§ 7-85. Expedited Permit Review and Inspection Requirements. [Added 11-2-2015 by Ord.…
Oakdale Municipal Code · 2026-07 edition · updated 2026-09-27 · Oakdale
(a) The Building Division shall adopt an administrative, nondiscretionary review process to expedite the approval of small residential rooftop solar energy system applications within 30 days of adoption of this chapter. For an application for a small residential rooftop solar energy system that meets the requirements of the approved checklist and standard plan, the Building Division shall issue a building permit or other nondiscretionary permit within three business days. The Building Official may require an applicant to apply for a use permit if the Official finds, based on substantial evidence, that the solar energy system could have a specific, adverse impact upon the public health and safety. Such decisions may be appealed to the Planning Commission.
(b) Review of the application shall be limited to the Building Official's review of whether the applicant meets local, state and federal health and safety requirements.
(c) If a use permit is required, the Building Official may deny an application for the use permit if the Official makes written findings based upon substantive evidence in the record that the proposed installation would have a specific, adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. Such findings shall include the basis for the rejection of the potential feasible alternative for preventing the adverse impact. Such decisions may be appealed to the Planning Commission.
(d) Any condition imposed on an application shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost. The City shall use its best efforts to ensure that the selected method, condition, or mitigation meets the conditions of Civil Code Section 714(d)(1)(A)(B).
(e) If an application for a small residential rooftop solar energy system is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permitting shall be sent to the applicant for resubmission.
(f) Only one inspection shall be required and performed by the Building Division for small residential rooftop solar energy systems eligible for expedited review.
(g) The inspection shall be done in a timely manner and should include consolidated inspections. An inspection will be scheduled within two business days of a request.
(h) If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized but need not conform to the requirements of this chapter.
§ 7-86. through § 7-89. (Reserved)
Downloaded from https://ecode360.com/OA4108 on 2026-07-07
City of Oakdale, CA § 7-90
BUILDING CODES, ADMINISTRATION AND
§ 7-94
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Oakdale Municipal Code
- Chapter 1
- Chapter 2
- Chapter 3
- Article IV — Fees and Charges.
- Chapter 4
- Article I — In General
- Article II — Dogs
- Article III
- Article IV — Permissible Household Pets, Etc.
- Article V — Abatement of Vicious Dogs
- Chapter 6
- Chapter 7
- Article I — Administration — General
- Article XIII — System Development Charges
- Article I
- Article II
- Article III
- Article 300.21 — (a) is added to read as follows:
- Article IV
- Article V
- Article VI — California Energy Code [Ord. No. 1243-16; amended…
- Article VII
- Article VIII
- Article IX
- Article X
- Article XI
- Chapter 8 — Referenced Standards is amended as follows:
▸Article XII — Small Residential Rooftop Solar Energy System Pe…
Overview- § 7-80. Purpose. [Added 11-2-2015 by Ord. No. 1239]
- § 7-81. Definitions. [Added 11-2-2015 by Ord. No. 1239]
- § 7-82. Applicability. [Added 11-2-2015 by Ord. No. 1239]
- § 7-83. Solar Energy System Requirements. [Added 11-2-2015 by …
- § 7-84. Duties of Building Division and Building Official. [Ad…
- § 7-85. Expedited Permit Review and Inspection Requirements. […
- Article XIII
- Article XIV — Electric Vehicle Charging Station Permitting Str…
- Chapter 8
- Chapter 9
- Chapter 10
- Chapter 11
- Article II — Transactions and use tax.[3 ]
- Article III — Transient Occupancy Tax.[5 ]
- Article IV — Documentary Stamp Tax.[6 ]
- Article V — Financial Plan
- Article VI — City Treasurer Investments
- Article VII — Cannabis Business Tax [Added 12-10-2018 by Ord. …
- Article VIII — Parking and Business Improvement Area [Adopted …
- Article X — Crane Crossing Specific Plan - Plan Area Fee Progr…
- Chapter 12
- Chapter 1 — ADMINISTRATION PERMITS
- Chapter 1 — ADMINISTRATION
- Chapter 5 — FIRE SERVICE FEATURES FIRE APPARATUS ROADS
- Chapter 5
- Chapter 5
- Chapter 5
- Chapter 6
- Chapter 6
- Chapter 11
- Chapter 24 — FLAMABLE FINISHES
- Chapter 35
- Chapter 41
- Chapter 50 — HAZARDOUS MATERIALS GENERAL PROVISIONS
- Chapter 55
- Chapter 56
- Chapter 57
- Chapter 61
- Chapter 13
- Chapter 14
- Article VI — Disposal of Pharmaceutical Controlled Substances
- Article I — Waitresses and Entertainers
- Article II — Smoking at Council Meetings
- Article III — Smoking Pollution Control
- Article V — Waste Containers.
- Article VI — Disposal of Pharmaceutical Controlled Substances
- Chapter 15
- Chapter 16
- Chapter 17
- Chapter 18
- Article II — Abandoned, Wrecked, etc., Vehicles
- Article III — Railroad Crossing Permits
- Article IV
- Article V — Paid Parking Zones and Parking Permits[1 ]
- Article VI — Privately Owned and Maintained Roads and Parking …
- Article VII — Police Towing Services
- Article VIII — Traffic Rules
- Article X — Turning Movements
- Article XI — One-Way Alleys
- Article XII — Right-of-Way
- Article XIII — Public Offenses
- Article XIV — General Penalty
- Chapter 18A
- Chapter 19
- Article I — Offenses – Miscellaneous
- Article II — Graffiti[3 ]
- Article III
- Article IV — Coasting Devices
- Article V — Administrative Citation Process
- Article VI — Administrative Remedies
- Article VII
- Article VIII — Oakdale Massage Establishment Regulations
- Article X
- Article XI
- Article XII
- Article XIII
- Article XIV — Squatter Camps
- Article XV
- Article XVI — Noise Control [Added 5-6-2019 by Ord. No. 1263]
- Chapter 20
- Article III — Parks
- Article IV — Special Events
- Article V — Senior Citizens Commission
- Article VI — Drug Free Zones
- Chapter 21
- Chapter 22
- Article II — Police Relief and Pension Fund
- Chapter 23
- Chapter 24
- Chapter 25 — PURCHASES
- Chapter 26
- Article II — Collection and Disposal
- Article IV — Defacing Public and Private Property
- Article V — Legislative Recycling Mandates
- Chapter 28
- Article I — General Provisions
- Article II — Fees and Charges
- Article III — Sewer Mains and Sewer Laterals
- Article IV — Industrial Users
- Article V — Industrial Users' Discharge Permits
- Article VI — Enforcement
- Chapter 29
- Chapter 30
- Article II
- Article III — Trenching
- Article IV — Numbering of Streets
- Article V — Maintenance Districts
- Chapter 31
- Article II — Definitions and Responsibilities
- Article IV — Tentative Subdivision Maps
- Article V — Final Subdivision Maps
- Article VII — Vesting Tentative Maps for Residential Subdivisi…
- Article VIII — Dedications. Reservations, and Development Fees
- Article XI — Reversions to Acreage
- Article XII
- Article XIII — Correction and Amendment of Maps.
- Article XIV — Enforcement.
- Chapter 31A
- Chapter 32
- Chapter 33
- Article II — Disposition of Surplus Property
- Article III — Purchase by City Employees of Unclaimed or Surpl…
- Chapter 34
- Chapter 35
- Article II — Mains, Laterals and Hydrants
- Article III — Fees and Charges
- Article VII — Backflow and Cross-Connection Control
- Chapter 36
- Part I — General Provisions.
- Part II — Specific Plan Preparation Process.
- Part I — General Provisions
- Chapter 37
- Article II
- Article III — Regulations for Cannabis Businesses
- Article IV — Appeals and Enforcement
- Chapter DL