES
- Division 9 — JUDICIAL ENFORCEMENT REMEDIES
- Division 10 — SUPPLEMENTAL ENFORCEMENT ACTION
- Division 11 — MISCELLANEOUS PROVISIONS
- Article II — SOLID WASTE AND RECYCLING
- Division 2 — REMOVAL AND DISPOSAL OF SOLID WASTE
- Division 3 — COLLECTION AND CHARGES
- Division 4 — RECYCLABLE AND ORGANIC MATERIALS
- Division 5 — EXCLUDED WASTES, INCLUDING HAZARDOUS MATERIALS
- Division 7 — RATES AND FEES
- Division 1 — ENCROACHMENTS AND EXCAVATIONS
- Division 2 — STREET NUMBERING
- Division 3 — USE OF CITY STREETS AND HIGHWAYS BY OVERWEIGHT VE…
- Article II — UNDERGROUND UTILITY DISTRICT FORMATION
- Article III — UNDERGROUND INSTALLATIONS FOR NEW CONSTRUCTION
- Article II — UNDERGROUND UTILITY DISTRICT FORMATION
- Article III — UNDERGROUND INSTALLATIONS FOR NEW CONSTRUCTION
- Article II — RENDERING WATER SERVICE
- Article III — RATES
- Article IV — CROSS-CONNECTIONS
- Article V — WATER MAINS
- Article VI — WATER RIGHTS AND WELLS
- Article VII — CONSTRUCTION, REPAIR, MODIFICATION AND DESTRUCTI…
- Article VIII — WATER WASTE
- Article IX — WATER CONSERVATION AND WATER SHORTAGE RESPONSE PR…
- Article X — RECYCLED WATER USE
- Article XI — ANNEXATION VERIFICATION
- Article II — RENDERING WATER SERVICE
- Article III — RATES
- Article IV — CROSS-CONNECTIONS
- Article V — WATER MAINS
- Article VI — WATER RIGHTS AND WELLS
- Article VII — CONSTRUCTION, REPAIR, MODIFICATION AND DESTRUCTION
- Article VIII — WATER WASTE
- Article IX — WATER CONSERVATION AND WATER SHORTAGE RESPONSE
- Article X — RECYCLED WATER USE
- Article XI — ANNEXATION VERIFICATION
- Article XII — STORM WATER QUALITY MANAGEMENT
- Article XIII — LANDSCAPE WATER CONSERVATION STANDARDS
- Article II — CABLE TELEVISION SYSTEMS
- Article III — OPEN VIDEO SYSTEMS
- Article IV — OTHER VIDEO AND TELECOMMUNICATIONS SERVICES AND S…
- Article V — DEFINITIONS
- Article VI — VIOLATIONS; SEVERABILITY
- Article II — CABLE TELEVISION SYSTEMS
- Article III — OPEN VIDEO SYSTEMS
- Article IV — OTHER VIDEO AND TELECOMMUNICATIONS SERVICES AND
- Article V — DEFINITIONS
- Article VI — VIOLATIONS; SEVERABILITY
- Article I — MOBILE HOME PARK RENT STABILIZATION SYSTEM
- Article II — MOBILE HOME PARK CLOSURES
- Article I — MOBILE HOME PARK RENT STABILIZATION SYSTEM
- Article II — MOBILE HOME PARK CLOSURES
- Article I — SURFACE MINING
- Article III — SURFACE MINING PERMITS
- Article IV — RECLAMATION PLANS
- Article V — FINANCIAL ASSURANCES
- Article VI — INTERIM MANAGEMENT PLANS
- Article VII — MISCELLANEOUS PROVISIONS
- Article I — SURFACE MINING
- Article III — SURFACE MINING PERMITS
- Article VI — RECLAMATION PLANS
- Article V — FINANCIAL ASSURANCES
- Article VI — INTERIM MANAGEMENT PLANS
- Article VII — MISCELLANEOUS PROVISIONS
- Article II — PERMIT SIMPLICITY ELIGIBILITY
- Article III — PERMIT SIMPLICITY CERTIFIED PROFESSIONALS
- Article IV — PERMIT SIMPLICITY PROJECT APPLICATION AND SUBMITTAL
- Article V — PERMIT SIMPLICITY PROGRAM AUDIT AND SUSPENSION OF …
- Article II — PERMIT SIMPLICITY ELIGIBILITY
- Article III — PERMIT SIMPLICITY CERTIFIED PROFESSIONALS
- Article IV — PERMIT SIMPLICITY PROJECT APPLICATION AND SUBMITTAL
- Article V — PERMIT SIMPLICITY PROGRAM AUDIT AND SUSPENSION OF
- Article I — JUST CAUSE EVICTIONS AND TENANT PROTECTION
- Article II — RENT STABILIZATION
- Article III — TENANT ANTI-HARASSMENT PROTECTIONS
- Article I — JUST CAUSE EVICTIONS AND TENANT PROTECTION
- Article II — RENT STABILIZATION
- Article III — TENANT ANTI-HARASSMENT PROTECTIONS