Skip to content

Chapter 15.19 — ELECTRIC VEHICLE CHARGING STATIONS

Newport Beach Municipal Code · 2026-09 edition · updated 2026-09-27 · Newport Beach

§ 15.19.010. Purpose.

The purpose of this chapter is to adopt an expedited, streamlined electric vehicle charging station permitting process that complies with Assembly Bill (AB) 1236 (Chapter 598, Statutes 2015) and Assembly Bill (AB) 970 (Chapter 710, Statutes 2021) to achieve timely and cost-effective installations of electric vehicle charging stations. The provisions of this chapter encourage the use of electric vehicle charging stations by removing unreasonable barriers, minimizing costs to property owners and the City, and expanding the ability of property owners to install electric vehicle charging stations. The provisions of this chapter further allow the City to achieve these goals while protecting the public’s health, welfare and safety. (Ord. 2017-10 § 1 (part), 2017; Ord. 2022-26 § 13, 2022)

§ 15.19.020. Applicability.

A. This chapter applies to the permitting of all electric vehicle charging station systems in the City.

B. Electric vehicle charging station systems legally established or permitted prior to the
effective date of this chapter are not subject to the requirements of this chapter unless
physical modifications or alterations are undertaken that materially change the size, type,
or components of an electric vehicle charging station system. Routine operation and
maintenance or like-kind replacements of electric vehicle charging stations shall not
require a permit.
(Ord. 2017-10 § 1 (part), 2017)

§ 15.19.030. Definitions.

A. “Association” means a nonprofit corporation or unincorporated association created for the purpose of managing a common interest development.

B. “Electronic submittal” means the utilization of one or more of the following:

1. Email;

2. The Internet; or

3. Facsimile.

C. “Common interest development” means any of the following:

1. A community apartment project;

2. A condominium project;

3. A planned development; or

4. A stock cooperative.

D. “Electric vehicle charging station” or “charging station” means any level of electric vehicle
supply equipment that is designed and built in compliance with Article 625 of the
California Electrical Code, or any successor regulation, and delivers electricity from a

Downloaded from https://ecode360.com/NE4559 on 2026-09-25

City of Newport Beach, CA § 15.19.030 BUILDINGS AND CONSTRUCTION § 15.19.060

source outside an electric vehicle into a plug-in electric vehicle.

E. “Specific, adverse impact” means a significant, quantifiable, direct, and unavoidable
impact, based on objective, identified, and written public health or safety standards,
policies, or conditions as they existed on the date the application was deemed complete.

F. “Community Readiness Guidebook” means the guidebook published by the Office of
Planning and Research, with recommendations in the most current version of the “Plug-In
Electric Vehicle Infrastructure Permitting Checklist” of the “Zero-Emission Vehicles in
California.”
(Ord. 2017-10 § 1 (part), 2017)

§ 15.19.040. Electric vehicle charging station system requirements.

A. All electric vehicle charging station systems shall meet applicable health and safety standards and requirements imposed by the state and the California Fire Code, as adopted and amended by the City.

B. Electric vehicle charging station systems shall be certified by an accredited listing agency
as defined by the California Electrical Code.

C. Electric vehicle charging station systems shall meet all applicable safety and performance
standards established by the California Electrical Code, the Society of Automotive
Engineers, the National Electrical Manufacturers Association, and accredited testing
laboratories such as Underwriters Laboratories and rules of Public Utilities Commission
regarding safety and reliability.
(Ord. 2017-10 § 1 (part), 2017)

§ 15.19.050. Duties of the Building Division and Chief Building Official.

A. All documents required for the submission of an expedited electric vehicle charging station system application shall be made available on the publicly accessible City website.

B. Electronic submittal of the required permit application and documents by email, the
Internet, or facsimile shall be made available to all electric vehicle charging station system
permit applicants.

C. An applicant’s electronic signature shall be accepted on all forms, applications, and other
documents in lieu of a wet signature.

D. The electric vehicle charging station system permit process and checklist(s) shall
substantially conform to recommendations for expedited permitting, including the “Plug-In
Electric Vehicle Infrastructure Permitting Checklist” contained in the most current version
of the “Zero-Emission Vehicles in California: Community Readiness Guidebook”
published by the Office of Planning and Research.

E. The City Council, by resolution, may establish a fee for the processing of electric vehicle
charging station system applications.
(Ord. 2017-10 § 1 (part), 2017)

§ 15.19.060. Permit review requirements.

A. The Building Division shall administratively approve an application to install electric

Downloaded from https://ecode360.com/NE4559 on 2026-09-25

City of Newport Beach, CA § 15.19.060 NEWPORT BEACH CODE § 15.19.060

vehicle charging stations through issuance of a building permit or similar nondiscretionary
permit.

B. The Chief Building Official may require an applicant to apply for a use permit if the official
finds, based on substantial evidence, that the electric vehicle charging station system could
have a specific, adverse impact upon the public health and safety.

C. Review of the application shall be limited to the Chief Building Official’s review of
whether the application meets local, State, and Federal health and safety requirements.

D. If a use permit is required, the City may deny an application for the use permit if the City
makes written findings based upon substantive evidence in the record that the proposed
installation would have a specific, adverse impact upon public health or safety and there is
no feasible method to satisfactorily mitigate or avoid, as defined, the adverse impact. Such
findings shall include the basis for the rejection of the potential feasible alternative for
preventing the adverse impact.

E. Decisions regarding an electric vehicle charging station system permit application may be
appealed to the Planning Commission pursuant to Chapter 20.64, or any successor chapter.

F. Any condition imposed on an application shall be designed to mitigate the specific, adverse
impact upon health and safety at the lowest possible cost.

G. The City shall not condition approval of an application on the approval of an association,
as defined in Section 4080 of the California Civil Code, or any successor statute.

H. If an application is deemed incomplete, a written correction notice detailing all deficiencies
in the application and any additional information or documentation required to be eligible
for expedited permit issuance shall be sent to the applicant for resubmission.

I. The following timeline is established for the application for permits for electric vehicle
charging stations.

1. An application to install an electric vehicle charging station submitted to the Building
Official shall be deemed complete if, after the applicable time period described in
subsection (I)(2) of this section has elapsed, both of the following are true:

a. The Building Official has not deemed the application complete, consistent with
the checklist created by the City pursuant to Section 15.19.050.

b. The Building Official has not issued a written correction notice detailing all deficiencies in the application and identifying any additional information explicitly necessary for the Building Official to complete a review limited to whether the electric vehicle charging station meets all health and safety requirements of local, state, and federal law, consistent with subsection (H) of this section.

2. For the purposes of subsection (I)(1) of this section, “Applicable time period means”
either of the following:

a. Five business days after submission of the application to the City, if the
application is for at least one, but not more than twenty-five (25) electric vehicle
charging stations at a single site.

Downloaded from https://ecode360.com/NE4559 on 2026-09-25

City of Newport Beach, CA § 15.19.060 BUILDINGS AND CONSTRUCTION § 15.19.060

b. Ten (10) business days after submission of the application to the City, if the
application is for more than twenty-five (25) electric vehicle charging stations
at a single site.

J. The following timeline is established for the approval for permits for electric vehicle
charging stations.

1. An application to install an electric vehicle charging station shall be deemed approved
if the applicable time period described in subsection (J)(2) of this section has elapsed
and all of the following are true:

a. The Building Official has not administratively approved the application
pursuant to subsection (A) of this section.

b. The Building Official has not made a finding, based on substantial evidence,
that the electric vehicle charging station could have a specific adverse impact
upon the public health or safety or required the applicant to apply for a use
permit pursuant to subsection (B) of this section.

c. The Building Official has not denied the permit pursuant to subsection (D) of
this section.

d. An appeal has not been made to the Planning Commission pursuant to
subsection (E) of this section.

2. For the purposes of subsection (J)(1) of this section, “Applicable time period means”
either of the following:

a. Twenty (20) business days after the application was deemed complete, if the
application is for at least one, but not more than twenty-five (25) electric vehicle
charging stations at a single site.

b. Forty (40) business days after the application was deemed complete, if the application is for more than twenty-five (25) electric vehicle charging stations at a single site. (Ord. 2017-10 § 1 (part), 2017; Ord. 2022-26 § 13, 2022)

Downloaded from https://ecode360.com/NE4559 on 2026-09-25

City of Newport Beach, CA

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Newport Beach Municipal Code
Newport Beach Municipal Code
  1. Title 1 — GENERAL PROVISIONS
  2. Title 2 — ADMINISTRATION AND PERSONNEL
  3. Chapter 2.28 — TRAFFIC DIVISION AND ENGINEER
  4. Chapter 2.08 — CITY MANAGER1
  5. Chapter 2.12 — ADMINISTRATIVE DEPARTMENTS2
  6. Chapter 2.14 — CITY ATTORNEY’S OFFICE
  7. Chapter 2.16 — OFFICERS’ BONDS
  8. Chapter 2.20 — EMERGENCY SERVICES3
  9. Chapter 2.24 — CIVIL SERVICE SYSTEM
  10. Chapter 2.28 — PERSONNEL POLICY, COMPENSATION PLAN
  11. Chapter 2.30 — RECYCLING SERVICE FEE
  12. Chapter 2.32 — TRAFFIC DIVISION AND ENGINEER
  13. Chapter 2.36 — PEACE OFFICER’S TRAINING
  14. Title 3 — REVENUE AND FINANCE
  15. Chapter 3.04 — SALES AND USE TAX
  16. Chapter 3.08 — PROPERTY TAX
  17. Chapter 3.12 — PROPERTY DEVELOPMENT TAX
  18. Chapter 3.16 — UNIFORM TRANSIENT OCCUPANCY TAX1
  19. Chapter 3.20 — GASOLINE TAX
  20. Chapter 3.22 — REAL PROPERTY TRANSFER TAX
  21. Chapter 3.27 — MUNICIPAL FACILITIES REVENUE BOND CODE
  22. Chapter 3.28 — VISITOR’S SERVICE FEE2
  23. Chapter 3.30 — AIR QUALITY IMPROVEMENT TRUST FUND
  24. Chapter 3.32 — SPECIAL IMPROVEMENT DISTRICT FINANCING CODE
  25. Chapter 3.33 — ASSESSMENT DISTRICT ALTERNATIVE PROCEDURES
  26. Chapter 3.34 — MARINE CHARTER PASSENGER TAX
  27. Chapter 3.36 — COST RECOVERY FOR USER SERVICES
  28. Title 5 — BUSINESS LICENSES AND REGULATIONS
  29. Chapter 5.44 — DIRECT ALARM MONITORING
  30. Chapter 5.49 — BURGLARY – ROBBERY ALARM Chapter 5.55
  31. Chapter 5.97 — AND-MORTAR BUSINESSES
  32. Chapter 5.04 — GENERAL PROVISIONS1
  33. Chapter 5.08 — LICENSE FEE CATEGORIES2
  34. Chapter 5.11 — SPECIAL REGULATIONS
  35. Chapter 5.12 — VEHICLES FOR HIRE3
  36. Chapter 5.14 — AMBULANCE REGULATIONS
  37. Chapter 5.15 — REGULATION OF NEWPORT BEACH POLICE OFFICIAL TOW…
  38. Chapter 5.17 — TAXICABS
  39. Chapter 5.20 — PAWNBROKERS, SECONDHAND DEALERS AND JUNK DEALERS
  40. Chapter 5.25 — OPERATOR LICENSE FOR ESTABLISHMENTS OFFERING AL…
  41. Chapter 5.28 — LIVE ENTERTAINMENT ESTABLISHMENTS5
  42. Chapter 5.32 — CAFE DANCES6
  43. Chapter 5.36 — HOTEL REGISTRATION
  44. Chapter 5.42 — SOLICITATION
  45. Chapter 5.43 — STATE VIDEO FRANCHISES
  46. Chapter 5.44 — CABLE COMMUNICATIONS FRANCHISES
  47. Chapter 5.46 — REGULATION OF COMMERCIAL FILM PRODUCTION
  48. Chapter 5.48 — DIRECT ALARM MONITORING SYSTEM8
  49. Chapter 5.49 — BURGLARY – ROBBERY ALARM SYSTEMS9
  50. Chapter 5.50 — MASSAGE ESTABLISHMENTS10
  51. Chapter 5.55 — TOBACCO RETAILER BUSINESSES
  52. Chapter 5.60 — PARAMEDIC SERVICE USER FEES
  53. Chapter 5.70 — NEWSPAPER RACKS AND STANDS11
  54. Chapter 5.80 — RETAIL SALE OF FIREARMS
  55. Chapter 5.90 — ESCORT SERVICE
  56. Chapter 5.95 — SHORT TERM LODGING PERMIT
  57. Chapter 5.96 — ADULT-ORIENTED BUSINESS
  58. Chapter 5.97 — SIDEWALK VENDING PROGRAM
  59. Chapter 5.98 — ACCEPTANCE OF CASH BY BRICK-AND-MORTAR BUSINESSES
  60. Title 6 — HEALTH AND SANITATION
  61. Chapter 6.04 — GARBAGE, REFUSE AND CUTTINGS1
  62. Chapter 6.05 — USE OF EXPANDED POLYSTYRENE DISPOSABLE FOOD SER…
  63. Chapter 6.06 — STATE MANDATED MUNICIPAL SOLID WASTE DIVERSION …
  64. Chapter 6.08 — FOOD HANDLING SERVICES
  65. Chapter 6.25 — REGULATION OF SMOKING IN PUBLIC AREAS
  66. Chapter 6.30 — PROHIBITION OF SALE AND DISTRIBUTION OF FLAVORE…
  67. Chapter 6.40 — PROHIBITION OF SALE, DISTRIBUTION, AND USE OF N…
  68. Title 7 — ANIMALS
  69. Chapter 7.04 — DOGS1
  70. Chapter 7.06 — HORSES PROHIBITED ON BEACHES
  71. Chapter 7.08 — WILD ANIMALS
  72. Chapter 7.12 — LIVESTOCK
  73. Chapter 7.15 — FOWL
  74. Chapter 7.16 — ANIMALS AT LARGE – IMPOUNDING
  75. Chapter 7.20 — ANIMAL NUISANCES
  76. Chapter 7.25 — APIARIES
  77. Chapter 7.26 — PROTECTION OF NATURAL HABITAT FOR MIGRATORY AND…
  78. Chapter 7.30 — WILDLIFE PROTECTION
  79. Chapter 7.35 — REGULATION OF KENNELS
  80. Title 9 — FIRE CODE
  81. Chapter 9.04 — FIRE CODE
  82. Chapter 9.07 — WILDLAND-URBAN INTERFACE CODE
  83. Title 10 — OFFENSES AND NUISANCES
  84. Chapter 10.08 — USE OF PUBLIC PROPERTY AND § 10.16.010. Gambli…
  85. Chapter 10.54 — MATERIAL, WHICH IS HARMFUL TO
  86. Chapter 10.66 — LOUD AND UNRULY GATHERINGS Chapter 10.70
  87. Chapter 10.04 — INTOXICATING LIQUOR
  88. Chapter 10.06 — HUMAN WASTE
  89. Chapter 10.08 — USE OF PUBLIC PROPERTY AND INTERFERENCE WITH P…
  90. Chapter 10.12 — INTERFERING WITH LAW ENFORCEMENT
  91. Chapter 10.14 — PROHIBITION AGAINST CAMPING IN PUBLIC PLACES
  92. Chapter 10.16 — GAMBLING2
  93. Chapter 10.24 — DISCHARGE OF WEAPONS3
  94. Chapter 10.26 — COMMUNITY NOISE CONTROL
  95. Chapter 10.28 — LOUD AND UNREASONABLE NOISE4
  96. Chapter 10.32 — SOUND-AMPLIFYING EQUIPMENT6
  97. Chapter 10.36 — MINOR’S CURFEW
  98. Chapter 10.48 — WEED AND RUBBISH ABATEMENT8
  99. Chapter 10.50 — PUBLIC NUISANCE ABATEMENT
  100. Chapter 10.52 — ABANDONED OR WRECKED VEHICLES9
  101. Chapter 10.54 — PUBLIC NUDITY
  102. Chapter 10.58 — POLICE SERVICES AT LARGE PARTIES, GATHERINGS O…
  103. Chapter 10.59 — GRAFFITI
  104. Chapter 10.60 — REGULATION OF DISPLAY OF MATERIAL, WHICH IS HA…
  105. Chapter 10.64 — CONSTRUCTION AND MAINTENANCE PROJECTS IN RESID…
  106. Chapter 10.66 — LOUD AND UNRULY GATHERINGS
  107. Chapter 10.68 — TARGETED RESIDENTIAL PICKETING
  108. Chapter 10.70 — CANNABIS REGULATIONS
  109. Chapter 10.75 — PROHIBITION OF THE SALE AND DISTRIBUTION OF KR…
  110. Title 11 — RECREATIONAL ACTIVITIES
  111. Chapter 11.02 — AMUSEMENTS AND DANCING – HOURS1
  112. Chapter 11.03 — SPECIAL EVENTS
  113. Chapter 11.04 — PARKS, PARK FACILITIES, AND BEACHES
  114. Chapter 11.08 — CONDUCT ON BEACHES AND PIERS2
  115. Chapter 11.12 — SWIMMING REGULATIONS
  116. Chapter 11.16 — SURFING
  117. Chapter 11.17 — REGULATION OF VESSELS ALONG THE PACIFIC OCEAN
  118. Chapter 11.20 — FISHING REGULATIONS
  119. Chapter 11.24 — SPEARS AND DANGEROUS FISHING GEAR3
  120. Title 12 — VEHICLES AND TRAFFIC
  121. Chapter 12.28 — TURNING MOVEMENTS Chapter 12.36
  122. Chapter 12.04 — DEFINITIONS
  123. Chapter 12.08 — GENERAL PROVISIONS
  124. Chapter 12.12 — VEHICLES ON CITY PROPERTY
  125. Chapter 12.16 — ENFORCEMENT AND OBEDIENCE
  126. Chapter 12.20 — TRAFFIC CONTROL DEVICES AND MARKINGS
  127. Chapter 12.24 — SPECIAL SPEED ZONES
  128. Chapter 12.28 — TURNING MOVEMENTS
  129. Chapter 12.32 — RESTRICTED USE OF CERTAIN STREETS2
  130. Chapter 12.36 — STOP AND YIELD – REQUIREMENTS – SIGNS
  131. Chapter 12.40 — STOPPING, STANDING AND PARKING REGULATIONS
  132. Chapter 12.44 — STOPPING, STANDING AND PARKING RESTRICTIONS
  133. Chapter 12.46 — PARKING FOR PERSONS WITH DISABILITIES
  134. Chapter 12.48 — LOADING AND UNLOADING
  135. Chapter 12.52 — ONE-WAY STREETS AND ALLEYS
  136. Chapter 12.54 — OCEANFRONT BOARDWALK SAFETY PROGRAM
  137. Chapter 12.55 — UPPER NEWPORT BAY RECREATION AND SCENIC TRAIL
  138. Chapter 12.56 — BICYCLES AND SIMILAR DEVICES – REGISTRATION AN…
  139. Chapter 12.57 — SKATEBOARDING AND ROLLERSKATING REGULATIONS3
  140. Chapter 12.62 — TEMPORARY STREET CLOSURE
  141. Chapter 12.63 — SOLID WASTE MANAGEMENT4
  142. Chapter 12.64 — VEHICULAR NUISANCES
  143. Chapter 12.66 — PRIVATE ROADS
  144. Chapter 12.68 — RESIDENTS’ PREFERENTIAL PARKING
  145. Chapter 12.70 — PROHIBITION ON ATTENDING STREET RACES AND RECK…
  146. Title 13 — STREETS, SIDEWALKS AND PUBLIC PROPERTY
  147. Chapter 13.01 — STREET CONSTRUCTION PERMITS
  148. Chapter 13.05 — STREET IMPROVEMENTS AND DEDICATIONS
  149. Chapter 13.06 — CURB CUTS AND OTHER ALTERATIONS TO PUBLIC STRE…
  150. Chapter 13.07 — REPLACEMENT OF CURB CUTS AND DRIVEWAY APPROACHES
  151. Chapter 13.08 — PLANTING1
  152. Chapter 13.09 — PARKWAY TREES
  153. Chapter 13.12 — HOUSE NUMBERING
  154. Chapter 13.18 — USE OF PUBLIC SIDEWALKS FOR OUTDOOR DINING
  155. Chapter 13.20 — PUBLIC RIGHTS-OF-WAY
  156. Chapter 13.22 — PERSONAL WIRELESS SERVICE FACILITIES IN THE PU…
  157. Title 14 — WATER AND SEWERS
  158. Chapter 14.08 — WATER CONNECTIONS Chapter 14.12
  159. Chapter 14.20 — WATER METERS § 14.13.010. Recycled Water Rates
  160. Chapter 14.28 — INDUSTRIAL WASTES § 14.33.010. Purpose.
  161. Chapter 14.04 — UTILITIES DEPARTMENT – GENERAL REGULATIONS1
  162. Chapter 14.08 — WATER CONNECTIONS2
  163. Chapter 14.10 — CROSS-CONNECTION CONTROL PLAN
  164. Chapter 14.12 — WATER RATES AND CHARGES3
  165. Chapter 14.13 — RECYCLED WATER RATES
  166. Chapter 14.16 — WATER CONSERVATION AND WATER SUPPLY SHORTAGE P…
  167. Chapter 14.17 — WATER-EFFICIENT LANDSCAPING5
  168. Chapter 14.20 — WATER METERS6
  169. Chapter 14.24 — SEWER CONNECTION, PERMITS7
  170. Chapter 14.28 — INDUSTRIAL WASTES8
  171. Chapter 14.30 — FATS, OILS AND GREASE (FOG) CONTROL9
  172. Chapter 14.33 — WATER AND SEWER CAPITAL IMPROVEMENT FEE
  173. Chapter 14.34 — WATER WELL STANDARDS
  174. Chapter 14.36 — WATER QUALITY
  175. Title 15 — BUILDINGS AND CONSTRUCTION
  176. Chapter 15.02 — ADMINISTRATIVE CODE
  177. Chapter 15.03 — INTERNATIONAL PROPERTY MAINTENANCE CODE
  178. Chapter 15.04 — BUILDING CODE
  179. Chapter 15.05 — RESIDENTIAL CODE
  180. Chapter 15.06 — ELECTRICAL CODE
  181. Chapter 15.07 — MECHANICAL CODE
  182. Chapter 15.08 — PLUMBING CODE
  183. Chapter 15.09 — INTERNATIONAL SWIMMING POOL AND SPA CODE
  184. Chapter 15.10 — EXCAVATION AND GRADING CODE1
  185. Chapter 15.11 — GREEN BUILDING STANDARDS CODE
  186. Chapter 15.12 — POST-DISASTER SAFETY ASSESSMENT PLACARDS AND S…
  187. Chapter 15.13 — HISTORICAL BUILDING CODE
  188. Chapter 15.14 — EXISTING BUILDING CODE
  189. Chapter 15.15 — REPORT OF RESIDENTIAL BUILDING RECORDS
  190. Chapter 15.16 — SIGN CODE3
  191. Chapter 15.17 — ENERGY CODE
  192. Chapter 15.18 — SOLAR SYSTEMS
  193. Chapter 15.19 — ELECTRIC VEHICLE CHARGING STATIONS
  194. Chapter 15.20 — HOUSE MOVING5
  195. Chapter 15.28 — ABATEMENT OF SUBSTANDARD BUILDINGS
  196. Chapter 15.32 — UNDERGROUND UTILITIES
  197. Chapter 15.37 — APPROVAL IN CONCEPT PERMIT
  198. Chapter 15.38 — FAIR SHARE TRAFFIC CONTRIBUTION ORDINANCE
  199. Chapter 15.40 — TRAFFIC PHASING ORDINANCE6
  200. Chapter 15.42 — MAJOR THOROUGHFARE AND BRIDGE FEE PROGRAM
  201. Chapter 15.43 — RECREATION FACILITIES IMPROVEMENT FEE
  202. Chapter 15.44 — PUBLIC SAFETY DEVELOPMENT IMPACT FEES
  203. Chapter 15.45 — DEVELOPMENT AGREEMENTS
  204. Chapter 15.50 — FLOODPLAIN MANAGEMENT8
  205. Chapter 15.55 — METHANE OVERLAY ZONE
  206. Chapter 15.60 — CONSTRUCTION SITE FENCING AND SCREENING9
  207. Chapter 15.65 — SANTA ANA HEIGHTS REDEVELOPMENT
  208. Chapter 15.75 — STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONST…
  209. Chapter 15.80 — BUILDING AND FIRE BOARD OF APPEALS
  210. Title 17 — HARBOR CODE
  211. Chapter 17.01 — DEFINITIONS
  212. Chapter 17.05 — GENERAL PROVISIONS
  213. Chapter 17.10 — MARINE ACTIVITIES PERMIT1
  214. Chapter 17.20 — VESSEL LAUNCHING AND OPERATION
  215. Chapter 17.25 — BERTHING, MOORING AND STORAGE
  216. Chapter 17.30 — HARBOR USE REGULATIONS
  217. Chapter 17.35 — HARBOR DEVELOPMENT REGULATIONS
  218. Chapter 17.40 — LIVE-ABOARDS2
  219. Chapter 17.45 — SANITATION
  220. Chapter 17.50 — HARBOR DEVELOPMENT PERMITS
  221. Chapter 17.55 — DREDGING PERMITS
  222. Chapter 17.60 — HARBOR PERMITS AND LEASES
  223. Chapter 17.65 — APPEALS OR CALLS FOR REVIEW
  224. Chapter 17.70 — ENFORCEMENT
  225. Title 19 — SUBDIVISIONS
  226. Chapter 19.16 — TENTATIVE MAP EXPIRATION AND § 19.24.010. Stre…
  227. Chapter 19.36 — COMPLETION OF IMPROVEMENTS Chapter 19.44
  228. Chapter 19.04 — GENERAL PROVISIONS
  229. Chapter 19.08 — TENTATIVE MAP FILING
  230. Chapter 19.12 — TENTATIVE MAP REVIEW
  231. Chapter 19.16 — TENTATIVE MAP EXPIRATION AND EXTENSION
  232. Chapter 19.20 — VESTING TENTATIVE MAPS
  233. Chapter 19.24 — SUBDIVISION DESIGN
  234. Chapter 19.28 — SUBDIVISION IMPROVEMENTS
  235. Chapter 19.32 — IMPROVEMENT PLANS
  236. Chapter 19.36 — COMPLETION OF IMPROVEMENTS
  237. Chapter 19.40 — GENERAL DEDICATION REQUIREMENTS
  238. Chapter 19.44 — GENERAL RESERVATION REQUIREMENTS
  239. Chapter 19.48 — SCHOOL SITES AND FEES
  240. Chapter 19.52 — PARK DEDICATIONS AND FEES
  241. Chapter 19.56 — FINAL MAP FILING
  242. Chapter 19.60 — FINAL MAP REVIEW
  243. Chapter 19.64 — CONVERSION OF RENTAL UNITS TO OWNERSHIP
  244. Chapter 19.68 — MERGER OF CONTIGUOUS LOTS
  245. Chapter 19.72 — REVERSIONS TO ACREAGE
  246. Chapter 19.76 — LOT LINE ADJUSTMENTS
  247. Chapter 19.80 — CERTIFICATES OF COMPLIANCE
  248. Chapter 19.90 — PARCEL MAPS FOR URBAN LOT SPLITS
  249. Title 20 — PLANNING AND ZONING
  250. Chapter 20.12 — INTERPRETATION OF ZONING CODE § 20.18.010. Pur…
  251. Chapter 20.24 — STANDARDS
  252. Chapter 20.60 — ADMINISTRATIVE RESPONSIBILITY § 20.68.010. Pur…
  253. Chapter 20.62 — PUBLIC HEARINGS Chapter 20.70
  254. Chapter 20.10 — PURPOSE AND APPLICABILITY OF THE ZONING CODE
  255. Chapter 20.12 — INTERPRETATION OF ZONING CODE PROVISIONS
  256. Chapter 20.14 — ZONING MAP
  257. Chapter 20.16 — DEVELOPMENT AND LAND USE APPROVAL REQUIREMENTS
  258. Chapter 20.18 — RESIDENTIAL ZONING DISTRICTS (R-A, R-1, R-BI, …
  259. Chapter 20.20 — COMMERCIAL ZONING DISTRICTS (OA, OG, OM, OR, C…
  260. Chapter 20.22 — MIXED-USE ZONING DISTRICTS (MU-V, MU-MM, MU-DW…
  261. Chapter 20.24 — INDUSTRIAL ZONING DISTRICT (IG)
  262. Chapter 20.26 — SPECIAL PURPOSE ZONING DISTRICTS (OS, PC, PF, …
  263. Chapter 20.28 — OVERLAY ZONING DISTRICTS (MHP, PM, B, HO, H)
  264. Chapter 20.30 — PROPERTY DEVELOPMENT STANDARDS
  265. Chapter 20.32 — DENSITY BONUS
  266. Chapter 20.36 — LANDSCAPING STANDARDS
  267. Chapter 20.38 — NONCONFORMING USES AND STRUCTURES
  268. Chapter 20.40 — OFF-STREET PARKING
  269. Chapter 20.42 — SIGN STANDARDS
  270. Chapter 20.44 — TRANSPORTATION DEMAND MANAGEMENT REQUIREMENTS
  271. Chapter 20.46 — TRANSFER OF DEVELOPMENT RIGHTS
  272. Chapter 20.48 — STANDARDS FOR SPECIFIC LAND USES
  273. Chapter 20.49 — WIRELESS TELECOMMUNICATIONS FACILITIES
  274. Chapter 20.50 — PERMIT APPLICATION FILING AND PROCESSING
  275. Chapter 20.52 — PERMIT REVIEW PROCEDURES
  276. Chapter 20.54 — PERMIT IMPLEMENTATION, TIME LIMITS, AND EXTENS…
  277. Chapter 20.56 — PLANNED COMMUNITY DISTRICT PROCEDURES
  278. Chapter 20.58 — SPECIFIC PLAN PROCEDURES
  279. Chapter 20.60 — ADMINISTRATIVE RESPONSIBILITY
  280. Chapter 20.62 — PUBLIC HEARINGS
  281. Chapter 20.64 — APPEALS
  282. Chapter 20.66 — AMENDMENTS
  283. Chapter 20.68 — ENFORCEMENT
  284. Chapter 20.70 — DEFINITIONS
  285. Chapter 20.90 — SANTA ANA HEIGHTS SPECIFIC PLAN1
  286. Title 21 — LOCAL COASTAL PROGRAM IMPLEMENTATION PLAN
  287. Chapter 21.10 — PURPOSE AND APPLICABILITY OF § 21.16.010. Purp…
  288. Chapter 21.46 — TRANSFER OF DEVELOPMENT Chapter 21.50
  289. Chapter 21.54 — PERMIT IMPLEMENTATION, TIME § 21.68.010. Purpo…
  290. Chapter 21.90 — SANTA ANA HEIGHTS SPECIFIC PLAN
  291. Chapter 21.10 — PURPOSE AND APPLICABILITY OF THE IMPLEMENTATIO…
  292. Chapter 21.12 — INTERPRETATION OF IMPLEMENTATION PLAN PROVISIONS
  293. Chapter 21.14 — COASTAL MAPS
  294. Chapter 21.16 — DEVELOPMENT AND LAND USE APPROVAL REQUIREMENTS
  295. Chapter 21.18 — RESIDENTIAL COASTAL ZONING DISTRICTS (R-A, R-1…
  296. Chapter 21.20 — COMMERCIAL COASTAL ZONING DISTRICTS (CC, CG, C…
  297. Chapter 21.22 — MIXED-USE COASTAL ZONING DISTRICTS (MU-V, MU-M…
  298. Chapter 21.26 — SPECIAL PURPOSE COASTAL ZONING DISTRICTS (OS, …
  299. Chapter 21.28 — OVERLAY COASTAL ZONING DISTRICTS (MHP, PM, B, …
  300. Chapter 21.30 — PROPERTY DEVELOPMENT STANDARDS
  301. Chapter 21.32 — DENSITY BONUS
  302. Chapter 21.35 — WATER QUALITY CONTROL
  303. Chapter 21.38 — NONCONFORMING USES AND STRUCTURES
  304. Chapter 21.40 — OFF-STREET PARKING
  305. Chapter 21.44 — TRANSPORTATION AND CIRCULATION
  306. Chapter 21.46 — TRANSFER OF DEVELOPMENT RIGHTS
  307. Chapter 21.48 — STANDARDS FOR SPECIFIC LAND USES
  308. Chapter 21.49 — WIRELESS TELECOMMUNICATIONS FACILITIES
  309. Chapter 21.50 — PERMIT APPLICATION FILING
  310. Chapter 21.52 — COASTAL DEVELOPMENT REVIEW PROCEDURES
  311. Chapter 21.54 — PERMIT IMPLEMENTATION, TIME LIMITS, AND EXTENS…
  312. Chapter 21.62 — PUBLIC HEARINGS
  313. Chapter 21.64 — APPEALS AND CALLS FOR REVIEW
  314. Chapter 21.68 — ENFORCEMENT
  315. Chapter 21.70 — DEFINITIONS
  316. Chapter 21.90 — SANTA ANA HEIGHTS SPECIFIC PLAN

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.