17.15.1 - Applicability and compliance.

The development standards set forth in this chapter apply to every use classification in every zoning district unless otherwise specifically provided. The Zoning Administrator may require evidence of ability to comply with development standards before issuing an entitlement.

(Ord. 99-5 § 2 Exh. A (part))

17.15.2 - Performance standards for all uses.

A.

Air Contaminants. Every use must comply with rules, regulations and standards of the Bay Area Air Quality Management District (BAAQMD). An applicant for a zoning approval or a use, activity or process requiring BAAQMD approval of a permit to construct, must file a copy of the BAAQMD permit with the Zoning Administrator. An applicant for a use, activity or process that requires BAAQMD approval of a permit to operate must file a copy of such permit with the Zoning Administrator within thirty (30) days of BAAQMD approval.

B.

Hazardous Materials, Combustibles and Explosives. Any use involving handling and storage of hazardous materials, combustibles and explosives that is subject to a permit under the fire code as adopted by the city, the County Hazardous Waste Management Plan (HWMP) or state law. In addition to the provisions contained within the County HWMP, the city adopts the following additional siting requirements for all hazardous waste facilities:

1.

Any application to establish a hazardous waste facility shall require an amendment to the Orinda general plan text and map to establish a land use designation which allows for such a facility; and

2.

A hazardous waste facility may not be located in an area which may adversely impact a drinking water reservoir, either directly or indirectly.

C.

Glare.

1.

From Glass. Mirror or highly reflective glass may not cover more than twenty (20) percent of a building surface visible from a street unless an applicant submits information demonstrating to the satisfaction of the Zoning Administrator that use of such glass will not significantly increase glare visible from an adjacent street and property or pose a hazard for moving vehicles.

2.

From Outdoor Lighting. Parking lot lighting must comply with Chapter 17.16 of this title. Security lighting may be indirect or diffused, or be shielded or directed away from an R district within one hundred (100) feet. Lighting for outdoor court or field games within three hundred (300) feet of an R district or Scenic Corridor requires approval of a use permit, processed in accordance with provisions of this title.

Table 17.15.2

Maximum Noise Standards By Zoning District

Zone of Property Receiving Noise Zone of Property Receiving Noise Maximum Decibel Noise Level (Ldn)1
R Residential Districts 60
D Downtown Districts 60
PS Public, Semi-Public and Utility District 60
PR Park and Recreation District 60
OS Open Space District 60
PD Planned Development and
SP Specific Plan Study Required

1 (Ldn is a measurement of day/night noise equivalent)

1.

Duration and Timing. The noise standards above shall be modified as follows to account for the effects of time and duration on the impact of noise levels:

a.

In R districts, the noise standard shall be five dB lower between ten p.m. and seven a.m.

b.

Noise that is produced for no more than a cumulative period of five minutes in any hour may exceed the standards above by five dB.

c.

Noise that is produced for no more than a cumulative period of one minute in any hour may exceed the standards above by ten dB.

2.

Zoning Administrator May Require Acoustic Study. The Zoning Administrator may require an acoustical study, prepared at the expense of an applicant or property owner, for any proposed project which could have, or create, a noise exposure greater than that deemed in conflict with the above standards. Complaints alleging project violation of noise standards shall be accompanied by a detailed account of the nature of the violation, including an assessment of the extent to which noise standards have been exceeded. An acoustical study and necessary noise-level mitigation shall be required for new multifamily residential or single-family residential projects involving four or more units, or commercial development (new construction involving at least five thousand (5,000) gross square feet) proposed within three hundred (300) feet of State Route 24 or adjacent to major arterials where project noise contours are sixty (60) dBA (Ldn) or more, consistent with the noise element of the general plan.

3.

Noise Measurement. Noise shall be measured at an appropriate distance from the source, sufficient to identify noise characteristics of the noise source and to determine compliance with the noise standards of this section, with a sound level meter, which meets the standards of the American National Standards Institute (ANSI Section S1.4-1979, Type 1 or Type 2). Noise levels shall be measured in decibels. The unit of measurement shall be designated as dB, weighted to an Ldn equivalent. A calibration check shall be made of the instrument at the time any noise measurement is made.

4.

Noise Attenuation Measures. The Zoning Administrator may require the incorporation into a project of any noise attenuation measures deemed necessary to ensure that noise standards are not exceeded.

5.

Appeals. Decisions of the Zoning Administrator concerning noise may be appealed to the Planning Commission in accord with Chapter 17.43.

D.

Swimming Pool Discharges. It is unlawful to discharge chemically treated water from a swimming pool to the storm drainage system or a watercourse unless all chemicals (including but not limited to chlorine and bromine) are undetectable before discharge occurs. Where practicable, swimming pool discharges shall be dispersed by approved infiltration methods into landscaped areas, lawns, soil, or other permeable surfaces so as not to create surface runoff or disposed of through the sanitary sewer system so long as a permit has been obtained for such disposal from the Central Contra Costa Sanitary District.

E.

Water Pollution. A person may not discharge and no use may result in the discharge of liquids of any kind into a public or private sewage system, watercourse, body of water, or the ground, except in compliance with applicable law and regulations (including National Pollutant Discharge and Elimination System requirements of Contra Costa County, and California Regional Water Quality Control Board, California Code of Regulations, Title 23, Chapter 3 and California Water Code, Division 7).

(Ord. 04-08 § 4; Ord. 04-03 § 4 (part); Ord. 99-5 § 2 Exh. A (part))

17.15.3 - Fences and retaining walls.

A.

General. Fences and retaining walls are permitted in every district and are allowed in conjunction with specific uses as provided in this section.

B.

Maximum Height. The height of a fence or retaining wall is measured from the point at which the fence posts, wall pilasters or wall footing intersects the ground on the lowest side of the wall or fence to the top

of the wall or fence directly above. Where a fence is built on top of a retaining wall, the fence height is measured from the point that the ground is retained by the wall. The maximum fence or retaining wall height in a required yard or setback area is as follows:

1.

R Districts. As regulated within Chapter 17.4 of this title.

2.

D Districts. The maximum height is six feet, except within the front yard, where it is three feet.

(Ord. 99-5 § 2 Exh. A (part))

17.15.4 - Height limitation at intersections.

Refer to following graphic entitled "Section 17.15.4 Graphic, Minimum Clearance Guidelines."

Section 17.15.4 Graphic

MINIMUM CLEARANCE GUIDELINES

==> picture [480 x 543] intentionally omitted <==

(Ord. 99-5 § 2 Exh. A (part))

17.15.5 - Construction across property lines.

No new development, including construction of accessory structures or building or structure repairs, shall be allowed which results in or otherwise perpetuates a structure's crossing one or more lot lines, unless a variance is obtained from the Planning Commission pursuant to the provision of Chapter 17.33 or unless the lots in question are first voluntarily merged by the property owner. If a variance is approved, a deed restriction shall be recorded which requires removal of the structure(s) in question or approval of a lot line

adjustment to correct the encroachment prior to sale of one lot separate from the other of the property. All development shall otherwise be required to adhere to the standards of the applicable zone.

(Ord. 02-03 § 15: Ord. 00-2 § 8; Ord. 99-5 § 2 Exh. A (part))

Chapter 17.16 - OFF-STREET PARKING AND LOADING

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Orinda Zoning Code
Orinda Zoning Code
  1. Title 17 — ZONING
  2. ▸Title 17 — ZONING
    Overview
    1. Chapter 17.1 — PURPOSE AND ORGANIZATION
    2. Chapter 17.2 — DEFINITIONS
    3. Chapter 17.3 — RESIDENTIAL DISTRICT BASE USE RESTRICTIONS
    4. Chapter 17.4 — RESIDENTIAL DISTRICT BASE DEVELOPMENT REGULATIONS
    5. Chapter 17.5 — RIDGELINE AND ENVIRONMENTAL PRESERVATION OVERLA…
    6. Chapter 17.6 — RESIDENTIAL FLOOR AREA
    7. Chapter 17.7 — RESIDENTIAL MINIMUM LOT SIZE AND HILLSIDE DEVEL…
    8. Chapter 17.8 — DOWNTOWN DISTRICTS
    9. Chapter 17.9 — PUBLIC, SEMI-PUBLIC AND UTILITY DISTRICT
    10. Chapter 17.10 — PARK AND RECREATION DISTRICT
    11. Chapter 17.11 — OPEN SPACE DISTRICT
    12. Chapter 17.12 — PLANNED DEVELOPMENT DISTRICT
    13. Chapter 17.13 — SPECIFIC PLAN DISTRICT
    14. Chapter 17.15 — DEVELOPMENT STANDARDS FOR ALL USES
    15. Chapter 17.16 — OFF-STREET PARKING AND LOADING
    16. Chapter 17.17 — LANDSCAPING
    17. Chapter 17.18 — SIGNS
    18. Chapter 17.19 — NONCONFORMING USES AND STRUCTURES
    19. Chapter 17.20 — LOT LINE ADJUSTMENTS AND VOLUNTARY LOT MERGERS
    20. Chapter 17.21 — TREE MANAGEMENT
    21. Chapter 17.22 — VIEW PRESERVATION
    22. Chapter 17.23 — SATELLITE ANTENNAS
    23. Chapter 17.24 — HERITAGE TREES
    24. Chapter 17.25 — HISTORIC LANDMARKS
    25. Chapter 17.30 — DESIGN REVIEW
    26. Chapter 17.31 — GENERAL USE PERMIT
    27. Chapter 17.32 — EXCEPTIONS
    28. Chapter 17.33 — VARIANCES
    29. Chapter 17.34 — WIRELESS COMMUNICATIONS FACILITY PERMIT
    30. Chapter 17.35 — ELEVATED DECK PERMIT
    31. Chapter 17.36 — COMMERCIAL USE PERMIT
    32. Chapter 17.37 — TEMPORARY EVENT PERMIT
    33. Chapter 17.38 — ZONING APPROVAL, DEMOLITION PERMIT, CITY ENGIN…
    34. Chapter 17.39 — NOISE CONTROL
    35. Chapter 17.49 — DISCLOSURE STATEMENT REQUIREMENT

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.