Title 14 — WATER AND SEWERS›Chapter 14.08 — PUBLIC SEWERAGE SYSTEM WASTES
5.2 INDIVIDUAL WASTEWATER DISCHARGE PERMIT CONTENTS
Norco Municipal Code · 2026-07 edition · updated 2026-10-02 · Norco
5.2.1 Individual wastewater discharge permits must contain:¶
5.2.1.1 A statement that indicates the wastewater discharge permit issuance date,…¶
5.2.1.2 A statement that the wastewater discharge permit is nontransferable without…¶
5.2.1.3 Effluent limits, including Best Management Practices, based on applicable…¶
5.2.1.4 Self-monitoring, sampling, reporting, notification, and record-keeping requirements.¶
5.2.1.5 A statement of applicable civil and criminal penalties for violation of…¶
5.2.1.6 Requirements to control Slug Discharge, if determined by the Administrator to be necessary.¶
5.2.2 Individual wastewater discharge permits may contain, but need not be limited to,…¶
5.2.2.1 Limits on the average and/or maximum rate of discharge, time of discharge,…¶
5.2.2.2 Requirements for the installation of pretreatment technology, pollution…¶
5.2.2.3 Requirements for the development and implementation of spill control plans or…¶
5.2.2.4 Development and implementation of waste minimization plans to reduce the amount…¶
5.2.2.5 A reference to a Rate Resolution that sets the unit charge or schedule of User…¶
5.2.2.6 Requirements for installation and maintenance of inspection and sampling…¶
5.2.2.7 A statement that compliance with the individual wastewater discharge permit…¶
5.2.2.8 Other conditions as deemed appropriate by the Administrator to ensure…¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code