Skip to content

Title 16 — SUBDIVISIONS

Article 3 — Checking

Orinda Municipal Code · 2026-09 edition · updated 2026-09-29 · Orinda

16.28.240 - Prints required and fees.

The subdivider shall submit three sets of prints of the map and certificate sheet to the Public Works Department for checking purposes before the certificates on the original tracings are executed. The preliminary prints shall be accompanied by a current preliminary title report, furnished by the applicant and acceptable to the Public Works Department; by traverse sheets prepared by the subdivider's engineer, showing the mathematical closure of the subdivision's exterior boundaries; and by a checking fee as establish and adopted by the City Council from time to time by resolution. (CCCC§ 94-4.602)

16.28.250 - Error of closure in traverse.

The error of closure in traverse around the subdivision and around the interior lots or blocks shall not exceed one part in twenty thousand (20,000). (CCCC§ 94-4.604)

16.28.260 - Public Works Department action.

The Public Works Department, within ten working days, shall note the required corrections, if any, on one set of the preliminary prints and return them to the engineer or surveyor for revision of the maps. (CCCC§ 94-4.606)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Orinda Municipal Code
Orinda Municipal Code
  1. Title 1 — GENERAL PROVISIONS
  2. Title 2 — ADMINISTRATION AND PERSONNEL
  3. Title 3 — REVENUE AND FINANCE
  4. Title 5 — BUSINESS LICENSES AND REGULATIONS
  5. Title 6 — ANIMALS
  6. Title 8 — HEALTH AND SAFETY
  7. Title 9 — PUBLIC PEACE, MORALS AND WELFARE
  8. Title 10 — VEHICLES AND TRAFFIC
  9. Title 12 — STREETS, SIDEWALKS AND PUBLIC PLACES
  10. Title 13 — PUBLIC SERVICES
  11. Title 15 — BUILDINGS AND CONSTRUCTION
  12. ▸Title 16 — SUBDIVISIONS
  13. Title 17 — ZONING
  14. Title 18 — CLEAN WATER, DRAINAGE AND RELATED RIPARIAN HABITAT …
  15. Title 19 — CODE COMPLIANCE

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.